Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹3.5 L
Closing Date
19 Aug 2026, 2:00 pm
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
66 days
Expenditure
Capital (WMS)
13 conditions · 2 needing a document upload
Financial Eligibility Criteria: Dispensed as per Railway Board's letter no. 2019/Elect(G)/165/1 dated 22.04.2020.
Technical Eligibility Criteria: Dispensed as per Railway Board's letter no. 2019/Elect(G)/165/1 dated 22.04.2020.
99 conditions · 8 needing a document upload
Contractor must ensure that all documents as per Check list attached in Document Section has been uploaded and complied in accordance to GCC or not, if applicable and the same should be uploaded along with the Offer duly signed by the bidder.
BOOK OF REFERENCE: General Conditions of Contract, 2022, hereinafter mentioned as GCC 2022, of Indian Railways. There will be an overall binding of Indian Railways; General Conditions of Contract, 2022; hereinafter or elsewhere mentioned as GCC, 2022 amended/revised/ modified/corrected from time to time, irrespective of before or after opening of this e-tender, upon the tender or contract.
The works are required to be completed within the specified period in NIT HEADER from the date of issue of acceptance letter.
Electronic tender box will be opened after the closing time as shown in the NIT/IREPS website, as per procedure. Tenderers shall not be required to be present in the Office of Dy. Chief Electrical Engineer (W)/Liluah for any e- Tender opening process. They can obtain totally transparent Bid Tabulation Statement by logging in IREPS website after tender opening. All the participating tenderers who will submit valid e- Tender offer can view their own offer details as well as tender tabulation statement after tender opening from any location using internet access by visiting the website: www.ireps.gov.in instantly after opening of the electronic tender box, by clicking on the icon. Railways do not guarantee opening of the tender on or after the specified date and time due to reasons beyond control of the Railway Administration. Hence the e-Tender can be opened after the specified due date and time also. It will, however, be ensured that no offer is submitted after the specified date and time for the subject e- Tender. Tenderers cannot submit/modify any offer or attach any file to it after the closing date and time as stipulated in the e-Tender Notice. IREPS does not permit any alteration, modification, deletion of any entry or condition offered by the tenderer in the e- Tender, after closure of the electronic tender box.
Right of Railway to Deal with Tenders: (i) The Railway reserves the right of not to invite tenders for any of Railway work or works or to invite open or limited tenders and when tenders are called to accept a tender in whole or in part or reject any tender or all tenders without assigning reasons for any such action. In case if tender is accepted in part by Railway administration, Letter of Acceptance shall be issued as counter offer to the Tenderer, which shall be subject to acceptance by the Tenderer. (ii) The authority for the acceptance of the tender will rest with the Railway. It shall not be obligatory on the said authority to accept the lowest tender or any other tender, and tenderer(s) shall neither demand any explanation for the cause of rejection of his/ their tender nor the Railway to assign reasons for declining to consider or reject any particular tender or tenders. (iii) The Railway reserves the right to verify all statements, information and documents submitted by the bidder in his tender offer, and the bidder shall, when so required by the Railway, make available all such information, evidence and documents as may be necessary for such verification. Any such verification or lack of such verification, by the Railway shall not relieve the bidder of its obligations or liabilities hereunder nor will it affect any rights of the Railway there under. (iv) If the tenders deliberately give/gives wrong information in his /their tender or create /creates circumstances for the acceptance / his/ their tender, the Railways reserves the rights to reject such tender at any stage. (v) In case of any information submitted by tenderer is found to be false, forged or incorrect at any time during process for evaluation of tenders, it shall lead to forfeiture of the tender Bid Security besides banning of business for a period of upto two years. (vi) In case of any information submitted by tenderer is found to be false, forged or incorrect after the award of contract, the contract shall be terminated. Bid Security, Performance Guarantee and Security Deposit available with the railway shall be forfeited. In addition, other dues of the contractor, if any, under this contract shall be forfeited and agency shall be banned for doing business for a period of upto two years.
Vide Railway Board's letter No. 2018/E(LL)/AT/CNR/3 dated 24.01.2018, every contractor must abide by and ensure compliance to statutory provisions of applicable Labour Laws and various Labour Legislations, as applicable, when they are engaging workmen for execution of Works Contracts awarded by Railways. Details of the above are clearly mentioned in the said letter of Railway Board; copy of which can be seen in the Document Section of this Tender. 'Successful Bidder/tenderer' or 'Contractor' shall have to submit an Undertaking stating that they shall abide by the above instructions meticulously, to pay the Minimum Wages and others facilities as per provisions of the above Labour Legislations/Laws; and in case of any deviation/noncompliance in respect of above laws/legislations; or any complaint is received to that effect, the Contractor will be solely responsible and Railway will take up necessary punitive/penal proceedings under relevant laws against the default/accused Contractor in consultation with Labour Authorities and black list them nationally. All bidders are once again advised to take a serious note of these issues and follow the instruction laid in the said letter of Railway Board thoroughly, both in letter and spirit. Copy of the said latter of Railway Board is furnished at the Document Section.
The contractor shall make his own arrangement for the accommodations of his staff, materials; tools , uniform etc, Electricity for the purpose of the execution of work against this contract may be arranged by Railway.
Dress Code: The Tenderer must ensure that their staffs always ware uniform such as Shirt, Trouser, Light Blue Color Fluorescent Jacket, helmet, Gloves, and Industrial Boot. No contractual staff should allow to do work without this uniform. Laminated photo identity card with photo to be available with every contractual staff at all time.
The Tenderer/Contractor will have to accept and opt to take payment from Railway through a Letter of Credit (LC) arrangement, Modalities of the same will be as per Director Finance/CCA, Railway Board letter No. 2017/AC II/9/10 Pt. I dated 20.02.2018 (RBA No. 10/2018), 2017/AC II/9/10 Pt. 3 dated 09.05.2018 (RBA No. 48/2018)and 2018/CE-I/CT/9 dated 04.06.2018, ; copies of which are available in the Document Section of this Tender. However, this is subject to the required system has already been finalised and become operative by the concerned Accounts Department of Railway at any point of time. Therefore, the Tenderer has to agree in this respect and exercise his/her/their Option to this effect as per format available in the Document Section.
Tenderers Credentials: Documents testifying tenderers previous experience and financial status should be uploaded along with the tender or produced when desired by competent authority of the Railway. Tenderer(s) should submit his/their offer along with his / their credentials to establish: (i) His capacity to carry out the works satisfactorily. (ii) His financial status supported by Bank reference and other documents. (iii) Certificates duly attested and testimonials regarding contracting experience for the type of job for which tender is invited with list of works carried out in the past.
Provisions of Employees Provident Fund and Miscellaneous Provisions Act, 1952:
Contractor / tenderer shall have to be registered under EPF/ESI in terms of employees Provident fund and Miscellaneous Provision Act, 1952
Contractor/ tenderer shall have to fo llo w all the stipulations regarding applicability of the Contract Labour (Regulation & Abolition ) Act , 1970/ Rules, 1950.
Contractor / Tenderer shall have to follow all the precautionary measures for safety of the workers in terms of West Bengal Factory Rules,1958.
The tenderer shall have sound financial capability to undertake the job successfully.
Banker's certificate mentioning details of current account shall be submitted.
The tenderer shall income tax, PAN on the name of agency or the proprietor as the case may be.
There shall be an overall binding of GCC, 2022.
Tenderer must download, duly sign, scan and upload the Tender Document and all other Documents available in the Document Section except General Condition of Contract (GCC), in PDF form.
The contractor has to provide ID Cards which are to be countersigned by Competent Authority of the Jheel Siding Depot for the staffs working under them.
SAFETY MEASURES: The contractor shall take all precautionary measures in order to ensure the protection of his own personal moving about or work in the Railway premises, but shall then conform to the rules and regulations of the railways. The contractor shall abide by all Railway regulations in force for the time being and ensure that the same are followed by his representatives, agent or sub-contractor of work men. He shall give due notice to his employees and workers about the provisions of the para. The contractor shall indemnify and keep the Railway administration indemnified and harmless against all actions, suits, claims, demands, other charges or expenses arising in connection with any accident, death or injury sustained by any person (s) within the Railway premises and any loss or damage to Railway property sustained, due to the acts or omissions of the contractor, or his staff during the execution of this contract irrespective of whether such liability arising under the workmen compensation Act 1923 or any other stature in force for the time being.
Tenderer have to cautious regarding the engagement of Labour about the subject work.As per Railway Board letter NO: 2019/sec.(Int.)/51/7/2-23 New Delhi,dt: 16.08.2020 & IGCum-PCSC/RPF/ER's letter no. SC.20/43/45/Order Circular/2021 dt:23.08.2021,Contractor should not engage any Bangladeshi,Rohingyas or any other foreigner in India as a worker during the exccution of work. If any worker found during the execution of work, the contractor will solely be responsible and action will be taken as per extent rule.
It is responsibility of the tenderer that they ensure to see any corrigendum of the tender to check the corrigendum on the website from time to time.
The Tenderer will have to upload necessary authenticated and proper document in respect of the above, along with Tender Offer; to comply the respective condition of GCC, 2022 or latest to its last amendment in respect of Nature of the firm: Sole proprietorship firm, or, Partnership Firm, or Joint Venture Firm, or Company registered under Companies Act 1956, or a Society. In this regard, Railway Board letter No. 2013/CE-I/CT/O/33/SI (FTS-89623) dated 11.10.2014 may be referred to, which is furnished in the Document Section.
System of Verification of Tenderers Credential:
In all works tender documents, following para may be added in the section describing the qualification and eligibility criteria. "The tenderers shall submit a self- declaration stating that they are not liable to be disqualified and all their statements/documents submitted along with bid are true and factual. Standard format of the Self-Declaration to be submitted by the bidder is enclosed in the Document Section. Non submission of an Self-declaration by the bidder shall result in summary rejection of his/their bid. And It shall be mandatorily incumbent upon the tenderer to identify, state and submit the supporting documents duly self-attested by which they/he is qualifying the Qualifying Criteria mentioned in the Tender Document. It will not be obligatory on the part of Tender Committee to scrutinize beyond the submitted document of tenderer as far as his qualification for the tender is concerned." With the submission of the self- declaration as mentioned above, the practice of verification of tenderer's documents by the Railways may be dispensed with. Following clause may also be added to the Instructions to Bidders.
Repair / Overhauling of Knorr Bremse make Air Dryer Unit - 12 nos., Auxiliary Air Compressor - 12 nos. and Main Air Compressor - 12 nos. of Vande Bharat Train (TS rake) from OEM on single tender basis at C & W Workshop, Eastern Railway, Liluah.
W_LLH_Contract_P1714_ST
W_LLH_Contract_P1714_ST
Single
Works - General
12 Months
Howrah, West Bengal
₹0
₹3.5 L
28 Jul 2026
28 Jul 2026
5 Aug 2026
9 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 1,77,09,036.24 | ||
| — | 12.00 | — | — | ||
| Repair / Overhauling work of Air Dryer Unit with replacement of Must Change Items kit. (Details of description of items with quantity is as per Annexure-'A'). | — | — | — | 22,06,128 | |
| — | 12.00 | — | — | ||
| Repair / Overhauling work of Auxiliary Air Compressor with replacement of Must Change Items kit. (Details of description of items with quantity is as per Annexure-'B') | — | — | — | 30,78,384 | |
| — | 12.00 | — | — | ||
| Repair / Overhauling work of Main Air Compressor with replacement of Must Change Items kit. (Details of description of items with quantity is as per Annexure-'C'). | — | — | — | 88,13,184 | |
| — | 12.00 | — | — | ||
| Condition-based parts during overhauling of Air Dryer Unit - 05 nos., Auxiliary Air Compressor - 05 nos. and Main Air Compressor - 05 nos. (An aggregate cost of @ 5% of Total cost of Condition based parts of Air Dryer Unit (Annexure-A1), Auxiliary Air Compressor (Annexure - B1) and Main Air Compressor (Annexure - C1) considered as a set for Lump sum amount for replacement as and when rerquired). | — | — | — | 36,11,340.24 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
AnnexureV.pdf
ATTACHMENT
RBA_10_21022018.pdf
ATTACHMENT
RBA__48_09052018.pdf
ATTACHMENT
GCCApril-2022.pdf
ATTACHMENT
CommercialCompliance2022.pdf
ATTACHMENT
GeneralCompliance2022.pdf
ATTACHMENT
Undertaking2022.pdf
ATTACHMENT
TenderForm.pdf
ATTACHMENT
OnlinePoliceVerification.pdf
ATTACHMENT
VerificationofContractualStaff.pdf
ATTACHMENT
ConservencyCharges07-09-2021.pdf
ATTACHMENT
2018_CE-I_CT_9Date04_06_2018LetterofCredit.pdf
ATTACHMENT
BankGuaranteeBondAnnexure-VIA.pdf
ATTACHMENT
RBE_20_18.02.2020LabourLaws.pdf
ATTACHMENT
LabourDataShramikKalyanPortal17.10.2018.pdf
ATTACHMENT
InsuranceSuretyBondDated.09.01.2025inGCC.pdf
ATTACHMENT
AdvanceCorrectionSlip1to10toGCCcombined_compressed.pdf
ATTACHMENT
2026_03_13IndianRailwaysStandardGeneralConditionsofContractApril2022AdvanceCorrectionSlipNo_111-compressed.pdf
ATTACHMENT
checklist.pdf
ATTACHMENT
Annexure-A.pdf
ATTACHMENT
Annexure-B.pdf
ATTACHMENT
Annexure-C.pdf
ATTACHMENT
Annexure-A1.pdf
ATTACHMENT
Annexure-B1.pdf
ATTACHMENT
Annexure-C1.pdf
ATTACHMENT
Deployementofqualifiedengineer.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].