| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹1.5 LAccepted-AOC | L-1 | Accepted-AOC Accept | |
| 2 | L-2₹1.7 L+₹17,650 (11.9%)Rejected-AOC 20 SHANTI KUNJ WEST ARJUN NAGAR AGRA UTTAR PRADESH 282001 | AGRA | UTTAR PRADESH | 282001 | L-2 | Rejected-AOC Reject | |
| 3 | L-3₹1.8 L+₹31,568 (21.3%)Rejected-AOC | L-3 | Rejected-AOC Reject |
Tender Value
₹2 L
EMD Value
₹2,000
Closing Date
17 Jul 2021, 3:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE EDC-1 AGRA
B-690 Kamla Nagar Agra
for the work of replacement of damaged 5/8/10 MVA Power T/F along with other associated works at various Substation under EDD-2 Agra.
2021_DVVNL_602906_1
11/EDCA/2021-22
Open Tender
Electrical Works
Piece-work
365 days
B-690 Kamla Nagar Agra
As per Tender Documents
2 documents required · 2 mandatory
₹1,000
DVVNL
₹2,000
17 Jan 2022
12 Jul 2021
17 Jul 2021
12 Jul 2021
17 Jul 2021
12 Jul 2021
180 days
Shifting & dragging of Existing 5/8/10 MVA Power transformer placed inside the switchyard at 33/11 KV S/S coming in the way during replacment of damaged 5/8/10 MVA T/F & Its installation at plinth at same place after completeing the work of removal of damaged 5/8/10 MVA T/F including all T&P, crane, Trolla etc as required for safe completion of work is to be arranged by the contractor. (Distance 0-20 mtr.)
Opening of 33 KV side jumpers and opening of 11 KV cable connections of existing 5/8/10 MVA power T/F placed on plinth.
Carriage of Empty Oil drums from Je Store/Taj store Agra to Site of work 33/11 KV S/S including loading & unloading at both ends distance (0 to 30km) (20 Drums).
Dismantalling of existing 11KV XLPE cable 3x 300/3×185 sq.mm from cable trench coming in the way of shifting of 5/8/10 MVA transformer.
Opening of radiatiors of existing 5/8/10 MVA transformer at various S/s, draining out T/F oil from conservator tank and radiator as per direction of supervising engineer.
Dismantalling / breaking with the help of gas cutter 5/8/10 MVA transformer body earthing at two places and its reconnecting by using MS flat 65x6mm with the help of Arc welding
Removal of existing 5/8/10 MVA transformer from plinth at various S/s & its shifting outside the switchyard at pacca place
Shifting & dragging of 5/8/10 MVA transformer from pacca place to the site of installation in the substation premises (distance about 25 mtr)
Erection and installation of 5/8/10 MVA transformer in a leveled position on the plinth & making of 33 KV & 11 KV jumpers and connections.
Fixing of All radiators, conservator tank and filling of oil in transformer.
Re-laying of above dismantelled cable 3x185/3x300 sq.mm 11 KV XLPE power cable including excavation of earth 600mm deep and brick laying (18 Nos. in One mtr.), sand filling as per RESPO norms including proper filling of earth and leveling at 33/11 KV substation ( The bricks already available from the dismantelled existing trench shall be used.)
Fixing & grouting of cable joist and making the cable connections from 11 KV side of the 5/8/10 MVA transformer with complete work
RE-Fixing Earthing of 5/8/10 MVA transformer body & neutral bushing with bracket of MS channel 100x50x6mm in 'L' shape, grouting with CC 1:3:6 ratio of cement, sand and stone ballast of size 300x300x900mm including plastering the same & welding of MS strip from boring point to neutral bushing.
(Earthing of 5/8/10 MVA transformer body and Neutrual sepreatly 2 Nos. for each/ 1 Nos for existing 11 KV VCB/OCB by maintenance free Earthing Electrods (Chemical) by digging pits 6" dia 3mtr. deep including inserting pipe in pipe technology concept involve two mild steel pipes one inserted inside the other of size ;- 1. Inner pip dia meter 50 Mm. 2. outer pipe dia meter 100 mm. length of the both pipe shall be 3000 mm. The M.S.pipe shall be ISI mark of class B as per IS 1239. Thickness of the pipe shall be 12 swg. The empty space in the pipe shall be filled with the specially developed crystalline material conductiv mixture such as copper and aluminimum powder.conductive carbon and bonding material etc. mixed in diffrent proportions. Conductive mixture contents shall be 70 % carbon powder & 30% metal powder preferably pure copper or aluminum material along with the required quantity of bonding materials. Granule size of the carbon & metal powder shall be 100 mesh. The mixture if forced (pressurized) inside the earth electrode in empty space of inner pipe & in empty space between the inner & outer pipe of the earth electrode, in paste form and after soldification of the same the bottom end cap as well as top end cap is provided. The mixture shall be pressed by machine in the pipe. Precaution shall be taken has to have no air gap inside the pipe while pressing. The back fill compound (earth enhancment material ) shall be superior conductive material that improves earthing effectiveness especially in areas of poor conductivity such as rocky ground, sandy soil & areas of moisture varation. It may contain conductive cement (20%) graphite carbon powder(50%), hydrous aluminum siliacate (10%), Sodium montmorillonite (20%) etc. it shall be placed around earth electrode in the earth pit to improve the conductive of earth electrode & ground contact area. Mild steel electro galavanized Flat 50x6 mm shall welded to earth electrode pips & connected with Trasnformer neutral and body as below with the hlep of steel nut & bolt or through welding as per requirment of site, to GI pipe and filling of chemical mixutre around the GI pipe upto 3 mtr. including making of chamber & connecting the top of the inserted pipe with transformer body & neutral through M.S.flat 50x6mm with the help of nut & bolt or through welding and making a main hole of size 2'×2' and covering the same by a stone pad for the purpose of poring water for moisture.
Removal of Existing Fencing of switchyard at 33/11 KV S/s coming in the way for the work of replacment of damaged 5/8/10 MVA at roadside and its refixing at the same place with the help of arc belding after completion of above work.
Carriage of Oil drums from work site 33/11 KV S/S to Store/ Taj Store Agra including loading & unloading at both ends 0 to 50 KM approx. (20 Nos. Drums).
om shri sain ram enterprises
M/S SHREE DURGA ELECTRONICS LAB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .