The Block Development Officer (VP)
Panchayat Union, T.Palur
Construction of Kitchen Shed at Pudhupalayam PUE School in Sripuranthan Panchayat of T.Palur Block in Ariyalur District under AGAMT II 2022-23
2022_RDTN_260736_1
A5/3500/2021, Dated.01.11.2022
Open Tender
Civil Works
Works
90 days
Panchayat Union, T.Palur
As per Tender Document
4 documents required · 4 mandatory
₹0
₹7,000
19 Nov 2022
3 Nov 2022
15 Nov 2022
3 Nov 2022
15 Nov 2022
3 Nov 2022
Amount
Earthwork excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth
Filling in foundation with excavated erath in layers of not more than 15cm thick well rammed, watered and compacted complete complying with standard specification
Supplying and filling in foundation and basement with filling sand in layers not more than 15cm thick well rammed, watered and compacted complete complying with standard specification
Cement concrete 1:4:8 mix (one cement four sand and eight hard broken stone) using 40mm ISS HBG metal for foundation including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing, etc., complete as per standard specification
Reinforced Cement concrete 1:1.5:3 mix using 20mm ISS HBG metal from approved sources including cost and conveyance of all materials to work site and all labour charges for mixing, laying, and watering etc., complete. Upto basement
Reinforced Cement concrete 1:1.5:3 mix using 20mm ISS HBG metal from approved sources including cost and conveyance of all materials to work site and all labour charges for mixing, laying, and watering etc., complete. Above basement
Brickwork in Cement Mortar 1:5 mix using country bricks of standard size including cost and conveyance of all materials to work site and including all labour charges and all incidential charges etc., complete. Upto basement
Brickwork in Cement Mortar 1:5 mix using country bricks of standard size including cost and conveyance of all materials to work site and including all labour charges and all incidential charges etc., complete. For Superstrcture
Special ceiling plastering in Cement Mortar 1:3 mix, 10mm thick including cost and conveyance of all materials to work site and all labour charges etc., complete.
Plastering in Cement Mortar 1:5 mix, 12mm thick including cost and conveyance of all materials to work site and all labour charges etc., complete.
Painting the newly plastered wall surface with two coats of Exterior Emulsion over one coat of cement primer including clearing the surface in all floors etc., complete as per standard specification
Painting two coats over new iron works with ready mix paint of approved colour and trade including cost and conveyance of all materials and all other labour charges etc., complete.
Flooring with granolithic flooring to 25mm thick using cement concrete 1:2:4 mix using 20mm ISS Size HBG metal, including cost and conveyance of all materials to worksite and all labour charges etc., complete
Weathering course Concrete using best quality broken Brick jelly lime concrete using 20mm brick jelly with slacked lime in the ratio of 32:12.5 including cost and conveyance of all materials to site and all labour charges for mixing, laying and finishing, etc., complete
Finishing the top of roof with one course of pressed tiles of size 20x20x2cm with cement mortar 1:3 mix and pointed with the same oiled mortar including cost and conveyance of all materials to site and all labour charges etc., complete
Cost and Supply of Door of size 0.90x2.10m
Cost and Supply of Window of size 1.20x1.30m
Labour charges for fixing doors along with frames in position etc., complete
Labour charges for fixing windows along with frames in position etc., complete
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for RCC column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc., complete. (upto Ground level)
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for RCC column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc., complete (above Ground level).
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works
Supply of Cuddapah Stone of thickness 20/30 mm including cost and conveyance of all materials to work site including all labour for fixing etc., complete.
Supplying and fixing rain water PVC rain water down fall pipes of 4kg/cm2 variety of 110mm PVC Pipe including charges for fixing them in position with necessary shoes, bends, clamps, TW plugs, screws, nails etc., complete.
Supplying and fixing RCC Rings for RWH including cost and conveyance of RCC Rings to work site including all labour charges etc., complete.
Supplying and filling the RWH with brick jelly including cost and conveyance of brick jelly to work site including all labour charges etc., complete.
Wiring with 2x1.5 sq mm (22/0/3) PVC insulated Sc. Unsheathed cu. Conductor cable of 1100 V. Grade in Suitable PVC rigid pipe consealed on wall and ceiling with PVC accessories with TW switch box inflush with wall with 5A F.T switch, covered with hylum sheet of 3mm thick with painting of suitable colour, with continuous connection of 14 SWG TC wire with open PVC light/fan point (For electronic regulator)
Supply and fixing of CF lamp fitting including angle holder.
Supply and fixing of WT Bulk head fitting with guard (Philips / Bajaj / Crompton / K,lite) suitable for incandescent lamp with 60 W bulb. SD No. 84
Wiring with 2x1.5 sq mm (22/0/3) PVC insulated Sc. Unsheathed cu. Conductor cable of 1100 V. Grade in Suitable PVC rigid pipe on wall and ceiling with PVC accessories and with 150x100x113 mm T.W. switch box for 5 A 3 pin non interlocking CS plug with painting of suitable colour, with continuous connection of 14 SWG TC wire with open PVC Plug point
Supply and fixing of 16 Amps DP switch with metal clad of 500V with fuse and neutral (side handle) on suitable TW box with PWD earthing. (SD No.141)
Supply and run of 2 of 6 sq. mm (84/0.3) PVC insulated SC unsheathed Cu.Couductor of 1100 V grade on 7/20 GI bearer wire for service connection main (From building to service pipe) (SD No.66)
Supply and run of 2 of 6 sq. mm (84/0.3) PVC insulated SC unsheathed Cu.Couductor of 1100 V grade on 7/20 GI bearer wire for service connection main (From electric post to service pipe) (SD No.66)
Provision for Name board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for this work}
DURAIMARAN S
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .