| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.9 LAccepted-Finance | ₹11.9 L | L1 | Accepted-Finance L1 |
| 2 | L2₹12.3 LAccepted-Finance NO 1 PUDHU STREET NAGAPATTINAM TALUK DISTRICT 611001 | NAGAPATTINAM | TAMIL NADU | 611001 | ₹12.3 L | L2 | Accepted-Finance L2 |
| Sl No | Description | Qty | Unit | DELTA ENGINEERING SERVICE L2 | R. RAJENDRAN L1 |
|---|---|---|---|---|---|
| 1.00BT Renewal of VV Road to KeelaPudupalli Road in Pudupalli Panchayat Km 2/250 - 2/850 | |||||
| 2.00 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A | 60 | M3 | 150 ₹9,000 | 140.3 ₹8,418 |
| 3.00 | Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat | 2,250 | M2 | 50 ₹1.1 L | 34.4 ₹77,400 |
| 4.00Providing and laying Bituminious concrete to 30 mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 | |||||
| 5.00 | Km 2/250 - 2/850 | 67.5 | M2 | 12,940 ₹8.7 L | 12,916.7 ₹8.7 L |
| 6.00Providing and laying gravel including cost and conveyance of gravel from approved sources to worksite and stocking on road side to departmental metric gauge for premeasurement as directed including labour for spreading and compacting etc., complete as per MORD specifications No. 400. | |||||
| 7.00 | Km 2/250 - 2/850 | 30 | M2 | 1,502 ₹45,060 | 1,499.6 ₹44,988 |
| 8.00 | Provision for Name Board charges | 1 | No | 4,600 ₹4,600 | 4,500 ₹4,500 |
| 9.00 | Provision for Photographic charges | 1 | No | 1,500 ₹1,500 | 1,000 ₹1,000 |
| 10.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 1,88,300 ₹1.9 L | 1,81,473 ₹1.8 L |
Tender Value
₹12.0 L
EMD Value
₹12,020
Closing Date
26 Feb 2026, 5:00 pmClosed
The Block Development Officer, Keelaiyur
The Block Development Office, Keelaiyur
BT Renewal of VV Road to KeelaPudupalli Road in Pudupalli Panchayat Km 2/250 - 2/850
2026_RDTN_666312_1
3050/2025/A2
Open Tender
Civil Works
Keelaiyur
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹12,020
27 Feb 2026
25 Feb 2026
26 Feb 2026
25 Feb 2026
26 Feb 2026
25 Feb 2026
BT Renewal of VV Road to KeelaPudupalli Road in Pudupalli Panchayat Km 2/250 - 2/850
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat
Providing and laying Bituminious concrete to 30 mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Providing and laying gravel including cost and conveyance of gravel from approved sources to worksite and stocking on road side to departmental metric gauge for premeasurement as directed including labour for spreading and compacting etc., complete as per MORD specifications No. 400.
Provision for Name Board charges
Provision for Photographic charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.03 MB
BOQ_800361.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid