Tender ID
Tender Value
₹1.5 Cr
EMD Value
₹9.4 L
Closing Date
16 Mar 2026, 12:00 pmClosed
SUPERINTENDING ENGINEER
OFFICE OF SE UNNAO CIRCLE PWD UNNAO
Construction of Mahamau Road to Khutena Link Road
2026_CEUCZ_1123660_1
1014/M/1MT/E-TENDER/UC/2026 DT 28.02.2026
Open Tender
Civil Works - Roads
Percentage
365 days
HARDOI
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,715
₹9.4 L
Yes
21 Mar 2026
11 Mar 2026
16 Mar 2026
11 Mar 2026
16 Mar 2026
11 Mar 2026
Construction of embankment with approved material obtained from availble land as permitted and approved by Engineer-in-Charge and as per Technical Specitaion Clause 301.3.4.1, with all lifts and leads, spreading, grading to required slope and compacting to meet requirement of Tables 300.1and 300.2 as per Technical Specification clause 301.5 (SOR-253) (Rates are Including Labour Cess but Excluding GST)
Excavation in soil using hydraulic excavator and tipper with disposal upto 1000 m excavation for roadwork in soil with hydraulic excavator of 0.90 cum bucket capacity including cutting and loading in tipper, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-section and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per technical specification clause 302.3. (Rates are Including Labour Cess but Excluding GST)
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per technical specification clause 401. (Rates are Including Labour Cess but Excluding GST)
Providing ,Laying and spreading material on a prepared subbase ,cement @ 4 % by weight to the spread material manually,mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of base. (Rates are Including Labour Cess but Excluding GST)
Construction of Subgrade and Earthen Shoulders with approved material obtained from borrow pits availble land with all lifts and leads, spreading, grading to required slope and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specitaion Clause 303.1 (Rates are Including Labour Cess but Excluding GST)
Providing and applying tack coat with Bitumen (VG-10) using bitumen distributor at the rate of 0.35 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. (Rates are Including Labour Cess but Excluding GST)
Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of Type C as per Technical Specification Clause 508. (Rates are Including Labour Cess but Excluding GST)
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C, as per Technical Specification Clause 510 (Rates are Including Labour Cess but Excluding GST)
Plain cement concrement 1:3:6 nominal mix in foundation with crushed aggregate 40 mm nominal size mechanically mixed,placed in foundation and compected by vibration including curing for 14 days. (Rates are Including Labour Cess but Excluding GST)
Laying reinforced cement concrement pipe for culverts on first class bedding of granular material in single row including fixing collar with cement motar 1:2 but excluding excavation,protection works,back filling,concrete and masonary works in head walls and parapets (3 No. x 2.50 Mt = 7.50 Mt) (1000 mm dia RCC NP-3 hume pipe) (Rates are Including Labour Cess but Excluding GST)
Brick masonry work in 1:3 cement mortar in foundation complete excluding pointing and plastering as per drawing and technical speficiations clauses 600,603,604, 1202 & 1204 (Rates are Including Labour Cess but Excluding GST)
Pointing with cement mortar (1:3) on brickwork in sub structure & super structure as per drawing and technical specification clauses 613.3 , 1204 and 1208.4 (Rates are Including Labour Cess but Excluding GST)
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding material to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. (Rates are Including Labour Cess but Excluding GST)
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M 30 (Grade).................approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501. (Rates are Including Labour Cess but Excluding GST)
Maintenance of Constructed Road for Next five year after the actual date of Completion. The Contractor shall be paid total maintenance cost as for Five years in the form of Installments as given below.Payment Shall be Done as per P.W.D. Specification.(Rates are Including Labour Cess but Excluding GST) for 1 st Year & 2nd Year after the Actual Date of Completion Maintenance @ 0.75 %
Maintenance of Constructed Road for Next five year after the actual date of Completion. The Contractor shall be paid total maintenance cost as for Five years in the form of Installments as given below.Payment Shall be Done as per P.W.D. Specification.(Rates are Including Labour Cess but Excluding GST) for 3rd Year after the Actual Date of Completion Maintenance @ 1.50 %
Maintenance of Constructed Road for Next five year after the actual date of Completion. The Contractor shall be paid total maintenance cost as for Five years in the form of Installments as given below.Payment Shall be Done as per P.W.D. Specification.(Rates are Including Labour Cess but Excluding GST) for 4th Year after the Actual Date of Completion Maintenance @ 2.25 %
Maintenance of Constructed Road for Next five year after the actual date of Completion. The Contractor shall be paid total maintenance cost as for Five years in the form of Installments as given below.Payment Shall be Done as per P.W.D. Specification. (Rates are Including Labour Cess but Excluding GST) for 5th Year after the Actual Date of Completion Maintenance @ 3.00 %
Maintenance of Constructed Road for Next five year after the actual date of Completion. The Contractor shall be paid total maintenance cost as for Five years in the form of Installments as given below.Payment Shall be Done as per P.W.D. Specification.(Rates are Including Labour Cess but Excluding GST) for 1 st Year & 2nd Year after the Actual Date of Completion maintenance @ 0.25 % for CC
Maintenance of Constructed Road for Next five year after the actual date of Completion. The Contractor shall be paid total maintenance cost as for Five years in the form of Installments as given below.Payment Shall be Done as per P.W.D. Specification.(Rates are Including Labour Cess but Excluding GST) for 3rd Year after the Actual Date of Completion maintenance @ 0.50 % for CC
Maintenance of Constructed Road for Next five year after the actual date of Completion. The Contractor shall be paid total maintenance cost as for Five years in the form of Installments as given below.Payment Shall be Done as per P.W.D. Specification.(Rates are Including Labour Cess but Excluding GST) for 4th Year after the Actual Date of Completion maintenance @ 0.75 % for CC
Maintenance of Constructed Road for Next five year after the actual date of Completion. The Contractor shall be paid total maintenance cost as for Five years in the form of Installments as given below.Payment Shall be Done as per P.W.D. Specification.(Rates are Including Labour Cess but Excluding GST) for 5th Year after the Actual Date of Completion maintenance @ 1.00 % for CC
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. as per morth specification no 201 (Rates are Including Labour Cess but Excluding GST)
Dismanteling brick work or stone work in lime or cement mortar and including stacking of Dismateled materials as directed by Engineer in charge within a distance of 60 mtr. As per SI no.- 692 (Rates are Including Labour Cess but Excluding GST)
Earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. (Rates are Including Labour Cess but Excluding GST)
Plain cement concrement 1:3:6 nominal mix in foundation with crushed aggregate 40 mm nominal size mechanically mixed,placed in foundation and compected by vibration including curing for 14 days.as per drawing and technical speficiations Clauses 802,803,1202 & 1203 (Rates are Including Labour Cess but Excluding GST)
Sand Filling in foundation trenches as per drawing and technical specification Clause 305.3.9 (Rates are Including Labour Cess but Excluding GST)
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. RCC Grade M25 (in Bridge portion ) (Rates are Including Labour Cess but Excluding GST)
Supplying, fitting and placing HYSD bar reinforcement complete as per drawing and technical specifications
Providing weep holes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 (Rates are Including Labour Cess but Excluding GST)
Drainage spouts complete as per drawing and technical specifications Clause 1209 (Rates are Including Labour Cess but Excluding GST)
Plain/Reinforced Cement Concrete in foundation complete as per Drawing and Technical Specifications. RCC Grade M20 (Rates are Including Labour Cess but Excluding GST)
Construction of embankment with approved material obtained from availble land as permitted and approved by Engineer-in-Charge and as per Technical Specitaion Clause 301.3.4.1, with all lifts and leads, spreading, grading to required slope and compacting to meet requirement of Tables 300.1and 300.2 as per Technical Specification clause 301.5 (SOR-253) (Rates are Including Labour Cess but Excluding GST)
Laying reinforced cement concrement pipe for culverts on first class bedding of granular material in single row including fixing collar with cement motar 1:2 but excluding excavation,protection works,back filling,concrete and masonary works in head walls and parapets (3 No. x 2.50 Mt = 7.50 Mt) (1000 mm dia RCC NP-3 hume pipe) (Rates are Including Labour Cess but Excluding GST)
Laying brick soling on prepared sub-grade with brick on end edging according to lines,graded and cross-section shown on the drawing filling joints with sand and earth,spreading 25 mm thick layer of earth over brick soling,watering and rolling the same with three wheeled road roller 80-100 kN as per Technical Specification Clause 412 (Rates are Including Labour Cess but Excluding GST)
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.82 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.13 MB
BOQ_2093475.xls
BOQ • 0.34 MB
T2ETENDER.pdf
Tender Documents • 0.47 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .