SE (CIVIL) AVVNL AJMER
O/O SE (CIVIL), HATHI BHATA POWER HOUSE , AVVNL , AJMER
Renovation of building, boundary wall and Raising of boundary wall at Satola, Choti Sadri, Pratapgarh
2026_AVVNL_602488_3
NIB-09
Open Tender
Civil Works
Percentage
120 days
Satola, Chotisadri
PLEASE REFER TENDER DOCUMENTS
3 documents required · 3 mandatory
₹590
AO O and M AVVNL Chittorgarh and MD RISL JAIPUR
₹20,000
Yes
1 Oct 2026
1 Oct 2026
23 Oct 2026
1 Oct 2026
22 Oct 2026
1 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | : BUILDING WORK : Brick work with F.P.S. bricks of class designation 75 in superstructure above plinth level upto floor V level in all shapes and sizes in : Cement mortar 1 : 6 (1 cement : 6 coarse sand) | 39 | Pcum | 5,988 | ₹2,33,532 |
| 2 | Providing & fixing precast cement concrete coping 1 : 2 : 4 mix 50mm thick complete as per specification : | 140 | Psqm | 440 | ₹61,600 |
| 3 | Plaster on new surface on walls in cement sand mortar 1:6 including racking of joint etc. complete fine finish :20mm thick. | 550 | Psqm | 228 | ₹1,25,400 |
| 4 | Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5 m , disposed earth to be levelled and neatly dressed:All kinds of soil Earth, Sand, Lime, Morrum manure or sludge For 5 Km. deduct Up to 50 M | 40 | Pcum | 286 | ₹11,440 |
| 5 | Structural steel work in single section fixed with or without connecting plate including cutting, hoisting ( height upto 10 m), fixing in position and applying a priming coat of approved steel primer all complete. | 60 | P.cum | 83 | ₹4,980 |
| 6 | Painting exterior surface of Wall with 100% acrylic exterior paint of approved brand and manufacture to give an even shade with two or more coats including prepartion of base with sand papering, primer, putty, etc complete in all respect including scaffolding and safety provision NewWork | 480 | Psqm | 135 | ₹64,800 |
| 7 | Painting exterior surface of Wall with 100% acrylic exterior paint of approved brand and manufacture to give an even shade with two or more coats including prepartion of base with sand papering, primer, putty, etc complete in all respect including scaffolding and safety provision Old Work | 597.58 | Psqm | 55 | ₹32,866.9 |
| 8 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared. | 1,500 | Psqm | 5 | ₹7,500 |
| 9 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level.M20 grade Nominal Mix 1: 1.5: 3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20mm nominal size). | 19 | Pcum | 5,898 | ₹1,12,062 |
| 10 | Supplying and fixing fixed wire gauge of 14 mesh x 24 gauge to the metal frame of rolled section by metal beading 20x3mm with suitable screw at not exceeding 150mm distance. | 10 | Psqm | 679 | ₹6,790 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 7.90 MB
Tenderdocuments.pdf
Tender Documents • 2.09 MB
Termsandconditionspgh.pdf
Other Document • 0.62 MB
BOQ_1068082.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .