Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.2 LAccepted-Finance GANRAPOTA BONGAON NORTH 24 PGS PIN 743251 | BONGAON | NORTH 24 PARGANAS | WEST BENGAL | 743251 | ₹14.2 L | L1 | Accepted-Finance Lowest Value. |
| 2 | L2₹14.5 LRejected-Finance 332 RABINDRASARANI BANKURA | BANKURA | BANKURA | WEST BENGAL | ₹14.5 L | L2 | Rejected-Finance Higher Value. |
| 3 | L3₹14.5 LRejected-Finance GHOSHPARA WARD NO 4 P O P S KALYANI DIST NADIA 741235 | KALYANI | NADIA | WEST BENGAL | 741235 | ₹14.5 L | L3 | Rejected-Finance Higher Value. |
Tender Value
₹14.2 L
EMD Value
₹28,340
Closing Date
27 Mar 2026, 6:00 pmClosed
Office of the Executive Engineer, Tamluk Division,
Office of the Executive Engineer,Tamluk Division, P.H.Engg. Dte.P.H.E. Complex 1st floor, Parbatipur,Tamluk, Purba Medinipur 721636
Operation and Maintenance of distribution system including rising main, FHTC, OHR deployment of man power, checking of status of supply in the command area, reparing of leakages, busting pipe line including round the clock watch ward to ensure su
2026_PHED_1019924_4
WBPHED/EE/TD/NIeT_17/2025-2026
Open Tender
CIVIL WORKS
365 days
Tamluk Block
Please refer Tender documents.
2 documents required · 2 mandatory
₹28,340
Office of the Executive Engineer,Tamluk Division,
25 May 2026
9 Mar 2026
30 Mar 2026
9 Mar 2026
27 Mar 2026
11 Mar 2026
11 Mar 2026
Operation and Maintenance of distribution system including rising main, FHTC, OHR & deployment of man power, checking of status of supply in the command area, reparing of leakages, busting pipe line including round the clock watch & ward to ensure supply of potable water through out the command area of the scheme in all respect and as per direction of EIC. (Payments of Valve Operators to be maid as per approved PHE rate) for (CI/DI/AC/UPVC/HDPE) of Kanpur Zone IV & its adjoining mouzas water supply scheme within Ramnagar II Block under Digha Sub Division of Tamluk Division, PHE Dte. Purba Medinipur. {For one(1) Year} .
Operation and Maintenance of distribution system including rising main, FHTC, OHR & deployment of man power, checking of status of supply in the command area, reparing of leakages, busting pipe line including round the clock watch & ward to ensure supply of potable water through out the command area of the scheme in all respect and as per direction of EIC. (Payments of Valve Operators to be maid as per approved PHE rate) for (CI/DI/AC/UPVC/HDPE) ofRamnagar Z V water supply scheme within Ramnagar II Block under Digha Sub Division of Tamluk Division, PHE Dte. Purba Medinipur. {For one(1) Year} .
Add GST @18% (CGST@9% + SGST@9%)
Add Cess@1%
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.64 MB
WBF2911.pdf
Tender Documents • 2.20 MB
BOQ_2506764.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid