| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.6 LAccepted-AOC | L1 | Accepted-AOC accepted | |
| 2 | L2₹17.6 L+₹3,094.85 (0.18%)Rejected-Finance | L2 | Rejected-Finance rejected |
| Sl No | Description | Qty | Unit | PLR ENGINEERING AND CONSTRUCTIONS L1 | Ramasethu Infrastructure Pvt.Ltd L2 |
|---|---|---|---|---|---|
| 1.00 | Dismantling the existing Plain Cement Concrete for CC Road including cost and conveyance of all materials and labour charges etc complete | 89.5 | Cum | 561 ₹50,209.5 Lowest | 561 ₹50,209.5 Lowest |
| 2.00Earth work excavation for foundation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth Away from Site and un objectional area with Minimum lead of 5.00 KM within the places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification. | |||||
| 3.00 | 0 mtr to 1.50 mtr Depth | 446 | Cum | 337 ₹1,50,302 Lowest | 340 ₹1,51,640 |
| 4.00 | Supplying and filling in foundation and basement with filling sand in layers of not more than 15cm.thick well rammed watered and compacted etc., complete complying with standard specification. | 29.7 | Cum | 1,724 ₹51,202.8 Lowest | 1,730 ₹51,381 |
| 5.00providing House Service Connection : Supplying, laying and testing UPVC Pd with pes including Earthwork excavation for Trenches in Hard Stiff Clay , stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulder depositing the earth on banks with initial lead of 10m, lowering, aligning and reffiling the pipes in trenches with excavated earth in layers not more than 23cm thick watering, ramming to consolidation and disposal of surplus of earth etc complete.. | |||||
| 6.00 | 150 mm dia PVC Pipeline | 660 | mtr | 1,061.45 ₹7,00,557 Lowest | 1,061.45 ₹7,00,557 Lowest |
| 7.00 | Lowering PVC/ DWSC rigid pipes and specials to trench and laying to proper grade and alignment, jointing with PVC couplers with cement paste including Cost and Conveyance of all materials and all Labour Charges | 660 | mtr | 36 ₹23,760 Lowest | 36 ₹23,760 Lowest |
| 8.00 | Provision for De/watering arrangements Wherever necessary | 108 | Hrs | 291 ₹31,428 Lowest | 291 ₹31,428 Lowest |
| 9.00 | Barricading work (Where, there is less traffic areas and broader roads etc.) for laying of pipe line using casurina poles at 1.50m center to center (8cm to 10cm dia and 1.80m height) vertical with horizontal poles in three rows including painting the vertical poles in the road facing sides with ready mix paint, tying the vertical andhorizontal poles with coir rope including fixing charges and fixing 75mm diareflectors including earth work excavation for fixing vertical posts and finallyremoving and stacking the materials safely for further use etc., complete and as
directed by TWAD Board officers. | 660 | RM | 61 ₹40,260 Lowest | 61 ₹40,260 Lowest |
| 10.00 | Refilling the trenches with excavated soil complying with standard specification in layers of 23 CM including watering consolidation for filling complete and as directed by engineering incharge | 442.2 | M3 | 47 ₹20,783.4 Lowest | 47 ₹20,783.4 Lowest |
Tender Value
₹21 L
EMD Value
₹21,000
Closing Date
23 Jul 2025, 3:00 pmClosed
The commissioner
Tambaram city municipal corporation
Providing Sewerage line Facilities and house connection and restoration to GST road Ward no.33 in Zone 4 Tambaram City Municipal Corporation
2025_DMA_584151_2
340/2025/e1
Open Tender
Civil Works
Works
90 days
Tambaram
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹21,000
8 Aug 2025
21 Jul 2025
23 Jul 2025
21 Jul 2025
23 Jul 2025
21 Jul 2025
Amount
Dismantling the existing Plain Cement Concrete for CC Road including cost and conveyance of all materials and labour charges etc complete
Earth work excavation for foundation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth Away from Site and un objectional area with Minimum lead of 5.00 KM within the places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification.
0 mtr to 1.50 mtr Depth
Supplying and filling in foundation and basement with filling sand in layers of not more than 15cm.thick well rammed watered and compacted etc., complete complying with standard specification.
providing House Service Connection : Supplying, laying and testing UPVC Pd with pes including Earthwork excavation for Trenches in Hard Stiff Clay , stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulder depositing the earth on banks with initial lead of 10m, lowering, aligning and reffiling the pipes in trenches with excavated earth in layers not more than 23cm thick watering, ramming to consolidation and disposal of surplus of earth etc complete..
150 mm dia PVC Pipeline
Lowering PVC/ DWSC rigid pipes and specials to trench and laying to proper grade and alignment, jointing with PVC couplers with cement paste including Cost and Conveyance of all materials and all Labour Charges
Provision for De/watering arrangements Wherever necessary
Barricading work (Where, there is less traffic areas and broader roads etc.) for laying of pipe line using casurina poles at 1.50m center to center (8cm to 10cm dia and 1.80m height) vertical with horizontal poles in three rows including painting the vertical poles in the road facing sides with ready mix paint, tying the vertical andhorizontal poles with coir rope including fixing charges and fixing 75mm diareflectors including earth work excavation for fixing vertical posts and finallyremoving and stacking the materials safely for further use etc., complete and as directed by TWAD Board officers.
Refilling the trenches with excavated soil complying with standard specification in layers of 23 CM including watering consolidation for filling complete and as directed by engineering incharge
Disposal of surplus Earth including loading unloading conveyance with in a lead of 5 km and consideration etc as directed by engineering incharge
Road Restoration with Cement concrete 1:4:8, 10cm thick using 40 mm HBS metal and Cement Concrete 1:2:4, 10cm thick using 20 mm HBS metal including cost of all material laying, curing, including earth work Excavation for a Depth of 40 cm and Sand filling
Earthwork Excavation
M Sand Filling
plain CC 1:4:8 mix using 40 mm Metal
plain CC 1:2:4 mix using 20 mm Metal
Ramasethu Infrastructure Pvt.Ltd (BID ID -1409918)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .