| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.7 LAccepted-Finance | ₹5.7 L | L1 | Accepted-Finance 1st Lowest |
| 2 | L2₹6.1 LRejected-Finance NARAYANPUR SANTIBON BLOCK J NEAR VIDYA SAGAR MATRI SADAN RAJARHAT GOPALPUR KOLKATA PIN 700136 | KOLKATA | 24 PARAGANAS NORTH | WEST BENGAL | 700136 | ₹6.1 L | L2 | Rejected-Finance 2nd Lowest |
| 3 | L3₹6.1 LRejected-Finance VILL P O JOYPUR P S KHARAGPUR DIST PASCHIM MEDINIPUR PIN 721301 | JOYPUR | PASCHIM MEDINIPUR | WEST BENGAL | 721301 | ₹6.1 L | L3 | Rejected-Finance 3rd Lowest |
| 4 | Rejected-Technical 10 NANDAVAN SOCIETY B H ADARSH HIGH SCHOOL PATAN GUJARAT 384265 UDYAM GJ 18 0000332 | PATAN | GUJARAT | 384265 | - | - | Rejected-Technical Mismatch Credential |
Tender Value
₹6.1 L
EMD Value
₹12,106
Closing Date
7 Jul 2026, 3:30 pmClosed
EE-II,LDCD
Office of the Executive Engineers Lower Damodar Construction Division Fuleswar, Uluberia, Howrah-711316
Renovation and Protection work of Three vent Uluberia Lock Gate along both bank of Medinipur Main Khal (Up stream ,Down stream) near SDO office and Lock Gate Para for a length of 120.00M in Uluberia Municipality, P.SUluberia, Ward No22, 23, Dist-How
2026_IWD_1029920_1
WBIW/EEII/LDCD/eNIT11/2026-27
Open Tender
CIVIL WORKS
Percentage
15 days
Uluberia
Please refer Tender documents.
6 documents required · 6 mandatory
₹12,106
14 Jul 2026
29 Jun 2026
8 Jul 2026
29 Jun 2026
7 Jul 2026
29 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes.
(i) Pakur Variety. | 45.56 | Cum | 6,864.18 | ₹3,12,732.04 |
| 2 | First class Brick work in cement sand mortar in steining of well, pier, abutment, wing wall, parapets cross drain. H.P. culverts, guard wall etc. including curing, scaffolding, raking out joints etc. complete including cost and carriage of all materials. | 6.75 | Cum | 6,525.25 | ₹44,045.44 |
| 3 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface (ii) With 1:4 cement mortar (a) 20 mm thick plaster | 354 | Sqm | 214.64 | ₹75,982.56 |
| 4 | Earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and
depositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge withina lead of,
NB :- Measurement to be taken on the basis of stack measurement / prepost work section measurement after deduction of void as per norms. No extra payment will be made for stacking.
i) Beyond 4.00 Km and upto5.00 Km | 300 | Cum | 371 | ₹1,11,300 |
| 5 | Supplying to site empty cement polythene bags (capacity 50kg) in good condition including stacking, incedental charges etc. all complete (capacity 50 kg). | 2,411 | Each. | 7.15 | ₹17,238.65 |
| 6 | Labour charges for filling empty cement gunny bag / polythene bag (capacity 50 kg) with all kinds of earth (wet or dry), sand or agreegates(stone / brick) and sewing as done in case of cement bags ,
( tying with a knot after filling willnot beaccepted ) , andstacking withina lead of 30 metre as per direction of Engr-in-charge (cost is excluding the cost of any types of filling materials).
NB:- Volume of earth/ sand filled bags should not be less than 0.028 cum/ bag. | - | Each Bag. | 8.34 | - |
| 7 | Dumping in position earth / sand filled gunny / poly bags (capacity 50 kg) within a lead of 30 metre inclusive of all lifts. | 2,411 | Each Bag. | 3.58 | ₹8,631.38 |
| 8 | Supply of different materials as per approved specification Bricks / Jhama / Bats sorted & stacked at site
(f) Brick Bats | 10.04 | Cum | 1,384.87 | ₹13,904.09 |
| 9 | Labour charge for dumping / laying of Laterite / Stone Boulders 25 kg & above / Shingles / Brick Bats, from stack of worksite with all leads and lifts in water or spreading the same on the slope of the bank of River/Sea or the slope of the embankment or in the River/ Sea bed to an uniform thickness as per direction of the Engineer-in-charge including cost of all accessories and other incidental charges.
(d) Brick Bats. | 10.04 | Cum | 135.87 | ₹1,364.13 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.19 MB
1.pdf
Additional Documents • 0.34 MB
Form2911.pdf
Tender Documents • 0.56 MB
BOQ_2529155.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].