Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹36.8 CrAccepted-AOC | ₹36.8 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹39.0 CrRejected-AOC | ₹39.0 Cr | L2 | Rejected-AOC L2 |
| 3 | L3₹40.0 CrRejected-AOC | ₹40.0 Cr | L3 | Rejected-AOC L3 |
Tender Value
₹35.1 Cr
EMD Value
₹70.2 L
Closing Date
3 Feb 2025, 2:00 pmClosed
O/O The Chief Engineer,TC,DoHUA,Guwahati
O/O The Chief Engineer,TC,DoHUA,Guwahati
Improvement of Drainage at Dibrugarah Town, Phase-I
2025_DHUA_42323_1
CE/H and UA/Tech/17/PT-III/23-24/125
Open Tender
Civil Works
730 days
Dibrugarh
Please refer Tender documents.
3 documents required · 3 mandatory
₹20,000
₹70.2 L
Yes
28 Mar 2025
23 Jan 2025
4 Feb 2025
23 Jan 2025
3 Feb 2025
23 Jan 2025
Amount
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in charge. 2.6.1 All kinds of soil
Open timbering over areas including strutting, shoring etc. complete.(Measurements to be taken of the face area timbered): 2.22.1 Depth not exceeding 1.5 m
Open timbering over areas including strutting, shoring etc. complete.(Measurements to be taken of the face area timbered): 2.22.2 Depth exceeding 1.5 m but not exceeding 3 m
Dry brick pitching half brick thick in drains including supply of bricks and preparing the surface complete : 16.12.1 With common burnt clay F.P.S. (non modular) bricks of class designation 7.5
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 4.1.3 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 5.1.2A 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) incuding manu factured sand derived from Recycled Concrete Aggregate (RCA) upto 20% : 3 graded stone aggregate 20 mm nominal size of Recycled Concrete Aggregate (RCA) upto 20%.
Centering and shuttering including strutting, propping etc. and removal of form for 5.9.1 Foundations, footings, bases of columns, etc. for mass concrete
Centering and shuttering including strutting, propping etc. and removal of form for 5.9.2 Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc
Centering and shuttering including strutting, propping etc. and removal of form for 5.9.3 Suspended floors, roofs, landings, balconies and access platform
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level 5.22.3 Cold twisted bars
Lakhi Chutia (BID ID -257256)
Ranjan Dutta (BID ID -257217)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tenderdocument.pdf
Tender Documents • 0.64 MB
BOQ.xls
BOQ • 0.28 MB
Tenderdocument_2.pdf
Tender Documents • 0.08 MB
Tenderdocument_3.pdf
Tender Documents • 0.31 MB
Download all tender documents and submit your bid