Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.5 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹21.7 L+₹18,778 (0.87%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹22.8 L+₹1.3 L (6.04%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹23.0 L+₹1.5 L (7.01%)Admitted-Finance | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | HARMUKH INFRASTRUCTURE PRIVATE LIMITED L3 | M/s Dar Power L1 | M/S WATT ELECTRICAL CONTRACTS L4 | peerzada sameer ahsan shah L2 |
|---|---|---|---|---|---|---|---|
| 1.00SITC of below mentioned items | |||||||
| 1.01 | 11/0.433kV,630kVA, 3-phase Distribution Transformers with Bimetallic Terminal Connectors Energy Level-2, (Copper wound ), and with LV Cable Box having detachable Aluminium Gland plate.Transformer should have arrangement for vertical take off of cable with OCTC (Off Ckt Tap Changer) | 1 | No | 13,85,999 ₹13,85,999 | 16,30,000 ₹16,30,000 | 15,33,121 ₹15,33,121 | 11,50,000 ₹11,50,000 Lowest |
| 1.02 | 11 kV Gapless Surge Arrestor,9 kV ,10 kA ,LA with polymer housing, Stn. Type | 1 | Set | 2,999 ₹2,999 | 5,000 ₹5,000 | 12,121 ₹12,121 | 1,900 ₹1,900 Lowest |
| 1.03 | 11kV GO, AB Switch 3-Phase, 3-Pole, 200 Amp, Vertical Type | 1 | Set | 10,999 ₹10,999 | 10,000 ₹10,000 Lowest | 12,121 ₹12,121 | 10,000 ₹10,000 Lowest |
| 1.04 | 11 kV Horn Gap Fuse Set 3 Phase 200A | 1 | Set | 2,999 ₹2,999 | 5,000 ₹5,000 | 5,555 ₹5,555 | 2,300 ₹2,300 Lowest |
| 1.05 | 630mm² Single Phase Cable,1.1K V Grade, XLPE Insulated Stranded Conductor FRLS type | 132 | Mtr | 1,090 ₹1,43,880 | 200 ₹26,400 Lowest | 777 ₹1,02,564 | 1,230 ₹1,62,360 |
| 1.06 | 9 Mtr. Long Pole ( ST-410 SP33) | 4 | No | 20,000 ₹80,000 | 20,000 ₹80,000 | 15,786 ₹63,144 Lowest | 20,400 ₹81,600 |
| 1.07 | G.I Pipe of 150 mm dia 2 mtr long for Pole Butts (6") | 2 | Mtr | 2,999 ₹5,998 | 300 ₹600 Lowest | 5,121 ₹10,242 | 3,200 ₹6,400 |
| 1.08 | 11kV Polymeric composite Disc Insulator 12kV,min failing load 45kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm with fitting | 9 | No | 390 ₹3,510 | 150 ₹1,350 | 1,212 ₹10,908 | 125 ₹1,125 Lowest |
| 1.09 | GI Channel/Angle/Flat of sizes including clamps for L.A Set/G.O Set/Horn Gap | 150 | Kg | 130 ₹19,500 | 100 ₹15,000 Lowest | 175 ₹26,250 | 125 ₹18,750 |
Tender Value
₹24.9 L
EMD Value
₹49,860
Closing Date
15 Nov 2025, 9:00 amClosed
Executive Engineer ED Bandipora
Office of the Executive Engineer ED BANDIPORA, Block C, Mini Secretariat Complex BANDIPORA
Supply and Laying of 11kV Feeder Line with Accessories with Supply and Installation of Distribution Transformer at NHPC Colony, Dawar, Gurez
2025_PDD_294258_1
EDbpr28of2025-26
Open Tender
Electrical Works
Turn-key
30 days
Bandipora
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,000
Executive Engineer ED Bandipora
₹49,860
17 Nov 2025
5 Nov 2025
15 Nov 2025
5 Nov 2025
15 Nov 2025
5 Nov 2025
5 Nov 2025 - 7 Nov 2025
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.35 MB
BOQ_951893.xls
BOQ • 0.28 MB
TSHTLT.pdf
Other Document • 6.82 MB
TECHNICALSPECIFICATIONSelectric.pdf
Other Document • 2.68 MB
sbd28.pdf
Tender Documents • 0.89 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .