Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.8 LAccepted-AOC SITHARKADU MAYILADUTHURAI | MAYILADUTHURAI | MAYILADUTHURAI | TAMIL NADU | 1 | Accepted-AOC l1 accepted | |
| 2 | 2₹4.8 L+₹4,805.24 (1.01%)Rejected-Finance | 2 | Rejected-Finance Highest Quotation Rejected | |
| 3 | 3₹5.0 L+₹18,718.40 (3.92%)Rejected-Finance | 3 | Rejected-Finance Highest Quotation Rejected | |
| 4 | 4₹5.1 L+₹30,626.50 (6.42%)Rejected-Finance | 4 | Rejected-Finance Highest Quotation Rejected |
Tender Value
₹5.4 L
EMD Value
₹5,400
Closing Date
20 Apr 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Block development officer,Mayiladuthurai
Block Development Office, Mayiladuthurai
Construction of Horizontal Soak Pit 2 No.s in Achurharayapuram Mariyamman Kovil Near , Pallpannai Santhu ,Construction of Vertical Soak Pit 2 Nos Dharmapuram Kezha Theru and South Street Junction ,Ambhathkar Street In Mannampandal Panchayat
2022_RDTN_228634_1
304/2022/B5
Open Tender
Civil Works
Works
120 days
Block development office
Refer Tender Document
8 documents required · 8 mandatory
₹0
₹5,400
Block development office,Mayiladuthurai
17 May 2022
9 Apr 2022
20 Apr 2022
9 Apr 2022
20 Apr 2022
9 Apr 2022
9 Apr 2022 - 11 Apr 2022
11 Apr 2022
90 days
Amount
01.Construction of Horizontal Soak Pit Achurharayapuram Mariyamman Kovil Near at Mannampandal Panchyat in Mayiladuthurai Block
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
Cement mortar 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
Cement concrete 1:2:4 mix using 20 mm ISS metal including cost and conveyance of all materials to site and labour charges for mixing, laying, and curing etc complete for 10 cum
Centering below GL: Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
Brick work in cement mortar 1:5 mix using country bricks 83/4"x41/4"x23/4" and conveyance of all materials to site and all labour charges etc complete
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Filling with 40mm HBG metal including all conveyance of all materials to site and all labour charges etc complete
Collection and supply of Sand and filling into the basement including cost and conveyance to the site and all labour charges for filling as per standard specification
Collection and supply of gravel for filling from approved quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work).
Supplying and fixing P.V.C rainwater down fall pipe of 110m dia with necessary shoes, bends,& clamps etc.,
Supply of PVC pipes 63mm dia with all labour charges etc complete
Provision for Name board Charges
02.Construction of Horizontal Soak Pit Pallpannai Santhu at Mannampandal Panchyat
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
Cement mortar 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
Cement concrete 1:2:4 mix using 20 mm ISS metal including cost and conveyance of all materials to site and labour charges for mixing, laying, and curing etc complete for 10 cum
Centering below GL: Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
Brick work in cement mortar 1:5 mix using country bricks 83/4"x41/4"x23/4" and conveyance of all materials to site and all labour charges etc complete
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Filling with 40mm HBG metal including all conveyance of all materials to site and all labour charges etc complete
Collection and supply of Sand and filling into the basement including cost and conveyance to the site and all labour charges for filling as per standard specification
Collection and supply of gravel for filling from approved quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work).
Supplying and fixing P.V.C rainwater down fall pipe of 110m dia with necessary shoes, bends,& clamps etc.,
Supply of PVC pipes 63mm dia with all labour charges etc complete
Provision for Name board Charges
03.Construction of Vertical Soak Pit Dharmapuram Kezha Theru and South Street Junction at Mannampandal Panchyat
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
Cement mortar 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
Cement concrete 1:2:4 mix using 20 mm ISS metal including cost and conveyance of all materials to site and labour charges for mixing, laying, and curing etc complete for 10 cum
Centering below GL: Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
Brick work in cement mortar 1:5 mix using country bricks 83/4"x41/4"x23/4" and conveyance of all materials to site and all labour charges etc complete
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Filling with 40mm HBG metal including all conveyance of all materials to site and all labour charges etc complete
Filling with 20mm HBG metal including all conveyance of all materials to site and all labour charges etc complete
Collection and supply of gravel for filling from approved quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Provision for Name board Charges
04.Construction of Vertical Soak Pit Ambhathkar Street at Mannampandal Panchyat
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
Cement mortar 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
Cement concrete 1:2:4 mix using 20 mm ISS metal including cost and conveyance of all materials to site and labour charges for mixing, laying, and curing etc complete for 10 cum
Centering below GL: Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
Brick work in cement mortar 1:5 mix using country bricks 83/4"x41/4"x23/4" and conveyance of all materials to site and all labour charges etc complete
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Filling with 40mm HBG metal including all conveyance of all materials to site and all labour charges etc complete
Filling with 20mm HBG metal including all conveyance of all materials to site and all labour charges etc complete
Collection and supply of gravel for filling from approved quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Provision for Name board Charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
E.Keerthivasan
M/s. M.F.Construction
D.Saravanakumar
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .