Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical found correct |
| 2 | Accepted-Technical | Accepted-Technical found correct |
| 3 | Not Admitted-Fee/PreQual/Technical R O HAGNIS | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical R O BOGDANG | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹8.8 L
EMD Value
₹20,820
Closing Date
5 Dec 2025, 4:00 pmClosed
Executive Engineer PWD RnB Nubra
The Executive Engineer PWD (RnB) Nubra.
Construction of abutments of temporary bailey Bridge over Shayok River near Shatse Taknak.
2025_PWD_18086_1
51 of PWD RnB Nubra 2025-26
Open Tender
Civil Works - Bridges
Percentage
10 days
Nubra
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
Executive Engineer PWD RnB Nubra.
₹20,820
15 Dec 2025
1 Dec 2025
6 Dec 2025
1 Dec 2025
5 Dec 2025
1 Dec 2025
Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil
Dry stone pitching (any thickness) including cost of stones. On Horizontal., including carriage complete.
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m.
Constructing vertical bunds with sloping faces, by boulder filling (dry, hand packed tightly); including cost of stones, including cost of wirecrates, including carriage complete.
Making knitted wire crates of approved mesh-size; including weaving, binding sides and partitions, and binding top after filling; excluding cost of filling, stones and weaving materials
Add ost of crate wires including carriage complete. A) 16x16 crates
B) 20x16 crates
Earth work in rough excavation, banking excavated earth in layers not exceeding 20cm in depth, breaking clods, watering, rolling each layer with ½ tonne roller or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, lead upto 50 m and lift upto 1.5 m : All kinds of soil. Deduct for not rolling with power roller of minimum 8 tonnes for banking excavated earth in layers not exceeding 20 cm in depth. Deduct for not watering and excavated earth for banking.
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.95 MB
BOQ_43735.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .