Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹16.9 LAdmitted-Finance NA | -15.00% | ₹16.9 L | L1 | Admitted-Finance |
| 2 | L2₹17.8 LAdmitted-Finance | -10.50% | ₹17.8 L | L2 | Admitted-Finance |
| 3 | L3₹17.9 LAdmitted-Finance | -10.00% | ₹17.9 L | L3 | Admitted-Finance |
Tender Value
₹19.8 L
EMD Value
₹1.7 L
Closing Date
16 May 2026, 4:00 pmClosed
CHIEF ENGINEER
NAGAR NIGAM VARANASI
Ward sa 24 ramadattapur ke neeche aakaash janaral stor ke saamane sailoon dukaan se bhagavaan sinh tak ccrod va k c naalee nirmaan ka kaary.
2026_NNVAR_1136537_86
02_2026-27
Open Tender
Civil Works
90 days
VARANASI NAGAR NIGAM
AS PER TENDER DOCUMENT
3 documents required · 3 mandatory
₹1,984
TENDER COST AC NO. 50100642535388
₹1.7 L
1 Jul 2026
7 May 2026
16 May 2026
7 May 2026
16 May 2026
7 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1okMZ la0 24 vUrxZr vkdk'k tujy LVksj ds lkeus lSywu nqdku ls ijes'oj falg rd lh0lh0 jksM o ds0lh0 ukyh fuekZ.k dk dk;ZA | |||||
| 1.01 | E/W in filling from outside 8.00 km including all cost complete(Analysed) | 247.7 | M3 | 310.1 | ₹76,811.77 |
| 1.02 | Providing and laying Cement concrete 1:6:12( 1 cement : 6 fine sand : 12 graded brick ballast 40 mm. nominal size) including supply of all materials. labour and T&P etc. required for proper completion of the work and curing complete, also including cost of formwork in foundation and floors. SOR SI No. 273 | 1.48 | M3 | 4,060 | ₹6,008.8 |
| 1.03 | First class bricks work in 1:4 in cement and coarse sand of 1.25 F.M. mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work. SOR SI No. 305(b) | 6.11 | M3 | 5,500 | ₹33,605 |
| 1.04 | Providing and laying Cement concrete 1:4:8 ( 1 cement : 4 coarse sand : 8 graded stone ballast 40 mm. nominal size) including supply of all materials. Labour and T&P etc. required for proper completion of the work and curing complete also including cost of formwork in foundation and floors.S.I.No-281. | 62.5 | M3 | 5,550 | ₹3,46,875 |
| 1.05 | S/L of 125 micron polythene sheet under the foundation or sub base to act as seperation between sub base and concrete slab (for cc road slab) etc | 625 | M2 | 45 | ₹28,125 |
| 1.06 | Laying of CC Road slab consisting of 1:1.5:3 cement coarse sand and approved 20 mm gauge stone ballast over prepared sub grade after its rectification & bringing etc as per sor si no 773B | 93.7 | M3 | 7,350 | ₹6,88,695 |
| 1.07 | Supply, laying of precasted cc block K.C. drain of app. Design and mix over 3" thick 1:6:12 base (1 cement : 6 fine sand : 12 graded brick ballast 40 mm. nominal size) all cost complete. NNA | 370 | Rmtr | 1,340 | ₹4,95,800 |
| 1.08 | S/F of sign board with all complete | 1 | No. | 5,000 | ₹5,000 |
| 1.09 | Add GST @ 18% | 1 | Tax | 3,02,652.09 | ₹3,02,652.09 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.45 MB
BOQ_2143426.xls
BOQ • 0.29 MB
t1.pdf
Tender Documents • 7.14 MB
Download all tender documents and submit your bid