Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹7.9 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹8.7 L+₹74,574.28 (9.43%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹8.7 L+₹79,965.19 (10.1%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹9.0 L+₹1.1 L (13.4%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹9.3 L+₹1.4 L (17.5%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
₹15.0 L
EMD Value
₹29,940
Closing Date
15 Apr 2026, 4:00 pmClosed
xenrew kathua
xenrew
Constt. of (15 KLD) Capacity Decentralized waste water treatment system (DEWATS) at village jagalpur near pond pyt Marheen
2026_RDPR_307456_1
e-NIT No.03/REW/K of 2026-27 Dated 07/04/2026
Open Tender
Civil Works
Percentage
180 days
marheen
sbd
2 documents required · 2 mandatory
₹500
Rural Development and Panchayati Raj
₹29,940
22 Apr 2026
7 Apr 2026
16 Apr 2026
7 Apr 2026
15 Apr 2026
7 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas(exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : | - | m3 | - | - |
| - | Dumping stone inluding cost of stones.in Horizontal on level | - | m3 | - | - |
| - | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size). | - | m3 | - | - |
| - | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | - | m3 | - | - |
| - | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level- Thermo-Mechanically Treated bars of grade Fe-500D or more. | - | kg | - | - |
| - | 12mm Cement plaster finished with a floating coat of neat cement of mix: Cement mortar 1:4 (1cement, 4sand) | - | m2 | - | - |
| - | Centering and shuttering including strutting, propping etc. and removal of form for:Foundations, footings, bases of columns etc. for mass concrete. | - | m2 | - | - |
| - | Centering and shuttering including strutting, propping etc. and removal of form for: Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. | - | m2 | - | - |
| - | Centering and shuttering including strutting, propping etc. and removal of form for: Suspended floors, roofs, landings, balconies and access platforms. | - | m2 | - | - |
| - | Centering and shuttering including strutting, propping etc. and removal of form for:- Edges of slabs and breaks in floors and walls- Under 20 cm wide. | - | m2 | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 7.95 MB
BOQ_997443.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .