Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹58.2 LAccepted-AOC | ₹58.2 L | L1 | Accepted-AOC L1 AWARDED |
| 2 | L2₹69.1 L+₹10.9 L (18.8%)Rejected-Finance | ₹69.1 L+₹10.9 L (18.8%) | L2 | Rejected-Finance L2 REJECTED |
Tender Value
₹62.8 L
EMD Value
₹63,000
Closing Date
28 May 2026, 5:30 pmClosed
EXECUTIVE OFFICER NAC DIGAPAHANDI
NAC OFFICE DIGAPAHANDI
RENOVATION AND BEAUTIFICATION OF NELIA BANDHA, DIGAPAHANDI
2026_ORULB_129292_1
DIGNAC-02/2026-27
Open Tender
Civil Works - Others
Percentage
180 days
NAC DIGAPAHANDI
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹63,000
Yes
EXECUTIVE OFFICER CHAMBER NAC DIGAPAHANDI
19 Sept 2026
14 May 2026
29 May 2026
14 May 2026
28 May 2026
14 May 2026
14 May 2026 - 19 May 2026
20 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth Work in excavation of foundation all kinds of soil within initial leads of 50m & lifts of 1.5m including dressing and levelling of bed etc. and adding contractor's profit and over head charges, etc. complete in all respect | 0.8 | CUM | - | - |
| 2 | Supplying & filling foundation and plinth with course sand well watered and rammed including cost, cost of all labour, carriage, royalty, etc complete. | 0.2 | CUM | - | - |
| 3 | Supplying & filling foundation and plinth with course sand well watered and rammed including cost, cost of all labour, carriage, royalty, etc complete. 2/3 rate of excavation. | - | CUM | - | - |
| 4 | C.C (1:4:8) with 4cm size HG CRUSHER BROKEN metal including all cost, conveyance,royalty & taxes etc.comp.to work site as per specification approved by the department & direction of E.I.C | - | CUM | - | - |
| 5 | R.C.C work of M-20 grade with 20mm & down grade BHG C/B chips including hoisting, laying & all cost, conveyance, royalty & taxes etc. comp. to work site as per the specification approved by the deptt. & direction of EIC.( Including centering & shuttering)
Base Foundation | 0.2 | CUM | - | - |
| 6 | Supplying fitting & placing uncoated HYSD reinforcement including cutting, bendind,binding & placing the steel rods as per drawing & technical specification with cost of binding wire 18 to 20 gauge | - | QNTL | 1 | - |
| 7 | 16mm thick C.P. (1:6) over brick masonary to the smooth surface including watering, curing cost, carriage, royalty, and taxes of all materials, cost of all labour, etc complete as per the direction of E.I.C. | - | SQM | - | - |
| 8 | Priming one coat with any approved primer WALL SURFACE (PLASTERED SURFACE) | - | SQM | - | - |
| 9 | Wall painting 2 uniform coats with weather coat paint of approved shade on new work to give an even shade | - | SQM | 1 | - |
| 10 | Supplying, fitting and fixing of stainless steel of 304 grade in hand railling using 50mm dia of 32mm x 32mm x 2mm @ 0.90mtr C/C and stainless square pipe bracing of size 32mm x 32mm x 2mm 3 rows in staircase as per approved design and specification, buffing, polishing etc with cost, conveyance, taxes of all materials, labour, T & P etc required for the work complete in all respect. | - | RMT | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.13 MB
BOQ_591351.xls
BOQ • 0.34 MB
NELIABANDHANEW.pdf
Tender Documents • 5.11 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .