Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.6 LAdmitted-Finance | -41.11% | ₹5.6 L | L1 | Admitted-Finance |
| 2 | L2₹5.6 LAdmitted-Finance | -41.00% | ₹5.6 L | L2 | Admitted-Finance |
| 3 | L3₹6.0 LAdmitted-Finance | -37.00% | ₹6.0 L | L3 | Admitted-Finance |
| 4 | L4₹6.2 LAdmitted-Finance | -35.00% | ₹6.2 L | L4 | Admitted-Finance |
| 5 | L5₹6.3 LAdmitted-Finance | -33.95% | ₹6.3 L | L5 | Admitted-Finance |
Tender Value
₹9.5 L
EMD Value
₹19,000
Closing Date
9 Feb 2026, 4:00 pmClosed
Executive Engineer PWD (RnB) Division Doda
Executive Engineer PWD (RnB) Division Doda
As per NIT/SBD
2026_PWDJK_302000_16
e-NIT 87 of 2025-26
Open Tender
Civil Works
45 days
Doda
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
Yes
Treasury Challan under MH 0059
₹19,000
Yes
6 Mar 2026
2 Feb 2026
10 Feb 2026
2 Feb 2026
9 Feb 2026
2 Feb 2026
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil :
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) with 20% Stone.
Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in : Cement mortar 1:6 ( 1 cement : 6 coarse sand)
Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level
15mm Cement plaster on the rough side of single or half brick wall of mix:1 : 6 ( 1 cement : 6 fine sand)
Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete.
Providing and laying damp-proof Course 50 mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and curing complete
Finishing walls with water proofing cement paint of required shade on New work (two or more coats applied @ 3.84 kg/10sqm)
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works.
CARRIAGE OF MATERIALS By Mechanical Transport/By Manual Labour including loading, unloading and stacking
Carriage of Stone avg. lead of 500.00 Mtr. by HL
Carriage of Sand avg. lead of 50 km by MT & 200.00 Mtr. By HL.
Carriage of stone aggregate below 40 mm nominal size avg. lead of 50 km by MT & 200.00 Mtr.HL.
Carriage of Bricks avg. lead of 200 km by MT & 200.00 Mtr. by HL.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.78 MB
BOQ_979878.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid