Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹6.9 LAccepted-AOC | 1 | Accepted-AOC L-1 bidder | |
| 2 | 2₹7.2 L+₹31,500 (4.58%)Rejected-Finance VILL P O TIKOLA KALAN ROORKEE HARIDWAR | HARIDWAR | UTTARAKHAND | 247656 | 2 | Rejected-Finance L-2 bidder | |
| 3 | 2₹7.2 L+₹31,500 (4.58%)Rejected-Finance | 2 | Rejected-Finance L-2 bidder | |
| 4 | 3₹7.8 L+₹86,500 (12.6%)Rejected-Finance | 3 | Rejected-Finance L-3 bidder | |
| 5 | 4₹8.3 L+₹1.4 L (20.7%)Rejected-Finance KADARPUR ROAD KADARPUR ROAD NEAR PARJAPATI DHARAMSHALA BADSHAPUR GURUGRAM 122001 | GURUGRAM | HARYANA | 122001 | 4 | Rejected-Finance L-4 bidder |
Tender Value
Refer Docs
EMD Value
₹22,100
Closing Date
26 Dec 2023, 1:00 pmClosed
JIT SINGH
O/o XEN/CMDP-I, PTPS,HPGCL,Panipat. CE PTPS Panipat
ARC for regular cleaning of screen of CW pump House /Cooling Tower and removal of silt/vegetation/Grass from the basin of Cooling tower Unit-6, 7 and 8 at PTPS Panipat
2023_HBC_336340_1
202332D3EA60 E983 444D 8A5F EC187406C0DA713PGC
Open Tender
Civil Works
Works
365 days
ASSAN KHURD
As per CBD. Bid preparation shall be strictly as per section 1 (C)- Preparation of bid. All the documentsspecified in preparation of bid shall be submitted.
2 documents required · 2 mandatory
₹1,180
₹22,100
Yes
18 Jan 2024
14 Dec 2023
27 Dec 2023
14 Dec 2023
26 Dec 2023
14 Dec 2023
Amount
Regular cleaning of coarse/fine screen of CW pump houses/Cooling Towers in Unit- 6, 7 and 8 daily with wire brush/jaws, and even in odd hours including lifting and lowering the top screens with the help of crane/chain block or by any other means in each panel of CW sump and cooling tower as and when required for cleaning of the same as per instruction and direction of Engineer-in-charge. Man/Machine should be deployed round the clock.
Lowering / lifting of CW gates for restriction of entry of water in sump making all arrangement for assembly gates, SS nut bolts, SS tie roads and all other arrangement for lifting / lowering gates. (only crane will be arrangement by department free of cost) (one no. operation contains 4 no gates in each bay)
Survey of the area under water CW sump Unit- 7 and 8 and other site by deputing Diver team as per availability of the site during closer/running position as per availability of unit- 7 and 8. The scope also include “removal of iron pieces, concrete pieces and other foreign material found in the surveyed area as directed by Engineer-In-Charge. Each operation comprises of at least 2 days for survey of area mentioned as above.
Removal of silt/vegetation/Grass from the basin of Cooling tower Unit-6,7 and 8 PTPS, Panipat
S K ENTERPRISES
MALIK CONSTRUCTION COMPANY
THE SAWARIYA CO-OPERATIVE MULTIPURPOSE SOCIETY LIMITED PANIPAT
Parveen Kumar Contractor
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .