Loading…
Loading…
Tender Value
₹3.0 L
EMD Value
₹6,000
Closing Date
24 Jun 2026, 1:00 pm6d left
Executive Engineer_Park_and_Square
5, S N Banerjee Road, Kolkata-700013
REPAIR AND RENOVATION OF ISLAND ADJACENT TO ULTADANGA FOOTOVER BRIDGE IN WARD NO. 32, BR.-III.
2026_KMC_1028165_1
KMC/EE_PS/III/32/1/26-27
Open Tender
CIVIL WORKS
30 days
Kolkata
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹6,000
16 Jun 2026
16 Jun 2026
27 Jun 2026
17 Jun 2026
24 Jun 2026
17 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | SUPPLYING FIBRE GLASS RELIEF WORK OF ARTISTIC NATURE (TWO DIEMENSIONAL MURAL WORK OR THREE DIEMENSIONAL MODEL) INCLUDNG ALL MATERIALS LIKE FIBRE GLASS, IRON OR METAL FRAME INSIDE FIBRE GLASS FOR RIGIDITY,APPLYING N.C. COAT PAINT,ETC. COMPLETE AND FIXING THE SAME TO WALL OR ON GROUND/OTHER BASE INCLUDING GROUTING WITH CEMENT CONCRETE WORK COMPLETE IN ALL RESPECTS AS PER DIRECTION OF E.I.C.(THE RATE IS EXCLUDING GST & 1% LABOUR WELFARE CESS) | 4.95 | SQM | 10,399.84 | ₹51,481.55 | 1 |
| 2 | BUILDING WORKS (D) Flooring B. REPAIR AND REHABILITATION 9. Taking out Mirzapur or glazed porcelain tiles carefully by chiselling from walls or floor including stacking serviceable material as directed. | 80.4 | SQM | 106 | ₹8,522.4 | 2 |
| 3 | ORDINARY CEMENT CONCRETE ( MIX 1:1.5:3 ) WITH GRADED STONE CHIPS ( 20 MM NOMINAL SIZE) EXCLUDING SHUTTERING AND REINFORCEMENT, IF ANY, IN GROUND FLOOR AS PER RELEVANT IS CODES | 0.06 | M3 | 6,047 | ₹362.82 | 3 |
| 4 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc.40..Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.(a) For works in foundation and upto roof of ground floor/upto 4 m.(i) Tor steel/Mild Steel.I. SAIL/ TATA/RINL. | 0.01 | MT | 58,249 | ₹365.78 | 4 |
| 5 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc?36...Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor).(When the height of a particular floor is more than 4 m the equivalent floor height shall be taken as 4 m and extra for works beyond the initial 4 m ht. shall be allowed under 12 (e) for every 4 m or part thereof).(a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge.Notes:- For shuttering in shell roof, grid roof with vertical faces folded plate, arched roof the rate in 36 (a), 36 (b) & 37 (c ) of subhead B above to be increased by 100 % . For grid roof with splayed faces, rate is to be increased by 150%. | 0.48 | SQM | 335 | ₹160.8 | 5 |
| 6 | SECTION 1. ------------BUILDING WORKS (I) PLASTERING, POINTING ETC. A. ORIGINAL WORKS 1.Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] i) With 1:6 cement mortar (b) 20 mm thick plaster | 80.4 | SQM | 167 | ₹13,426.8 | 6 |
| 7 | BUILDING WORKS (D) Flooring A. ORIGINAL WORKS 35. Supplying, fitting & fixing 1st quality Ceramic tiles in walls and floors to match with the existing work & 4 nos. of key stones (10mm) fixed with araldite at the back of each tile & finishing the joints with white cement mixed with colouring oxide if required to match the colour of tiles including roughening of concrete surface, if necessary or by synthetic adhesive & grout materials etc. (A) Floor With Sand Cement Mortar (1:4) 20 mm thick & 2 mm thick cement slurry at back side of tiles using cement @ 2.91 Kg/Sq.m & joint filling using white cement slurry @0.20kg/Sq.m. (a) Area of each tile upto 0.09 Sq.m (i) Coloured decorative Note: 2. Add extra for each addl, floor over the rate for item 35 & 36 of subhead A.(i) upto 4 th floor-Rs 5/ Sq.m (i) above 4 th floor-Rs 6.25/ Sq.m | 80.4 | SQM | 746 | ₹59,978.4 | 7 |
| 8 | BUILDING WORKS(D) Flooring..A. ORIGINAL WORKS?(22)Supplying, fitting and fixing Marble Slab/tile of 15 to 18 mm thickness in floor, lobby, stair, landing & treads etc. over 20 mm (av.) thck base of Cement mortar (1:2) laid with white cement slurry @ 4.4 kg/Sq.m before placing marble & jointed with white cement slurry @ 2.0 kg/Sq.m with necessary pigments including grinding and Granite polishing as per direction of Engineering -in -Charge in Ground Floor. {White cement and Pigment to be supplied by the Agency].(a) With Makrana plain pink / Adranga Pink / Garbh Gulabi / Udaypur pink / Udaypur Green / Black Bhaslana.(i) Area of each Slab/tile upto 0.3 sq.m.(Add extra for each addl, floor over the rate for item 22, 25, 26, 17, 20, 31, 32 & 15 of subhead A. (I) upto 4 th floor- Rs. 12/-per Sq.m II) above 4th floor -Rs. 16/- per Sq.m | 11.25 | SQM | 1,459 | ₹16,413.75 | 8 |
| 9 | BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT 5. Earth work in filling in compound, tank, low land, ditches etc. with good earth, in layers not exceeding 150 mm. including breaking clods and consolidating the same by ramming and dressing complete. (Payment will be made on profile measurement before and after the work) (b) (iii) With carried earth arranged by the contractor within a radius exceeding 5 km. but not exceeding 10 km. including cost of carried earth. | 0.24 | %M3 | 51,236 | ₹12,424.73 | 9 |
| 10 | BUILDING WORKS (F) STRUCTURAL STEEL WORKS, GRILLS, GATES ETC. A. ORIGINAL WORKS 13. (a) M.S.or W.I. Ornamental grill of approved design joints continuously welded with M.S, W.I. Flats and bars of windows,railing etc. fitted and fixed with necessary screws and lugs in ground floor. (Add extra @ 1% for each addl. floor upto 4th floor and @ 1.25% for each addl. floor above 4th floor) ((ii) Grill weighing above 16 Kg./sq.mtr and above. (MODE OF MEASUREMENT):-The weight of grill per sq.m. will be determined by taking the physical weight of fabricated grill and dividing the same by covered area of the same. N.B. No shop priming will be allowed to facilitate inspection of workmanship. Weight of grill is to be taken after final grinding and finishing the weld. (3rd Corrigenda & addenda dated 04.06.2018) | 1.3 | QTL | 9,696 | ₹12,566.02 | 10 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.81 MB
Ten_and_dec.pdf
Additional Documents • 0.70 MB
Ten_Doc.pdf
Tender Documents • 0.97 MB
SPE_CON.pdf
Additional Documents • 0.54 MB
BOQ_2525497.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid