| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.3 LAccepted-AOC | L1 | Accepted-AOC Lowest tenderer | |
| 2 | L2₹22.7 L+₹1.4 L (6.67%)Rejected-Finance | L2 | Rejected-Finance Other than Lowest Tenderer | |
| 3 | L3₹25.2 L+₹3.9 L (18.4%)Rejected-Finance | L3 | Rejected-Finance Other than Lowest Tenderer | |
| 4 | L4₹29.0 L+₹7.7 L (36.0%)Rejected-Finance | L4 | Rejected-Finance Other than Lowest Tenderer | |
| 5 | L4₹29.0 L+₹7.7 L (36.0%)Rejected-Finance | L4 | Rejected-Finance Other than Lowest Tenderer |
Tender Value
Refer Docs
EMD Value
₹96,760
Closing Date
25 Aug 2021, 6:00 pmClosed
GE NAGROTA
GE NAGROTA PIN 901208 C/O 56 APO
MANNING AND OPERATION AT PUMP HOUSE AT SECTOR A,B,C,D AND E UNDER GE NAGROTA
2021_MES_462682_1
GEN-35/2021-22
Open Tender
Miscellaneous Works
Item Rate
334 days
NAGROTA
Class D and above and category d (v)
8 documents required · 8 mandatory
₹500
GE NAGROTA
₹96,760
Yes
29 Sept 2021
26 Jul 2021
27 Aug 2021
26 Jul 2021
25 Aug 2021
10 Aug 2021
Amount
Manning and Operation for 01 FGM per shift of water supply installation at Dug Well No. 08 for operating entire water supply installations under DUG Well No. 08 including pump sets with starters, bleaching dozer, LT panels & sluice valve etc, each shift of 8 hours including sundays and holidays by employing the manpower as mentiond for entire system comprising of the following and cleaning of entire installtion and surrounding area as directed by Engr-In-charge. Note:- Shift timings are as under:- (i) Ist shift 0600 hrs to 1400 Hrs (ii) IInd shift 1400 hrs to 2200 Hrs (iii) IIIrd shift 2200 to 0600 Hrs
Manning and Operation for 01 FGM per shift of water supply installation at Dug Well No. 03 for operating entire water supply installations under DUG Well No. 03 including pump sets with starters, bleaching dozer, LT panels & sluice valve etc, each shift of 8 hours including sundays and holidays by employing the manpower as mentiond for entire system comprising of the following and cleaning of entire installtion and surrounding area as directed by Engr-In-charge. Note:- Shift timings are as under:- (i) Ist shift 0600 hrs to 1400 Hrs (ii) IInd shift 1400 hrs to 2200 Hrs
Manning and Operation for 01 FGM per shift of water supply installation at Dug Well No. 05 for operating entire water supply installations under DUG Well No. 05 including pump sets with starters, bleaching dozer, LT panels & sluice valve etc, each shift of 8 hours including sundays and holidays by employing the manpower as mentiond for entire system comprising of the following and cleaning of entire installtion and surrounding area as directed by Engr-In-charge. Note:- Shift timings are as under:- (i) Ist shift 0600 hrs to 1400 Hrs (ii) IInd shift 1400 hrs to 2200 Hrs
Manning and Operation for 01 FGM per shift of water supply installation at Long Term pump house for operating entire system including alum dozing system, cleaning of algae/vegetation grown from the upper surface of sedimentation tank and clarifloculators , back washing of filter beds regularly each shift of 8 hours including sundays and holidays by employing the manpower as mentiond for entire system comprising of the following and cleaning of entire installtion and surrounding area as directed by Engr-In-charge. Note:- Shift timings are as under:- (i) Ist shift 0600 hrs to 1400 Hrs (ii) IInd shift 1400 hrs to 2200 Hrs (iii) IIIrd shift 2200 to 0600 Hrs
Manning and Operation for 01 FGM per shift of water supply installation at Kore A Jagir Pump house for operating entire water supply installations under Kore A Jagir Pump house including pump sets with starters, bleaching dozer, LT panels & sluice valve etc, each shift of 8 hours including sundays and holidays by employing the manpower as mentiond for entire system comprising of the following and cleaning of entire installtion and surrounding area as directed by Engr-In-charge. Note:- Shift timings are as under:- (i) Ist shift 0600 hrs to 1400 Hrs (ii) IInd shift 1400 hrs to 2200 Hrs
Manning and Operation for 01 FGM per shift of water supply installation at Compo Pump house for operating entire water supply installations under Compo Pump house including pump sets with starters, bleaching dozer, LT panels & sluice valve etc, each shift of 8 hours including sundays and holidays by employing the manpower as mentiond for entire system comprising of the following and cleaning of entire installtion and surrounding area as directed by Engr-In-charge. Note:- Shift timings are as under:- (i) Ist shift 0600 hrs to 1400 Hrs (ii) IInd shift 1400 hrs to 2200 Hrs
Manning and Operation for 01 FGM per shift of water supply installation at Jagti Pump house for operating entire water supply installations under Jagti Pump house including pump sets with starters, bleaching dozer, LT panels & sluice valve etc, each shift of 8 hours including sundays and holidays by employing the manpower as mentiond for entire system comprising of the following and cleaning of entire installtion and surrounding area as directed by Engr-In-charge. Note:- Shift timings are as under:- (i) Ist shift 0600 hrs to 1400 Hrs (ii) IInd shift 1400 hrs to 2200 Hrs
Manning and Operation for 01 FGM per shift of water supply installation at MES/Chirva Pump house for operating entire water supply installations under MES/Chirva Pump house including pump sets with starters, bleaching dozer, LT panels & sluice valve etc, each shift of 8 hours including sundays and holidays by employing the manpower as mentiond for entire system comprising of the following and cleaning of entire installtion and surrounding area as directed by Engr-In-charge. Note:- Shift timings are as under:- (i) Ist shift 1000 hrs to 1800 Hrs
Note for item No. 01 to 08:- 1. Quoted rate is deemed to be included the cost of all T&P required at site. 2. Safety of the tradesmen wil be the responsibility of the contractor and cost for the same is deemed to be included in the quoted rates. 3. The tradesmen shall keep the respective installation neat and clean from dust and vegetation within the campus of installation, tools for the same will be provided by the contractor and cost of the same is deemed to be included in the quoted rate. 4. The trademen will maintain the log sheets of pump sets and filteration plant on proper format and submit the same to Engr-in-Charge on weekly basis, stationary required for the same will be provided by the contractor with no extra cost. 5. The trademen will operate all pumps and DG set/any plants within the area under 1 km range without any extra cost of any effect as per instruction and directed by Engr-in-Charge
BMMJ TRADERS AND ENGINEERS
Garg Engineers
J S ENGINEERS
Skyline Encon
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .