| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.9 LAdmitted-Fee/PreQual/Technical/Finance | -36.30% | ₹1.9 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L1₹1.9 LAdmitted-Fee/PreQual/Technical/Finance | -36.30% | ₹1.9 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L2₹2.0 L+₹18,351.47 (9.89%)Admitted-Fee/PreQual/Technical/Finance | -30.00% | ₹2.0 L+₹18,351.47 (9.89%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L2₹2.0 L+₹18,351.47 (9.89%)Admitted-Fee/PreQual/Technical/Finance | -30.00% | ₹2.0 L+₹18,351.47 (9.89%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-Analysis as per NIT not Uploaded |
Tender Value
₹2.9 L
Closing Date
12 Aug 2026, 6:00 pmClosed
EXECUTIVE ENGINEER REW SPN
EXECUTIVE ENGINEER REW SPN
C/O TILE LANE WITH PARK AT GOVT HIGH SCHOOL BATFOGEN AT CHOWAN
2026_RDPR_319596_13
Nit 070 of 2026-27
Open Tender
Civil Works
Percentage
Shopian
Please refer Tender documents.
4 documents required · 4 mandatory
₹200
Rural Development and Panchayati Raj
Exempted
16 Sept 2026
5 Aug 2026
13 Aug 2026
5 Aug 2026
12 Aug 2026
5 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1surface dressing of the ground including the removal of vegitation | |||||
| 0.0 | Supply and Placing of Stone Soling hand packed tightly in bed including levelling & ramming and carriage. | - | Cum | - | - |
| 3Provifding and laying in position cement concrete for specified grade including curing but excluding the cost of centring and Shuttering. (1:3:6 1: cement 3: coarse sand : 6 graded stone aggegrate ) 20mm nominal size. crusher | |||||
| 0.0 | Providing and laying 50mm thick factory made cement concrete interlocking paver block made by block making machine with strong vibratory compaction and of approved size and design/shape laid in required colour and pattern over and including 50mm thick compacted bed of fine sand, filling the joints with coarse sand etc. all complete as per direction of Engineer-in-charge. | - | sqm | - | - |
| 0.0 | Centering and shuttering incl. strutting propping etc including removal of formwork, all carriages complete (Foundations, footings, bases of columns etc. for mass concrete) | - | sqm | - | - |
| 0.0 | Excavating, supplying and filling of local earth (including royalty)by mechanical transport upto a lead of 5 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. | 1 | Cum | - | - |
| 0.0 | Provision for signboard & photographs,unforeseen item | - | JOB | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.11 MB
BOQ_1059181.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .