| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 CrAccepted-Finance | ₹2.1 Cr | L1 | Accepted-Finance Accepted |
| 2 | L2₹2.5 CrRejected-Finance SHRI RAM VILA UDAI SINGH JAIN RAOD ALIGARH | ALIGARH | ALIGARH | UTTAR PRADESH | ₹2.5 Cr | L2 | Rejected-Finance Rejected Because Quoted higher rate |
| 3 | L3₹2.5 CrRejected-Finance 234 Z 12 VAISHNO COLONY SURENDRA NAGAR ALIGARH | ALIGARH | ALIGARH | UTTAR PRADESH | ₹2.5 Cr | L3 | Rejected-Finance Rejected Because Quoted higher rate |
| 4 | Not Admitted-Fee/PreQual/Technical 35 60 2A LASKARPUR MUGHAL ROAD KAMLA NAGAR AGRA 282005 | AGRA | AGRA | UTTAR PRADESH | 282005 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹2.9 Cr
EMD Value
₹16.6 L
Closing Date
9 Apr 2026, 12:00 pmClosed
Superintending Engineer Aligarh Circle PWD Aligarh
Office of The SE, Aligarh Circle, P.W.D., Aligarh
Construction work of office building of Chief Engineer, Aligarh Zone, P.W.D., Aligarh in District-Aligarh
2026_CEALG_1132943_1
709/Cashier(C.D.-1 A.)-A.C./25-26 Date 06-02-2026
Open Tender
Civil Works - Buildings
365 days
Aligarh
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹16.6 L
Yes
Office of The SE, Aligarh Circle, P.W.D., Aligarh
12 May 2026
3 Apr 2026
9 Apr 2026
3 Apr 2026
9 Apr 2026
3 Apr 2026
7 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Clearing jungle including uprooting of rank vegatations grass, bush, wood trees and saplings of girth upto 30cm. Measured at a height of 1 metre above ground level & removal of rubbish upto a distance of 50 metres outside the periphery of area cleared. as per direction of Engineer-in-charge. As per DSR 2023 S.I.-2.31 (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) | |||||
| 2Earth work in exacavation in trenches for foundations and for pipes cables etc. in ordinary soil(loam clay or sand) including lift upto 1.5 m and dressing of sides and ramming of bottom sand disposal of surplus excavated earth as directed by the Engineer i/c with in a lead of 50m. as per direction of Engineer-in-charge. As per DSR 2023 S.I.-2.6.1 (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) | |||||
| 2.1 | (A) In all kind of soil upto 1.5m depth | - | Cum | - | - |
| 2.2 | (B) In all kind of soil upto 1.5m to 3.0m. Depth | - | Cum | - | - |
| 3Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.all kinds of soil. as per direction of Engineer-in-charge. As per DSR 2023 S.I.-2.8.1 (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) | |||||
| 4Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. as per direction of Engineer-in-charge. As per D.S.R. Ch 2.25A (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) | |||||
| 5Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete.as per direction of Engineer-in-charge. AS Per DSR Ch.-2 SI No.-2.27 (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) | |||||
| 61:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources).as per direction of Engineer-in-charge. AS Per DSR Ch.-4 SI No.-4.1.8 (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) | |||||
| 7Treatment of soil under existing floors using chemical emulsion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1 :2 (1 cement : 2 Coarse sand) to match the existing floor With Chlorpyriphos/Lindane E.C. 20% with 1% concentration. as per direction of Engineer-in-charge. AS Per DSR Ch-2, S.I. No.-2.35.3.1. (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) | |||||
| 8Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources.[R.C.C. WORK IN FOOTING ]. as per direction of Engineer-in-charge. AS Per DSR Ch-5, S.I. No.-5.1.2 (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) | |||||
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.83 MB
BOQ_2114788.xls
BOQ • 1.12 MB
Download all tender documents and submit your bid