Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹6.5 LAccepted-Finance | 1 | Accepted-Finance SATISFIED | |
| 2 | 2₹8.3 L+₹1.8 L (28.0%)Accepted-Finance | 2 | Accepted-Finance SATISFIED |
Tender Value
₹12.8 L
EMD Value
₹12,800
Closing Date
24 Aug 2020, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE/M-II/MTPS-I
Superintending Engineer Mechanical-II Mettur Thermal Power Station-I Mettur Dam- 636406 Salem District
MTPS I CHP I Attending Routine and minor break down maintenance in conveyor 8A1 8B1 for a period of 120 days
2020_EB_174916_1
SE M II MTPS I CHP I OT 62 2020 2021
Open Tender
Miscellaneous Works
Works
120 days
MTPS-I
As per Tender Specification
6 documents required · 6 mandatory
₹0
₹12,800
Yes
29 Aug 2020
7 Aug 2020
25 Aug 2020
7 Aug 2020
24 Aug 2020
7 Aug 2020
180 days
Amount
Charges for cleaning of spillage coal in conveyor 8A1 & 8B1 which includes walkway, decking sheet, stair cases take up tower and floors. Replacement of worn out idlers of return, carrying, impact idlers and its stands, holding down pulley including changing of plummer block with bearings if required (plummer block & bearing supplied by Board) Cleaning all equipments like gear box, pulley plummer blocks, fluid coupling and clearing the IMS & SMS scraps etc.
Charges for checking of oil level, oil topping in gear box, inspection and cleaning of breather in gear box of conveyor 8A1 & 8B1. Grease filling of auto lubrication system checking of oil level and oil topping in fluid coupling, checking of tightness of bolts & nuts, checking and adjusting scrapper and skirt rubber and replacement of scrapper and skirt rubber if necessary in conveyor 8A1 & 8B1.
Charges for removing coal choke accumulated in conveyor 8A1 & 8B1 discharge chutes, loading the accumulated coal into nearby running conveyors and operation of sprinkler system including cleaning of nozzle and valves, including cost of T&P’s and consumables.
Charges for fabrication and welding of skirt board mother plate & divider plates in the chutes of conveyor 8A1 & 8B1 including cost of consumables and charges for material drawal / devolution at central stores.
K R CONTRACT
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .