| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.3 LAccepted-AOC | ₹5.3 L | L1 | Accepted-AOC Lowest Amount Quoted |
| 2 | L2₹5.3 LRejected-Finance | ₹5.3 L | L2 | Rejected-Finance Higest Amount Quoted |
| Sl No | Description | Qty | Unit | MANIKANDAN(CHENDUR CONSTRUCTION) L1 | GOMATHI L2 |
|---|---|---|---|---|---|
| 1.00 | Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site, labour charges for mixing, laying, compacting and curing concrete etc., complete | 48.8 | Cum | 5,416 ₹2.6 L | 5,450 ₹2.7 L |
| 2.00 | Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete. | 30.45 | Cum | 365 ₹11,114.25 | 375 ₹11,418.75 |
| 3.00 | Cement Concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site, labour charges for mixing, laying, compacting and curing concrete etc., complete | 36.6 | Sqm | 6,805 ₹2.5 L | 6,810 ₹2.5 L |
| 4.00 | Providing Tar bad arrangements | 10.8 | Cum | 234 ₹2,527.20 | 250 ₹2,700 |
Tender Value
₹6.3 L
EMD Value
₹6,320
Closing Date
5 Jan 2026, 3:00 pmClosed
BDO (B.Pt.)
Panchayat Union, Manur.
CC Road
2025_RDTN_635784_1
A2/5647/2025
Open Tender
Civil Works - Roads
180 days
Manur
Refer tender doc
2 documents required · 2 mandatory
₹0
₹6,320
17 Jan 2026
24 Dec 2025
6 Jan 2026
24 Dec 2025
5 Jan 2026
24 Dec 2025
Amount
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site, labour charges for mixing, laying, compacting and curing concrete etc., complete
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
Cement Concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site, labour charges for mixing, laying, compacting and curing concrete etc., complete
Providing Tar bad arrangements
GOMATHI (BID ID -1552606)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.97 MB
BOQ_760870.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid