Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.0 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹2.1 L+₹2,205.22 (1.08%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹2.6 L+₹61,010.95 (30.0%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | Not Admitted-Fee/PreQual/Technical/Finance | - | Not Admitted-Fee/PreQual/Technical/Finance Others-Insufficient CDR amount. |
Tender Value
₹2.9 L
EMD Value
₹14,700
Closing Date
21 Sept 2026, 6:55 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE ENGINEER REW BUDGAM
RDD COMPLEX BUDGAM
Construction of Protection Bund from house of bashir shah to masjid shareef at khan mohallah soibugh B(w 2,3,4,6
2026_RDPR_323324_66
NIT_63_REW_Budgam_2026_27
Open Tender
Civil Works
Percentage
30 days
SOIBUGH
Please refer Tender documents.
3 documents required · 3 mandatory
₹200
EXECUTIVE ENGINEER REW BUDGAM
₹14,700
6 Nov 2026
3 Sept 2026
22 Sept 2026
3 Sept 2026
21 Sept 2026
3 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation in foundation trenchs/drains by manually including disposal of earth for an ave lead of 1m,lift upto 1.5m in all kinds of soils | 25.74 | Cum | 479.3 | ₹12,337.18 |
| 2 | Providing and laying of stone soling hand packed complete Job including by MT incl. plum. | 10.92 | Cum | 1,200 | ₹13,104 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) plum 20 % | 33.11 | Cum | 5,733.6 | ₹1,89,839.5 |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. | 118.8 | Sqm | 286.35 | ₹34,018.38 |
| 5 | Providing 12mm plaster in 1:4 mix ratio( 1cement:4 fine sand) | 88 | Sqm | 283.8 | ₹24,974.4 |
| 6 | Carraige of sand/aggregates from Source to Site. | 44.69 | cum | 409.94 | ₹18,320.22 |
| 7 | Add provisions for signboard, Photographes and other unforseen items. | 1 | job | 1,435 | ₹1,435 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.35 MB
BOQ_1087909.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .