Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.0 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹5.0 L+₹1,381 (0.28%)Rejected-AOC | L2 | Rejected-AOC Rejected |
Tender Value
₹6 L
EMD Value
₹6,000
Closing Date
24 Oct 2024, 3:00 pmClosed
Assistant Commisssioner,West Zone
West Zone, Coimbatore Corporation
Restoration of Cement Concrete Flooring in Nanjappan kovil street in ward no 37 of west zone.
2024_MAWS_494781_14
E5/WESTZONE/2024
Open Tender
Civil Works
Works
90 days
West Zone, Coimbatore Corporation
As per the tender conditions attached
4 documents required · 4 mandatory
₹0
₹6,000
12 Apr 2025
19 Oct 2024
25 Oct 2024
19 Oct 2024
24 Oct 2024
19 Oct 2024
Amount
1. Earth work Excavation in all soild with initial lead and lift etc., complete
2. Conveying the excavated earth,desilting materials dismantling concrete from the site to the distance of 15kms out side of the city limit including all initial lead, lift, loading and unloading with transportation charges etc complete as per the direction of departmental officers.
3. Providing and laying well gravel including cost and conveyance of all materials from approved quarries as noted in lead chart to the road side including loading, unloading and stacking the well gravel at road side to departmental gauge for pre-measurement including labour charges for laying spreading leveling to camper etc., complete as per specifications.
4. Cement concrete 1:4:8 (one cement, four sand and Eight aggregate) using 40mm gauge hand broken granite stone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15 cm thick and compacted, etc., complete complying with standard specification.
5. Centering with steel centering for revertment, drain and culvert upto 1.20m depth etc., complete
6. Plain Cement Concrete 1:2:4 (one cement, two fine aggregates and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard Specification
7. Charges towards finishing the top surface using power trowel including cost of tools, disel and labour charges etc., complete
8. Providing groove cutting for CC flooring of full depth and filling the depth using Tar including cost of conveyance of all materials to work site and labours etc., complete
M.S.& CO (BID ID -1171372)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_588042.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .