| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹56.4 LAccepted-AOC | ₹56.4 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹56.6 LRejected-AOC | ₹56.6 L | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | L.Kishore Kumar | LCR AND SONS |
|---|---|---|---|---|---|
| 1.00 | Dismantling exisisting PCC Concrete including dismantling,clearing away and carefully stacking materials useful for re-use for any thickness of walls etc complete as per standard specification | 116.14 | M3 | 56,444.04 ₹66,603.97 | 56,908.6 ₹67,152.15 |
| 2.00 | Dismantling RCC by manual / by using deploying machineries including dismantling,clearing away and carefully stacking materials useful for re-use for any thickness of walls etc complete as per standard specification | 11.48 | M3 | 5,579.28 ₹6,583.55 | 5,625.2 ₹6,637.74 |
| 3.00 | Earth work open excavation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the excavated earth with a lead of 10 mts. within the compound in places shown by the departmental officers and clearing and levelling the site, etc., complete complying with standard specification. | 753.03 | M3 | 1,27,262.07 ₹1.5 L | 1,28,015.1 ₹1.5 L |
| 4.00 | Supplying and filling the foundation and basement with stone dust in layers of not more than 15cm thick well rammed watered and compacted etc., complete complying with standard specification. | 62.82 | M3 | 19,348.56 ₹22,831.30 | 19,474.2 ₹22,979.56 |
| 5.00 | Plain Cement Concrete 1:4:8 (One Cement, Four sand and Eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification | 93.43 | M3 | 5,02,840.26 ₹5.9 L | 5,03,120.55 ₹5.9 L |
| 6.00Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid) | |||||
| 6.01 | For Culvert | 1,323.02 | M2 | 7,12,313.97 ₹8.4 L | 7,14,430.8 ₹8.4 L |
| 6.02 | For Slab | 425.1 | M2 | 1,79,392.2 ₹2.1 L | 1,80,667.5 ₹2.1 L |
| 7.00 | Plain Cement Concrete 1:2:4 (one cement, two sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers. | 215.12 | M3 | 14,53,135.6 ₹17.1 L | 14,54,211.2 ₹17.2 L |
| 8.00 | Plastering with cement mortar 1:5 (One part of Cement and Five part of Plastering Sand (P- Sand)) 12mm, thick in all floors including cost and conveyance of all materilas to site and labour charges etc,complete as per standard specifications | 306.63 | M2 | 88,616.07 ₹1.0 L | 88,922.7 ₹1.0 L |
Tender Value
₹57.1 L
EMD Value
₹57,100
Closing Date
28 Mar 2025, 3:00 pmClosed
The Commissioner ,Tambaram Corporation
No.01,Kalaivani Street , Rajakilpakkam,Chennai -73
Construction of SWD and Culvert to Navaneetham Nagar Main Road and 4th street in Ward No.39
2025_DMA_535027_9
003/2024/E1
Open Tender
Civil Works
90 days
Tambaram CIty Municipal Corporation, Zone -3
Construction of SWD and Culvert to Navaneetham Nagar Main Road and 4th street in Ward No.39
2 documents required · 2 mandatory
₹0
₹57,100
24 Dec 2025
24 Mar 2025
28 Mar 2025
24 Mar 2025
28 Mar 2025
24 Mar 2025
Dismantling exisisting PCC Concrete including dismantling,clearing away and carefully stacking materials useful for re-use for any thickness of walls etc complete as per standard specification
Dismantling RCC by manual / by using deploying machineries including dismantling,clearing away and carefully stacking materials useful for re-use for any thickness of walls etc complete as per standard specification
Earth work open excavation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the excavated earth with a lead of 10 mts. within the compound in places shown by the departmental officers and clearing and levelling the site, etc., complete complying with standard specification.
Supplying and filling the foundation and basement with stone dust in layers of not more than 15cm thick well rammed watered and compacted etc., complete complying with standard specification.
Plain Cement Concrete 1:4:8 (One Cement, Four sand and Eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification
Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid)
For Culvert
For Slab
Plain Cement Concrete 1:2:4 (one cement, two sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.
Plastering with cement mortar 1:5 (One part of Cement and Five part of Plastering Sand (P- Sand)) 12mm, thick in all floors including cost and conveyance of all materilas to site and labour charges etc,complete as per standard specifications
Providing and laying in position Standardised Concrete Mix M-20 Grade in accordance with IS 456 - 2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement contenet of 325Kg/ cum and maximum water cement ratio of 0.55 including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS 9103 to accelerate, related setting of concrete, improve workability without imparing strength and durability with about (5.0cum), 7730Kg of 20mm machine crushed stone jelly and with about (3.3 cum), 5156kg of 10 - 12mm machine crushed stone jelly and with about (4.79cum) 7670 kg of Crushed Stone Sand (M- Sand), but excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary without claiming extra cost etc., complete complying with standard specification and as directed by the departmental officers -
Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors as per standard specification.
Supplying and fixing in position C.I.Manhole covers (light or heavy duty) of 60 X 60cm in size in Cement Mortar 1:3 (One part of Cement and Three part of Plastering Sand (P- Sand)), of best approved quality and as per standard specifications etc.,complete.
Removal of excess excavated earth minimum 2Km lead including all cost and conveyance of all materials and all other labour charges etc., complete.
Supply ,Delivery and Fixing Of 110mm PVC Pipe of work Pressure 6kg/cm2
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_636837.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid