Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 4 13A PERIYAR NAGAR THANGAMAPURIPATTANAM METTUR DAM 636 402 SALEM DT TAMIL NADU | METTUR DAM | SALEM | TAMIL NADU | 636402 | Admitted-Finance |
| 2 | Admitted-Finance 2 222 B 10 PONMAGAR METTUR DAM 636 401 | METTUR DAM | SALEM | TAMIL NADU | 636401 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹26,900
Closing Date
6 Aug 2020, 2:00 pmClosed
SE/MI/MTPS-II/Metturdam
SE/MI/MTPS-II/Metturdam
Attending to Routine maintenance / Minor breakdown works in Air Conditioning and Ventilation System of MTPS-II for a period of Six months from the date of commencement of work
2020_EB_172755_1
OT16
Open Tender
Miscellaneous Works
Works
180 days
SE/MI/MTPS-II/Metturdam
refer tender document
4 documents required · 4 mandatory
₹0
₹26,900
Yes
14 Aug 2020
23 Jul 2020
7 Aug 2020
23 Jul 2020
6 Aug 2020
23 Jul 2020
Amount
Charges for inspection & attending routine maintenance / General cleaning / minor breakdown works in Chiller unit / AHU / AWU (Unitary & Masonary Air washer unit) / Split Unit / Package Unit / and its connected equipments at all locations, and the cost of consumables & Personal protective equipments such as cotton waste,hand gloves, face mask, ear plug, T&P, lead, lift etc.,
Charges for changing the 1.5TR / 2.0 TR compressor of the split unit Dismantling, fixing and commissioning & the cost of consumables like N2 gas, cutting gas, brazing rod,T&P, lead, lift etc., (R22 Gas, Compressor will be supplied by TANGEDCO)
Charges for Refilling the R22 refregirant for 1.5 TR/2 TR Split units including the cost of transporting, refilling, testing, commissioning & cost of consumables like N2 gas,cutting gas,brazing rod, cotton waste, hand gloves, T&P, lead and lift etc.,(R22 Gas will be supplied by TANGEDCO)
Charges for Refilling the R22 refregirant for Package units / R407C refrigirant for Chiller units including the cost of transporting, refilling, testing, commissioning & cost of consumables like N2 gas,cutting gas, brazing rod, cotton waste, hand gloves, T&P,lead and lift etc.,( R22 / R407C gas will be supplied by TANGEDCO)
Charges for Dismantling the erected 1.5 TR / 2 TR Split unit and to refix the same in required area at MTPS II site and the cost of consumables, such as cotton waste, hand gloves, T&P,lead,lift etc.,
Charges for Renewal of damaged duct sheet of different sizes including the cost of sheets, transporting, Dismantling, Refixing, fixing and removing of scaffolding arrangements (Scaffolding Materials are under contractor scope) & the cost of consumables, such as cotton waste, hand gloves, T&P,lead, lift etc.
Charges for changing the 11TR compressor of the Package unit Dismantling, fixing and commissioning & the cost of consumables like N2 gas,cutting gas, brazing rod,T&P, lead, lift etc., (Compressor and R22 Gas will be supplied by TANGEDCO)
PREETHI ENTERPRISES
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .