Loading…
Loading…
Tender Value
₹2.2 Cr
EMD Value
₹4.4 L
Closing Date
4 Aug 2026, 4:00 pm3d left
Executive Engineer
HPPWD Division Nadaun
C/o B uilding Portion including WS SI, Septic, Rain water Harvesting Tank, site Development etc.
2026_PWD_140241_1
NIT No. 5295-5312 dated 17-07-2026
Open Tender
Civil Works - Others
Percentage
270 days
Bsaral
Please refer Tender documents.
17 documents required · 17 mandatory
₹7,000
EE Nadaun
₹4.4 L
30 Jul 2026
30 Jul 2026
4 Aug 2026
30 Jul 2026
4 Aug 2026
30 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains for all kinds of soil and ordinary rocks including dressing of sides and ramming of bottoms upto all lifts including getting out the excavated soil and disposal and transportation of surplus excavated soil / unuseful material for disposing at dumping site( to be arranged by the contractor) within all leads and lifts including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | 1 | Per Cubic meter | 388.55 | ₹388.16 |
| 2 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete including entire carriage of materials with in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | - | Per Cubic meter | 1,565.6 | - |
| 3 | Centering and shuttering including strutting, propping etcetera and removal of form work Foundations, footings, bases for columns complete upto all floor level including entire carriage of materials with in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | - | Per Square meter | 286.9 | - |
| 4 | Centering and shuttering including strutting, propping etcetera and removal of form work Suspended floors, roofs, landings, balconies and access plat form complete upto all floor level including entire carriage of materials within all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | - | Per Square meter | 714.7 | - |
| 5 | Centering and shuttering including strutting, propping etcetera and removal of form work Lintels, beams, plinth beams, girders, bressumers and cantilevers complete upto all floor level including entire carriage of materials with in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | 1 | Per Square meter | 580.6 | ₹580.02 |
| 6 | Centering and shuttering including strutting, propping etcetera and removal of form work Stairs, (excluding landings) except spiral staircases complete upto all floor level including entire carriage of materials with in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | - | Per Square meter | 663.6 | - |
| 7 | Centering and shuttering including strutting, propping etcetera and removal of form work Columns, piers, abutments, pillars, posts and struts complete upto all floor level including entire carriage of materials within all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | - | Per Square meter | 733.9 | - |
| 8 | Providing and laying in position cement concrete of specified grade 1:4:8 (one cement : four coarse sand : eight graded stone aggregate) 40mm ( forty millimetre) nominal size graded stone aggregate upto plinth level excluding the cost of centering and shuttering including entire carriage of materials within all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | 1 | Per Cubic meter | 5,000 | ₹4,995 |
| 9 | Providing and laying damp-proof course 40mm (Forty millimetre) thick with cement concrete 1:2:4 (One cement : Two coarse sand) : Four graded stone aggregate 20mm (twenty millimetre) nominal size complete including entire carriage of materials with in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | - | Per Square meter | 320 | - |
| 10 | Providing and applying a coat of residual petroleum bitumen of grade of VG-10(ten) of approved quality using 1.7 kg ( one point seven kilogram ) per square metre on damp proof course after cleaning the surface with brushes and finally with a piece of cloth lightly soaked in kerosene oil including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government | - | Per Square meter | 242.1 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.71 MB
Tendernotice_2.pdf
PDF • 0.37 MB
BOQ_207983.xls
BOQ • 0.52 MB
SBD.pdf
Tender Documents • 5.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].