Tender Value
₹2.1 Cr
EMD Value
₹2.6 L
Closing Date
30 Mar 2026, 10:30 amClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
45 days
Expenditure
Capital (Works)
GENERAL
17 conditions · 2 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees. N = Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of 'total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
The balance sheet and all other financial documents attested/certified by CAs to substantiate fulfilment of Financial Eligibility Criteria should be with UDIN, failing which the offer is likely to be rejected without any further reference.
The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i) Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or (ii) Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or (iii) One similar work costing not less than the amount equal to 60% of advertised value of the tender.
Defination of Similar Work :- Supply, installation, testing and commissioning of HT panels/LT panels, cable laying, wiring/rewiring of any building/office in central government or state government or public sector undertakings (also called Public sector Undertakings (also called public sector enterprise)
Substantially Completed Work means an ongoing work in which payment equal to or more than 90% of the present contract value (excluding the payment made for adjustment of Price variation (PVC), if any) has been made to the contractor in that ongoing contract and no proceedings of termination of contract on Contractor's default has been initiated. The credential certificate in this regard should have been issued not prior to 60 days of date of invitation of present tender.
Work experience certificate from private individual shall not be considered. However, in addition to work experience certificates issued by any Govt. Organisation, work experience certificate issued by Public listed company having average annual turnover of Rs 500 crore and above in last 3 financial years excluding the current financial year, listed on National Stock Exchange or Bombay Stock Exchange, incorporated/registered at least 5 years prior to the date of closing of tender, shall also be considered provided the work experience certificate has been issued by a person authorized by the Public listed company to issue such certificates. In case tenderer submits work experience certificate issued by public listed company, the tenderer shall also submit along with work experience certificate, the relevant copy of work order, bill of quantities, bill wise details of payment received duly certified by Chartered Accountant, TDS certificates for all payments received and copy of final/last bill paid by company in support of above work experience certificate.
28 conditions · 6 needing a document upload
Mandate form should be uploaded as per attached format in document tab.
GST : Tenderer has to fulfill GST Compliance as per Govt. norms
Tenderer may upload GST registration number and certificate.
PAN Card: Tenderers are required to upload their Permanent Account Number (PAN) card.
Contact details of tenderer: The Contractor shall submit their complete official address, e-mail address, telephone no., mobile no. and fax no. so that necessary communication can be made by the Railways as and when required.
Employment/Partnership etc. of Retired Railway Employees: Detailed vide para 16 of Annexure-I of GCC 2022
Employment/Partnership etc. of Retired Railway Employees: (a) Should a tenderer i) be a retired Engineer of the gazetted rank or any other gazetted officer working before his retirement, whether in the executive or administrative capacity or whether holding a pensionable post or not, in the Engineering or any other department of any of the railways owned and administered by the President of India for the time being, OR ii) being partnership firm / joint venture (JV) / registered society / registered trust etc have as one of its partners a retired Engineer of the gazetted rank or any other gazetted officer working before his retirement, OR iii) being an incorporated company have any such retired Engineer of the gazetted rank or any other gazetted officer working before his retirement as one of its directors AND in case where such Engineer or officer had not retired from government service at least 1 year prior to the date of submission of the tender THEN the tenderer will give full information as to the date of retirement of such Engineer or gazetted officer from the said service and as to whether permission for taking such contract, or if the Contractor be a partnership firm or an incorporated company, to become a partner or director as the case may be, has been obtained by the tenderer or the Engineer or officer, as the case may be from the President of India or any officer, duly authorized by him in this behalf, shall be clearly stated in writing at the time of submitting the tender. b) In case, upon successful award of contract, should a tenderer depute for execution of the works under or to deal matters related with this contract, any retired Engineer of gazette rank or retired gazetted officer working before his retirement in the Engineering or any other department of any of the railways owned and administered by the President of India for the time being, and now in his employment, then the tenderer will ensure that retired Engineer or retired gazetted officer had retired from government service at least 1 year prior to the date of his employment with tenderer and in case he had retired from service within a year then he possesses the requisite permission from the President of India or any officer, duly authorized by him in this behalf, to get associated with the tenderer . c) Should a tenderer or Contractor being an individual, have member(s) of his family or in the case of partnership firm/ company / joint venture (JV) / registered society / registered trust etc. one or more of partners(s)/shareholder(s) or member(s) of the family of partner(s)/ shareholder(s) having share of more than 1% in the tendering entity employed in gazetted capacity in the Engineering or any other department of the railway, then the tenderer at the time of submission of tender, will inform the authority inviting tenders the details of such persons. If information as required as per 16.a), b), c) above has not been furnished, contract is liable to be dealt in accordance with provision of clause 62 of Standard General Condition of contract. Format for declaration in this regard is attached with the tender document.
Mention status of firm: Individual Firm / Proprietorship Firm / Partnership Firm /Private Ltd. Firm / Public Ltd. Firm OR Government Undertaking.
Performance Guarantee: (a)The successful bidder shall have to submit a Performance Guarantee (PG) within 21 (Twenty one) days from the date of issue of Letter of Acceptance (LOA). Extension of time for submission of PG beyond 21 (Twenty one) days and upto 60 days from the date of issue of LOA may be given by the Authority who is competent to sign the contract agreement. However, a penal interest of 12% per annum shall be charged for the delay beyond 21(Twenty one) days, i.e. from 22nd day after the date of issue of LOA. Further, if the 60thday happens to be a declared holiday in the concerned office of the Railway, submission of PG can be accepted on the next working day. In all other cases, if the Contractor fails to submit the requisite PG even after 60 days from the date of issue of LOA, the contract is liable to be terminated. In case contract is terminated railway shall be entitled to forfeit Bid Security and other dues payable to the contractor against that particular contract, subject to maximum of PG amount. In case a tenderer has not submitted Bid Security on the strength of their registration as a Startup recognized by Department of Industrial Policy and Promotion (DIPP) under Ministry of Commerce and Industry, DIPP shall be informed to this effect. The failed Contractor shall be debarred from participating in re-tender for that work. (b) The successful bidder shall submit the Performance Guarantee (PG) in any of the following forms, amounting to 5% of the original contract value:- (i) A deposit of Cash; (ii) Irrevocable Bank Guarantee; (iii) Government Securities including State Loan Bonds at 5% below the market value; (iv) Pay Orders and Demand Drafts tendered by any Scheduled Commercial Bank of India; (v) Guarantee Bonds executed or Deposits Receipts tendered by any Scheduled Commercial Bank of India; (vi) Deposit in the Post Office Saving Bank; (vii) Deposit in the National Savings Certificates; (viii) Twelve years National Defence Certificates; (ix) Ten years Defence Deposits; (x) National Defence Bonds and (xi) Unit Trust Certificates at 5% below market value or at the face value whichever is less. Also, FDR in favour of FA&CAO (free from any encumbrance) may be accepted.
The Performance Guarantee shall be submitted by the successful bidder after the Letter of Acceptance (LOA) has been issued, but before signing of the contract agreement. This P.G. shall be initially valid upto the stipulated date of completion plus 60 days beyond that. In case, the time for completion of work gets extended, the Contractor shall get the validity of P.G. extended to cover such extended time for completion of work plus 60 days. (d) The value of PG to be submitted by the Contractor is based on original contract value and shall not change due to subsequent variation(s) in the original contract value. (e) The Performance Guarantee (PG) shall be released after physical completion of the work based on 'Completion Certificate' issued by the competent authority stating that the Contractor has completed the work in all respects satisfactorily. (f) Whenever the contract is rescinded, the Performance Guarantee already submitted for the contract shall be encashed. (g) The Engineer shall not make a claim under the Performance Guarantee except for amounts to which the President of India is entitled under the contract (not withstanding and/or without prejudice to any other provisions in the contract agreement) in the event of: (i) Failure by the Contractor to extend the validity of the Performance Guarantee as described herein above, in which event the Engineer may claim the full amount of the Performance Guarantee. (ii) Failure by the Contractor to pay President of India any amount due, either as agreed by the Contractor or determined under any of the Clauses/Conditions of the Agreement, within 30 days of the service of notice to this effect by Engineer. (iii) The Contract being determined or rescinded under clause 62 of these conditions.
Security Deposit: The Security Deposit shall be 5% of the contract value. The Bid Security submitted by the Contractor with his tender will be retained/encashed by the Railways as part of security for the due and faithful fulfillment of the contract by the Contractor. Provided further that, if Contractor submits the Cash or Term Deposit Receipt issued from a Scheduled commercial bank of India or irrevocable Bank Guarantee Bond from a Scheduled commercial bank of India, either towards the Full Security Depositor the Part Security Deposit equal to or more than Bid Security, the Railway shall return the Bid Security, to the Contractor. Balance of Security Deposit may be deposited by the Contractor in cash or Term Deposit Receipt issued from Scheduled commercial bank of India or irrevocable Bank Guarantee bond issued from Scheduled commercial bank of India, or may be recovered at the rate of 6% of the bill amount till the full Security Deposit is recovered. Provided also that in case of defaulting Contractor, the Railway may retain any amount due for payment to the Contractor on the pending "on account bills" so that the amounts so retained (including amount guaranteed through Performance Guarantee) may not exceed 10% of the total value of the contract. The Irrevocable Bank Guarantee submitted towards Security deposit shall be initially valid up to the stipulated date of Maintenance period plus 60 days and shall be extended from time to time, depending upon extension of contract granted in terms of Clause 17A and 17B of the Standard General Conditions of Contract. Note: Security Deposit deposited in cash by the Contractor or recovered from the running bills of a Contractor or submitted by contractor as Term Deposit Receipt(s) can be refunded/returned to the contractor, in lieu of irrevocable Bank Guarantee bond issued from scheduled commercial bank of India, to be submitted by him, for an amount equal to or more than the already available Security Deposit, provided however that, in a contract of value less than Rs. 50 Crore, such refund/ return of the already available Security Deposit is permitted up to two times and in a contract of value equal to or more than Rs. 50 Crore, such refund / return of the already available Security Deposit is permitted up to three times.
Refund of Security Deposit: Security Deposit mentioned in sub clause (1) above shall be returned to the Contractor along with or after, the following: (a) Final Payment of the Contract as per clause 51.(1) and (b) Execution of Final Supplementary Agreement or Certification by Engineer that Railway has No Claim on Contractor and (c) Maintenance Certificate issued, on expiry of the maintenance period as per clause 50.(1), in case applicable. 16. (2) (ii) Forfeiture of Security Deposit: Whenever the contract is rescinded as a whole under clause 62 (1) of these conditions, the Security Deposit already with railways under the contract shall b e forfeited. However, in case the contract is rescinded in part or parts under clause 62 (1) of these conditions, the Security Deposit shall not be forfeited. 16.(3) No interest shall be payable upon the Bid Security and Security Deposit or amounts payable to the Contractor under the Contract, but Government Securities deposited in terms of SubClause 16.(4) (b) of this clause will be payable with interest accrued thereon
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Shramikkalyan portal:- (i) Contractor is to abide by the provisions of various labour laws in terms of above clause 54,55, 55-A and 55-B of Indian Railways Standard General Conditions of Contract. In order to ensure the same, an application has been developed and hosted on website 'www.shramikkalyan.indianrailways.gov.in'. Contractor shall register his firm/company etc. and upload requisite details of labour and their payment in this portal. These details shall be available in public domain. The registration /updation in Portal shall be done as under: (a)Contractor shall apply for one time registration of his company/firm etc. in the Shramikkalyan portal with requisite details subsequent to issue of Letter of Acceptance. Engineer shall approve the contractor's registration in the portal within 7 days of receipt of such request. (b)Contractor once approved by any Engineer, can create password with login ID (PAN No.) for subsequent use of portal for all Letter of Acceptances (LOAs)issued in his favour. (c)The contractor once registered on the portal, shall provide details of his Letter of Acceptances (LOAs)/ Contract Agreements on shramikkalyan portal within 15 days of issue of any LOA for approval of concerned Engineer. Engineer shall update (if required) and approve the details of LOA filled by contractor within 7 days of receipt of such request. (d)After approval of LOA by Engineer, contractor shall fill the salient details of contract labours engaged in the contract and ensure updating of each wage payment to them on shramikkalyan portal on monthly basis. (e)It shall be mandatory upon the contractor to ensure correct and prompt uploading of all salient details of engaged contractual labour & payments made thereof after each wage period. (ii)While processing payment of any 'On Account Bill' or 'Final Bill' or release of 'Advances' or 'Performance Guarantee / Security deposit', contractor shall submit a certificate to the Engineer or Engineer's representatives that "I have uploaded the correct details of contract labours engaged in connection with this contract and payments made to them during the wage period in Railway's Shramikkalyan portal at 'www.shramikkalyan.indianrailways.gov.in' till____Month,____Year.
Guarantee/Warrantee: The installation will be handed over to the Department after necessary testing and commissioning. The installation will be guaranteed against any defective design/ workman-ship. Similarly, the materials supplied by the contractor will be guaranteed against any manufacturing defect, inferior quality. The complete luminaire/LED bulb shall have replacement guarantee for satisfactory performance and manufacturing defects for a period of 60 months from the date of commissioning or 72 months from the date of supply whichever is earlier. For switch gear components and panels, warrantee should be 1year after date of installation, for all other items, the warrantee period will be for a period of 12 months from the date of handing over to the Department. Installation/ equipment or components thereof shall be rectified/repaired to the satisfaction of the Engineer-in-charge.
Please read all the documents before submission of Tender.
Any other reputed make/brand other than as specified in the explanatory note/Tender may be considered during execution of the works on an urgent basis, subject to technical suitability, conformity to relevant IS/IEC standards, and approval of the Competent Authority. Where the specified BEE star rating is not manufactured/available for the required capacity the highest available BEE star rating at the time of procurement shall be accepted against submission of OEM documentary evidence and approval of the Competent Authority. Any such change shall be made without any additional financial implication to the Railway unless otherwise specifically approved by the Competent Authority.
Upgradation and Replacement of Old Electrical Equipments at Tikiapara Car Shed.
ELECT-CHG25-26-TPKRCAR-42
ELECT-CHG25-26-TPKRCAR-42
Open
Works - General
12 Months
Howrah, West Bengal
₹0
₹2.6 L
30 Mar 2026
23 Feb 2026
16 Mar 2026
125 items across 2 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| Supply and Testing of OEM TTA Distribution panel, consisting of Incoming- MCCB 4P 250 A Qty -01, Outgoing -i) MCCB 4P 100 A Qty -02, ii) MCCB 4P 63 A Qty - 01, iii) MCB 2P 40 A Qty - 04, iv) MCB 2P 32 A Qty- 02 with suitable TPN 250 A copper busbar, indication lights, suitable spreder link, contactor with all modern facilites required for scada, volt meter, amp meter energy meter time switches etc. . Panel should be as per IEC 61439 or latest. | — | 2.00 | — | — | |
| Erection, Installation and commissioning of TTA make Distribution panel . including civil job. | — | 2.00 | — | — | |
| Supply and Testing of OEM TTA Distribution panel, consisting of Incoming- MCCB 4P 400 A Qty -01, Outgoing -i) MCCB 4P 250 A Qty -02, ii) MCCB 4P 100 A Qty - 02, iii) MCB 2P 63 A Qty - 02, iv) MCB 2P 40 A Qty- 04 v) MCB 2P 32 A Qty- 04 with suitable TPN 400 A copper busbar, indication lights, suitable spreder link, contactor with all modern facilities required for scada, volt meter, amp meter energy meter time switches etc. Panel should be as per IEC 61439 or latest. | — | 2.00 | — | — | |
| Erection, Installation and commissioning of TTA make Distribution panel . including civil job. | — | 2.00 | — | — | |
| Supply and Testing of OEM TTA Distribution panel, consisting of Incoming- MCCB 4P 100 A Qty -01, Outgoing -i) MCCB 4P 63A Qty -02, ii) MCB 3P 40 A Qty - 02, iii) MCB 2P 40 A Qty - 02,with suitable TPN 100 A copper busbar, indication lights, suitable spreder link, contactor with all modern facilities required for scada, volt meter, amp meter energy meter time switches etc. Panel should be as per IEC 61439 or latest. | — | 2.00 | — | — |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
cablespec.pdf
ATTACHMENT
LEDSpecificationScan_compressed.pdf light spec
ATTACHMENT
RAILWAYEMPLOYMENTCERTIFICATE.pdf RAILWAY EMPLOYMENT CERTIFICATE
ATTACHMENT
ExplanatorynoteTPKRmod2-1-11.pdf
ATTACHMENT
GENERALCONDITIONSOFTENDER.pdf
ATTACHMENT
SPECIALCONDITIONOFTENDER.pdf
ATTACHMENT
JPOfordiggnigwork_2.pdf
ATTACHMENT
JPOforconcealedwiring_1.pdf
ATTACHMENT
GCC_April-2022_2022_CE-I_CT_GCC-2022_POLICY_27_04_22.pdf
ATTACHMENT
GCC-2022Correctionslip1.pdf
ATTACHMENT
AdvanceCorrectionSlipNo.2.pdf
ATTACHMENT
LEDSpecificationScan_compressed.pdf
ATTACHMENT
RAILWAYEMPLOYMENTCERTIFICATE.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .