Loading…
Loading…
Tender Value
₹22.0 L
EMD Value
₹44,100
Closing Date
20 Jul 2026, 6:00 pm
SE/SOUTH CIRCLE/SD SECTOR
SE/SOUTH CIRCLE/SD SECTOR
Desilting, repairing and renovation of R.S. Verma drain from the junction of Rajmohan Road to Bally Khal at ward no-19 within Uttarpara-Kotrung Municipality.
2026_KMDA_1029723_1
05/SE (South)/SD/KMDA of 2026-2027 Dated 18/06/2026
Open Tender
CIVIL WORKS
180 days
Uttarpara
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹44,100
25 Jun 2026
25 Jun 2026
22 Jul 2026
25 Jun 2026
20 Jul 2026
25 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cutting uprooting and clearing jungles including shrubs, water weeds,bushes, trees, plants, upto 30 cm. girth including removing as directed by Engineer-in-charge.
(Considering 50% of total lenght) | 900 | Sqm | 5 | ₹4,500 |
| 2 | Earthwork in re-excavation / silt clearance in drainage channel in all kinds of soil including sludge, slush mixed with all sorts of industrial wastes and municipal garbages, polypacks, carcasses, small khatal effluents, night soil etc. by mathor labour as may be necessary and depositing the same in places as directed by the Engineer-in-charge , in such a manner, without causing much hindrance to traffic and posing health hazard and making arrangement to maintain the site in workable condition and rough dressing when dry including making arrangement of bailing out of any seepage water and removal of sand or soil blown from underneath, removal of khatal, temporary latrines, clearing and removing all kinds of semi compact masses formed by water hyacinth, jungles up to 30 cm girth, and burning them to ashes or removing outside Government land in conformity with the Municipal rules, including shoring shuttering as required, nicking out lines etc. (Measurement : Pre-work and Post-work level section. Pre- work section to be taken after removal of water hyacinth and all other floating materials etc.)
(a) By manual means within an initial lead of 30 M and an initial lift of 1.50 M
(Considering 20% of total volume) | 405 | Cum | 146 | ₹59,130 |
| 3 | Earthwork in re-excavation / silt clearance in drainage channel in all kinds of soil including sludge, slush mixed with all sorts of industrial wastes and municipal garbages, polypacks, carcasses, small khatal effluents, night soil etc. by mathor labour as may be necessary and depositing the same in places as directed by the Engineer-in-charge , in such a manner, without causing much hindrance to traffic and posing health hazard and making arrangement to maintain the site in workable condition and rough dressing when dry including making arrangement of bailing out of any seepage water and removal of sand or soil blown from underneath, removal of khatal, temporary latrines, clearing and removing all kinds of semi compact masses formed by water hyacinth, jungles up to 30 cm girth, and burning them to ashes or removing outside Government land in conformity with the Municipal rules, including shoring shuttering as required, nicking out lines etc. (Measurement : Pre-work and Post-work level section. Pre- work section to be taken after removal of water hyacinth and all other floating materials etc.)
(b) By mechanical means using hydraulic excavators within an initial lead of 30 M and an initial lift of 3.0 M.
(Considering 80% of total volume) | 1,620 | Cum | 124 | ₹2,00,880 |
| 4 | Disposal / carriage of excavated earth / materials outside Government land by truck or by any other conveyance over kancha / pucca road including making access for plying the truck or any other conveyance beyond 300 m from the excavated point including cost of stacking, loading, unloading, transporting, arrangement of land, if required by
agency, spreading and levelling as necessary etc. complete. Measurement : By stacks at loading point after deducting voids as perrule. (This item can only be used after obtaining permission from theconcerned Superintending Engineer).
(Considering 70% of total volume) | 1,620 | Cum | 117 | ₹1,89,540 |
| 5 | Supplying silver sand as per approved specification and stacked at site | 2.91 | Cum | 571 | ₹1,662.75 |
| 6 | Supplying to site empty cement polythene bags (capacity 50kg) in good
condition including stacking, incedental charges etc. all complete
(capacity 50 kg). | 104 | Each | 6 | ₹624 |
| 7 | Labour charges for filling empty cement gunny bag / polythene bag (capacity 50 kg) with all kinds of earth (wet or dry), sand or agreegates(stone / brick) and sewing as done in case of cement bags ,(tying with a knot after filling will not be accepted ) , and stacking within a lead of 30 metre as per direction of Engr-in-charge (cost is excluding the cost of any types of filling materials). NB:- Volume of earth/ sand filled bags should not be less than 0.028 cum/ bag. | 104 | Each | 7 | ₹728 |
| 8 | Dumping in position earth / sand filled gunny / poly bags (capacity 50
kg) within a lead of 30 metre inclusive of all lifts. | 104 | Each | 3 | ₹312 |
| 9 | Removing earth/sand filled poly bags/gunny bags from the channel bed/slope and initially depositing the same near channel bank at a place as directed by the Engineer-in Charge for measurement of Bag. & then disposing off the same at a distance not less than 150
metre from the channel site. | 104 | Each | 6 | ₹624 |
| 10 | Dismantling all types of masonary excepting cement concrete, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m.
In ground floor including roof. | 18.75 | Cum | 447 | ₹8,381.25 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.95 MB
Tendernotice_2.pdf
PDF • 1.19 MB
Tendernotice_3.pdf
PDF • 1.40 MB
BOQ_2528786.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid