Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹13.9 LAdmitted-Fee/PreQual/Technical/Finance | +2.99% | ₹13.9 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹14.9 L+₹94,738.53 (6.81%)Admitted-Fee/PreQual/Technical/Finance | +10.00% | ₹14.9 L+₹94,738.53 (6.81%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹13,515
Closing Date
23 Jul 2026, 5:00 pmClosed
Commissioner, Brahmapur Municipal Corporation
BRAHMAPUR, ODISHA, 760002
Re-Const of R.C.C drain at the back side of Badakhemundi street towards sana harijana sahi at W.N-23
2026_ORULB_134208_23
BeMC(BAM)/328/2026-27
Open Tender
Civil Works - Others
Percentage
90 days
BRAHMAPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,080
₹13,515
Yes
27 Jul 2026
9 Jul 2026
24 Jul 2026
9 Jul 2026
23 Jul 2026
9 Jul 2026
9 Jul 2026 - 18 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in F & P in Ordinary soil within initial lead of 50 m and initial lift of 1.5 m including rough dressing and breaking the clods, etc., all complete as per direction of Engineer-in-Charge. | 1 | Cum | 243.12 | ₹242.88 |
| 2 | Dismantling & removing cement concrete including the useful materials for reuse & removing the debris with in 50 mt lead. complete. | 10.13 | Cum | 836.28 | ₹8,467.34 |
| 3 | Supply and filling the F & P with filling sand of approved quality with well watered & rammed including cost, conveyance, royalty & all taxes, etc., complete. | - | Cum | 1,553.39 | - |
| 4 | CC(1:4:8) with 4cm size HG Hand Broken metal including hoisting , laying, curing and including all cost, conveyance, royalty & taxes, etc., complete. | 3.38 | Cum | 5,516.37 | ₹18,617.75 |
| 5 | R.C.C work of M-20 grade with 20mm & down grade BHG C/B chips including hoisting, laying & all cost, conveyance, royalty & taxes etc. comp. to work site as per the specification approved by the deptt. & direction of EIC.( Data for 15 cum) | 96.45 | Cum | 6,274.6 | ₹6,05,166.35 |
| 6 | Rigid & smooth centering & shuttering for R.C.C. and C.C. works including false works, dismantling and removing them from the site after casting, curing including cost of materials etc., complete. | 1 | sqmt | 1 | ₹1 |
| 7 | Supplying, fitting & placing uncoated HYSD reinforcement including cutting, bending,binding & placing the steel rods as per drawing & technical specifications with cost of binding wire 18 to 20 gauges, etc., complete. work.) | 0.8 | qntl | 9,253.15 | ₹7,402.52 |
| 8 | 6mm thick cement plester (1:4) to RCC surface finish smooth including closed deep chiping & slury treatment including all cost conveyance royalty and taxes etc. comp. | 285 | sqm | 214.74 | ₹61,200.9 |
| 9 | Conveyance of excavated earth by mechanical carriage from the site where it has been deposited after excavation & disposal of the same within 5km disatance at suitable locations as per the direction of E.I.C. etc. complete. | 99.23 | sqm | 276.01 | ₹27,387.09 |
stage.html
html • 0.02 MB
finance_600086.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.52 MB
DTCN1.pdf
Tender Documents • 1.60 MB
BOQ_600086.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .