Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹39.0 LAccepted-AOC AT ROAD BOKAKHAT ASSAM | ₹39.0 L | L1 | Accepted-AOC Awarded |
| 2 | L2₹39.4 LRejected-Finance | ₹39.4 L | L2 | Rejected-Finance Refer to Financial minutes. |
| 3 | L3₹39.5 LRejected-Finance | ₹39.5 L | L3 | Rejected-Finance Refer to Financial minutes. |
| Sl No | Description | Qty | Unit | M/S. M.P. AGARWALLA L1 | Jay Agarwalla L2 | Nirmal Kumar Agarwalla L3 |
|---|---|---|---|---|---|---|
| 1.00(i) WATER HARVESTING STRUCTURE | ||||||
| 1.01 | Clearing and Grubbing Road Land (i)By Manual Means (a)In area of non thorny jungle | 0.57 | Hect. | 55,809 ₹32,090.18 | 55,809 ₹32,090.18 | 55,810 ₹32,090.75 |
| 1.02 | Excavation in Marshy Soil (Excavation for roadway in marshy soil with hydraulic excavator 0.9 cum bucket capacity including cutting and loading in tippers and disposal with in a lift upto 1.5m and lead up to 1000 meters, trimming of bottom and side slopes in accordance with requirements of lines, grades and cross sections as per Technical Specification Clause 302.3.6.) | 1,710.18 | m3 | 78 ₹1.3 L | 79 ₹1.4 L | 80 ₹1.4 L |
| 1.03 | Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50m as per Technical Specification Clause 302.3 | 9,140.48 | m3 | 145 ₹13.3 L | 145 ₹13.3 L | 145 ₹13.3 L |
| 1.04 | Sign Board as per IWMP norms including fitting fixing. | 1 | No. | 12,627 ₹12,627 | 12,627 ₹12,627 | 12,635 ₹12,635 |
| 2.00(ii) EARTHEN AGRICULTURAL BUND WITH HUME PIPE CULVERT | ||||||
| 2.01 | Clearing and grubbing drain including rank vegetation, grass, bushes, sapling etc. and dispose of unserviceable materials outside the periphery of the area. By manual means | 0.7 | Hect. | 55,809 ₹39,066.30 | 55,810 ₹39,067 | 55,810 ₹39,067 |
| 2.02 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5m,transporting to site ,spreading,grading to required slope and and ompacting p g to meet requirement of table 300.1 and 300.2 with a lead upto 1000m. | 6,734.81 | m3 | 271.5 ₹18.3 L | 273.5 ₹18.4 L | 275 ₹18.5 L |
| 2.03 | Furnishing and laying of the live sods of perennial turf forming grass on embankment slope, verges or other locations shown on the drawing or as directed by the Engineer including preparation of ground, fetching of sods and watering as per Technical Specification Clause 309. | 4,573.69 | m2 | 24.4 ₹1.1 L | 30 ₹1.4 L | 30 ₹1.4 L |
| 2.04 | Hume Pipe NP3 - (600 mm dia) | 15 | Rm | 6,819 ₹1.0 L | 6,820 ₹1.0 L | 6,820 ₹1.0 L |
Tender Value
₹39 L
EMD Value
₹78,000
Closing Date
22 Dec 2025, 2:00 pmClosed
Director of Soil Conservation
O/o The DSC, Bhumi sangrakshan bhanvan, RGB Road, Guwahati -05
Enhanced Soil Moisture Retention and Mitigation Strategies Via Structural and Non-Structural Measures for drought like Situation in Dhansiri Sub-Division under SOPD DRR
2025_SCD_49135_1
Tender/NIT/Pt-I/2025-26/5335
Open Tender
Civil Works
90 days
Dhansiri Sub-Division
Please refer Tender documents.
3 documents required · 3 mandatory
₹800
₹78,000
Yes
O/o The DSC, Assam
14 Mar 2026
9 Dec 2025
22 Dec 2025
11 Dec 2025
22 Dec 2025
16 Dec 2025
15 Dec 2025
Amount
(i) WATER HARVESTING STRUCTURE
Clearing and Grubbing Road Land (i)By Manual Means (a)In area of non thorny jungle
Excavation in Marshy Soil (Excavation for roadway in marshy soil with hydraulic excavator 0.9 cum bucket capacity including cutting and loading in tippers and disposal with in a lift upto 1.5m and lead up to 1000 meters, trimming of bottom and side slopes in accordance with requirements of lines, grades and cross sections as per Technical Specification Clause 302.3.6.)
Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50m as per Technical Specification Clause 302.3
Sign Board as per IWMP norms including fitting fixing.
(ii) EARTHEN AGRICULTURAL BUND WITH HUME PIPE CULVERT
Clearing and grubbing drain including rank vegetation, grass, bushes, sapling etc. and dispose of unserviceable materials outside the periphery of the area. By manual means
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5m,transporting to site ,spreading,grading to required slope and and ompacting p g to meet requirement of table 300.1 and 300.2 with a lead upto 1000m.
Furnishing and laying of the live sods of perennial turf forming grass on embankment slope, verges or other locations shown on the drawing or as directed by the Engineer including preparation of ground, fetching of sods and watering as per Technical Specification Clause 309.
Hume Pipe NP3 - (600 mm dia)
Miscellaneous items
Installation of RCC sign board
(ii) EARTHEN AGRICULTURAL BUND WITH HUME PIPE CULVERT
Tree Guard with MS Iron as per enclosed Analysis Rate
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deletrious matter ,dressing of sides and bottom and backfilling with approved material.
Plain/reinforced cement concrete in substructure complete as per drawings and technical specification.
Fitting and fixing of RCC sign board with painting and writing .
Jay Agarwalla (BID ID -289606)
Nirmal Kumar Agarwalla (BID ID -289603)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.49 MB
BIDGolaghatDhansiri.pdf
Tender Documents • 0.91 MB
BOQ_78020.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid