| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.0 LAdmitted-Finance | ₹8.0 L | L1 | Admitted-Finance |
| 2 | L2₹8.0 LAdmitted-Finance | ₹8.0 L | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Solairaj Perumal L1 | Nagarajan Senthil L2 |
|---|---|---|---|---|---|
| 1.00Construction of Compound wall at N. Pudur Jumma Pallivasal Islamiyar Adaikasthalam (Kaparasthan) in Lembalakkudi Panchayat | |||||
| 2.00 | Earth work excavation and for foundation in all soils and sub soils to full depth as may be directed wherever necessary and refilling the sides of foundation with excavated earth in layers of not more than 15 cm thick well rammed and consolidated and depositing on bank etc., complete | 49.5 | Cum | 263.5 ₹13,043.25 | 265 ₹13,117.50 |
| 3.00 | Supplying and filling in foundation and basement with filling M.Sand in layers not more than 15cm thick well rammed, watered and compacted complete complying with standard specification. | 6.6 | Cum | 1,787.3 ₹11,796.18 | 1,790 ₹11,814 |
| 4.00 | Cement Concrete 1:4:8 mix using 40mm gauge hand broken granite stone jelly for foundation including watering where ever necessary and laid in layers not more than 15cm thick compacting etc., complete | 9.9 | Cum | 5,315.5 ₹52,623.45 | 5,325 ₹52,717.50 |
| 5.00 | RANDOM RUBBLE MASONTRY CEMENT MORTOR 1:5 MIX USING rough stonme and bond stone including cost and conveyance of all materials and all labour charges etc complete | 29.96 | Cum | 5,664 ₹1.7 L | 5,675 ₹1.7 L |
| 6.00 | R.C.C. 1:1.5:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges etc., complete. | 2.73 | Cum | 8,946.3 ₹24,423.40 | 8,955 ₹24,447.15 |
| 7.00 | Supplying fabricating and placing in RTS Steel or ribbed for steel for all reinforced cement concrete works as per the design given including cost of steel and binding wire in all floors etc., complete complying with standard specification. | 0.39 | MT | 91,932 ₹35,853.48 | 92,500 ₹36,075 |
| 8.00 | Brick work in Cement Mortar 1:5 (one cement and five Sand) using country bricks including cost of cement which will be supplied by the department if available and the cost will be recovered as per the rate in the condition including curing etc., complete | 33.55 | Cum | 6,096 ₹2.0 L | 6,150 ₹2.1 L |
| 9.00 | Plastering with cement mortor 1:5 mix to 12mm thick including cost and conveyance of all materials to work site and all labour charges etc., complete | 301.33 | Sqm | 283.3 ₹85,366.79 | 285 ₹85,879.05 |
| 10.00 | Emulsion Painting including cost of lime blue powder, fevicol type gums, brushes, scaffolding charges etc., complete with standard specification. | 301.33 | Sqm | 262 ₹78,948.46 | 265 ₹79,852.45 |
Tender Value
₹8.1 L
EMD Value
₹8,080
Closing Date
27 Jan 2026, 3:00 pmClosed
Bdo,Thirumayam
Pt.union Office,Thirumayam
Construction of Compound wall at N. Pudur Jumma Pallivasal Islamiyar Adaikasthalam (Kaparasthan) in Lembalakkudi Panchayat
2026_RDTN_646189_1
Tym/MinorittyWelfare/Work-1
Open Tender
Civil Works
Thirumayam
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹8,080
29 Jan 2026
23 Jan 2026
27 Jan 2026
23 Jan 2026
27 Jan 2026
23 Jan 2026
Construction of Compound wall at N. Pudur Jumma Pallivasal Islamiyar Adaikasthalam (Kaparasthan) in Lembalakkudi Panchayat
Earth work excavation and for foundation in all soils and sub soils to full depth as may be directed wherever necessary and refilling the sides of foundation with excavated earth in layers of not more than 15 cm thick well rammed and consolidated and depositing on bank etc., complete
Supplying and filling in foundation and basement with filling M.Sand in layers not more than 15cm thick well rammed, watered and compacted complete complying with standard specification.
Cement Concrete 1:4:8 mix using 40mm gauge hand broken granite stone jelly for foundation including watering where ever necessary and laid in layers not more than 15cm thick compacting etc., complete
RANDOM RUBBLE MASONTRY CEMENT MORTOR 1:5 MIX USING rough stonme and bond stone including cost and conveyance of all materials and all labour charges etc complete
R.C.C. 1:1.5:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Supplying fabricating and placing in RTS Steel or ribbed for steel for all reinforced cement concrete works as per the design given including cost of steel and binding wire in all floors etc., complete complying with standard specification.
Brick work in Cement Mortar 1:5 (one cement and five Sand) using country bricks including cost of cement which will be supplied by the department if available and the cost will be recovered as per the rate in the condition including curing etc., complete
Plastering with cement mortor 1:5 mix to 12mm thick including cost and conveyance of all materials to work site and all labour charges etc., complete
Emulsion Painting including cost of lime blue powder, fevicol type gums, brushes, scaffolding charges etc., complete with standard specification.
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 1 & 10 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.11 MB
Tym_doc-1.pdf
Tender Documents • 0.20 MB
BOQ_774584.xls
BOQ • 0.45 MB
Download all tender documents and submit your bid