Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹4.5 L
EMD Value
₹9,000
Closing Date
20 Jun 2022, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer REW Budgam
Rural Engineering Complex Budgamc
Construction of fencing around Graveyard at Ganie Mohalla Phase-ii halqa Drung
2022_RDPR_171550_9
NIT_NO_19 REW BUDGAM OF 2022-23
Open Tender
Civil Works
Item Rate
60 days
drung khag
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
Rural Development and Panchayati Raj
₹9,000
21 Jun 2022
31 May 2022
21 Jun 2022
31 May 2022
20 Jun 2022
31 May 2022
120 days
Amount
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed.All kinds of soil
Providing and laying of dry stone soling hand packed in horizontal including carriage by M/T avg lead of 05km
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
Centering and shuttering including strutting, propping etc. and removal of form work for Foundations, footings, bases for columns
Supplying at site Angle iron post & strut of required size including bottom to be split and bent at right angle in opposite direction for 10 cm lengthand drilling holes upto 10 mm dia. etc. complete.
Providing and fixing G.I. chain link fabric fencing of required width in mesh size 50x50 mm including strengthening with 2 mm dia wire or nuts,bolts and washers as required complete as per the direction of Engineer-incharge. Made of G.I. wire of dia 4 mm
Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer’s specifications including appropriate priming coat, preparation of surface, etc complete On steel work
Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc.complete.40 mm thick with 20 mm nominal size stone aggregate.
Carriage of Stone Aggregate from Source to Site of Work for 32Kms average
Carriage of Sand from Source to Site of Work for 47 Kms average
Provisions for Carriage of Cement,photograph signboard and other unforseen items
TAWSEEF AHMAD DAR
SARWAR HUSSAIN
FAHMEED AHMAD SHEIKH
ALTAF HUSSAIN MAGLOO
GULAM HASSAN KHAN
ANAYAT ALI KHAN
ABDUL QUYOOM DAR
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .