Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.7 LAccepted-Finance | ₹17.7 L | L1 | Accepted-Finance Accept |
| 2 | L2₹18.1 L+₹38,391.11 (2.17%)Rejected-Finance | ₹18.1 L+₹38,391.11 (2.17%) | L2 | Rejected-Finance Reject |
| Sl No | Description | Qty | Unit | SVM Construction L1 | srikamatchicontractors L2 |
|---|---|---|---|---|---|
| 1.00Construction of 30000 Lit's Capacity OHT (12.00m Staging Height ) Alavaipatty H/O Alavaipatty | |||||
| 2.00 | Earth work Excavation for Foundation in all soils and Sub Soil as per SS20B for foundation etc. complete.SS 20B | 64.9 | Cum | 257 ₹16,679.3 Lowest | 540 ₹35,046 |
| 3.00 | Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with Standard specification. | 8.11 | Cum | 1,736.95 ₹14,086.66 Lowest | 1,736.95 ₹14,086.66 Lowest |
| 4.00 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete | 4.78 | Cum | 5,344.82 ₹25,548.24 Lowest | 5,344.82 ₹25,548.24 Lowest |
| 5.00 | Brick work in cement mortar 1:5 mix using Fly bricks 83/4"x41/4"x23/4" including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete | 0.25 | Cum | 7,292.71 ₹1,823.18 Lowest | 7,292.71 ₹1,823.18 Lowest |
| 6.00 | Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete | 0.54 | Cum | 6,635.87 ₹3,583.37 Lowest | 6,635.87 ₹3,583.37 Lowest |
| 7.00 | Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete | 4.73 | Cum | 282.43 ₹1,335.89 Lowest | 282.43 ₹1,335.89 Lowest |
| 8.00Reinforced cement concrete 1:1.5:3mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete | |||||
| 9.00 | Items 1.50 m to 4.50m below GL | 8.62 | Cum | 9,205.29 ₹79,331.19 Lowest | 9,205.29 ₹79,331.19 Lowest |
| 10.00 | Items 0 m to 1.50m below GL | 1.49 | Cum | 9,066.52 ₹13,545.38 Lowest | 9,066.52 ₹13,545.38 Lowest |
Tender Value
₹18.1 L
EMD Value
₹18,100
Closing Date
17 Mar 2026, 5:00 pmClosed
BDO BP
BDO Office Vennandur
Construction of 30000 Lit s Capacity OHT (12.00m Staging Height) Alavaipatty H/O Alavaipatty
2026_RDTN_673985_1
940/2026/A2
Open Tender
Civil Works
Item Rate
120 days
Vennandur
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹18,100
Yes
18 Sept 2026
12 Mar 2026
17 Mar 2026
12 Mar 2026
17 Mar 2026
12 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of 30000 Lit's Capacity OHT (12.00m Staging Height ) Alavaipatty H/O Alavaipatty | - | - | - | - |
| - | Earth work Excavation for Foundation in all soils and Sub Soil as per SS20B for foundation etc. complete.SS 20B | 64.9 | Cum | - | - |
| - | Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with Standard specification. | 8.11 | Cum | - | - |
| - | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete | 4.78 | Cum | - | - |
| - | Brick work in cement mortar 1:5 mix using Fly bricks 83/4"x41/4"x23/4" including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete | 0.25 | Cum | - | - |
| - | Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete | 0.54 | Cum | - | - |
| - | Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete | 4.73 | Cum | - | - |
| - | Reinforced cement concrete 1:1.5:3mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete | - | - | - | - |
| - | Items 1.50 m to 4.50m below GL | 8.62 | Cum | - | - |
| - | Items 0 m to 1.50m below GL | 1.49 | Cum | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_810095.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.86 MB
Alavaipattiohttechnicalbid.pdf
Tender Documents • 1.36 MB
BOQ_810095.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .