| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.2 CrAdmitted-Finance | -38.71% | ₹1.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.3 Cr+₹3.7 L (3.07%)Admitted-Finance | -36.83% | ₹1.3 Cr+₹3.7 L (3.07%) | L2 | Admitted-Finance |
| 3 | L3₹1.3 Cr+₹5.2 L (4.24%)Admitted-Finance | -36.11% | ₹1.3 Cr+₹5.2 L (4.24%) | L3 | Admitted-Finance |
| 4 | L4₹1.3 Cr+₹12.8 L (10.5%)Admitted-Finance | -32.27% | ₹1.3 Cr+₹12.8 L (10.5%) | L4 | Admitted-Finance |
| 5 | L5₹1.4 Cr+₹19.3 L (15.8%)Admitted-Finance | -29.01% | ₹1.4 Cr+₹19.3 L (15.8%) | L5 | Admitted-Finance |
Tender Value
₹2.3 Cr
EMD Value
₹4.7 L
Closing Date
24 Aug 2026, 6:00 pmClosed
SE WR CIRCLE UDAIPUR
SE WR CIRCLE UDAIPUR
CONSTRUCTION OF TRIVENI ANICUT SARNI RIVER GP-ISARWAS PS-SALUMBER DIST-SALUMBER
2026_WRDAS_581740_1
SE/05/2026-27
Open Tender
Civil Works
Percentage
365 days
SALUMBER
AS PER NIT
3 documents required · 3 mandatory
₹5,000
EE WR DIVISION SALUMBER
₹4.7 L
Yes
18 Sept 2026
4 Aug 2026
25 Aug 2026
4 Aug 2026
24 Aug 2026
4 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cutting and clearance of jungle, bushes, shrubs, Ankra / Ipomoea, Julicfloratypna etc. on canal and bunds in dry /moist /slushy conditions including disposal as per instructions of the Engineer-in-charge. Cost of wood has been deducted from rates and thus will be property of contractor after cutting . ordinary | 5,000 | Sqm. | 1.45 | ₹7,250 |
| 2 | Excavation loading, unloading disposal and dressing of excavated earth within initial lead of 50 m and lift up to 1.5 m in dry or moist including dressing of excavated area,dewatering wherever required complete in all respect.Hard soil mixed with kankar / boulders,morrum | 445 | Cum | 99 | ₹44,055 |
| 3 | Excavation including loading , unloading disposal and dressing of excavated rock within initial lead of 50 m and lift up to 1.5 m in dry or moist including dressing of excavated area,dewatering wherever required complete in all respect. Soft / disintegreted rock | 1,113 | Cum | 134 | ₹1,49,142 |
| 4 | Excavation including loading , unloading disposal and dressing of excavated rock within initial lead of 50 m and lift up to 1.5 m in dry or moist including dressing of excavated area,dewatering wherever required complete in all respect. Hard rock not requiring blasting | 1,336 | Cum | 201 | ₹2,68,536 |
| 5 | Excavation including loading , unloading disposal and dressing of excavated rock within initial lead of 50 m and lift up to 1.5 m in dry or moist including dressing of excavated area,dewatering wherever required complete in all respect. Phylite& other hard rock requiring nominal blasting | 890 | Cum | 291 | ₹2,58,990 |
| 6 | Excavation including loading , unloading disposal and dressing of excavated rock within initial lead of 50 m and lift up to 1.5 m in dry or moist including dressing of excavated area,dewatering wherever required complete in all respect. Hard rock (dry or moist) requiring blasting (where hardness of rock is more than 2) including disposal of excavated material in the designated spoil bank / embankment, dressing of excavated material and dewatering with all leads & lifts of excavation and disposal. The contractor is free to use the usable excavated stone else where for which any transition expenditure & royalties, tax etc if required to be paid then it will be liability of contractor as the cost of usable stone has already been deducted from the rate. | 668 | Cum | 336 | ₹2,24,448 |
| 7 | Preparation of foundation of structure including removal of all loose stones , silt and final washing By manual labour | 1,166 | Sqm. | 23 | ₹26,818 |
| 8 | Side shuttering including propping etc. complete to achieve finish F 2 for : Top or intermediate bed plates, in between masonry or piers, abutments sluice wells etc. | 284.4 | Sqm. | 185 | ₹52,614 |
| 9 | Retaining wall, counterfort, abutment, wing walls up stream or downstream slope facings of dams and open faces of construction joints etc | 2,595 | Sqm. | 220 | ₹5,70,900 |
| 10 | Providing and Laying in position of Cement concrete Nominal mix (1:3:6) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto 20 mm | 373 | Cum | 4,818 | ₹17,97,114 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.57 MB
Tendernotice_2.pdf
PDF • 2.20 MB
FinalBid.pdf
Tender Documents • 2.18 MB
FullNIT.pdf
Other Document • 2.55 MB
BOQ_1033587.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .