| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.2 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹12.5 L+₹31,882 (2.62%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹12.6 L+₹40,550 (3.33%)Admitted-Finance | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Goel Tredars L1 | Athrva Enterprises L3 | Divakar Enterprises L2 |
|---|---|---|---|---|---|---|
| 1.00Protection work to reduce the damage rate of 11/0.4 kV distribution transformers The work of delivering following material from the Departmental store center to the site in which includes loading and unloading on both sides. (distance 0 to 50 km) | ||||||
| 1.01 | 11 KV FUSE SET | 155 | NO | 360 ₹55,800 | 350 ₹54,250 | 345 ₹53,475 Lowest |
| 1.02 | EARTHING ROD COMPLETE | 185 | NO | 50 ₹9,250 | 50 ₹9,250 | 49 ₹9,065 Lowest |
| 1.03 | LT PVC CABLE 1x35 Sqmm | 3,200 | Mtr. | 7 ₹22,400 Lowest | 8 ₹25,600 | 8 ₹25,600 |
| 1.04 | LT PVC CABLE 1x120 Sqmm | 4,000 | Mtr. | 7 ₹28,000 Lowest | 8 ₹32,000 | 8 ₹32,000 |
| 2.00Complete work of installing the electrical material received from the store center at the site. | ||||||
| 2.01 | Complete work of installation and commissioning of 11 KV FUSE SET on 11/0.4 KV 25 KVA, 63 KVA & 100 KVA Distribution Transformer installed at Various Site. as per RESPO standards. Decentralized materials will be provide by the contractor / Firm. | 155 | NO | 550 ₹85,250 | 500 ₹77,500 | 495 ₹76,725 Lowest |
| 2.02 | Complete work of Earthing complete by establishing earthing road of Stablished Single Pole/Double Pole as per RESPO standards. In which decentralized material will be provide by the Contractor/Firm. | 185 | NO | 250 ₹46,250 Lowest | 300 ₹55,500 | 295 ₹54,575 |
| 2.03 | Complete work of Replacing Damaged / Jar-Jar Cables of Established 11/0.4 KV 25 KVA Distribution Transformer at Various Site with LT PVC CABLE 1x35 Sqmm. as per RESPO standards. In which necessary Decentralized materials will be provide by the contractor / Firm. 40 Mtr. Per D.T. Transformer | 80 | NO | 20 ₹1,600 Lowest | 25 ₹2,000 | 25 ₹2,000 |
| 2.04 | Complete work of Replacing Damaged / Jar-Jar Cables of Established 11/0.4 KV 63 KVA & 100 KVA Distribution Transformer at Various Site with LT PVC CABLE 1x120 Sqmm. as per RESPO standards. In which necessary Decentralized materials will be provide by the contractor / Firm. 40 Mtr. Per D.T. Transformer | 100 | NO | 20 ₹2,000 Lowest | 25 ₹2,500 | 25 ₹2,500 |
Tender Value
₹13.0 L
EMD Value
₹13,000
Closing Date
22 Sept 2025, 12:00 pmClosed
SE EDC I MZN
H NO 60/168 LAXMAN VIHAR KAMBALWALA BAGH MUZAFFARNAGAR
Protection work to reduce the damage rate of 11 0.4 kV distribution transformers installed at the Various site AND Other work UNDER BUSINESS PLAN 2025-26
2025_PVVNL_1072315_1
01/2025-26/EDC-I MZN
Open Tender
Electrical Works
Lump-sum
UNDER THE AREA OF EDD CHARTHAWAL MZN
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
SE EDC I MZN
₹13,000
9 Oct 2025
8 Sept 2025
22 Sept 2025
8 Sept 2025
22 Sept 2025
8 Sept 2025
Amount
Protection work to reduce the damage rate of 11/0.4 kV distribution transformers The work of delivering following material from the Departmental store center to the site in which includes loading and unloading on both sides. (distance 0 to 50 km)
11 KV FUSE SET
EARTHING ROD COMPLETE
LT PVC CABLE 1x35 Sqmm
LT PVC CABLE 1x120 Sqmm
Complete work of installing the electrical material received from the store center at the site.
Complete work of installation and commissioning of 11 KV FUSE SET on 11/0.4 KV 25 KVA, 63 KVA & 100 KVA Distribution Transformer installed at Various Site. as per RESPO standards. Decentralized materials will be provide by the contractor / Firm.
Complete work of Earthing complete by establishing earthing road of Stablished Single Pole/Double Pole as per RESPO standards. In which decentralized material will be provide by the Contractor/Firm.
Complete work of Replacing Damaged / Jar-Jar Cables of Established 11/0.4 KV 25 KVA Distribution Transformer at Various Site with LT PVC CABLE 1x35 Sqmm. as per RESPO standards. In which necessary Decentralized materials will be provide by the contractor / Firm. 40 Mtr. Per D.T. Transformer
Complete work of Replacing Damaged / Jar-Jar Cables of Established 11/0.4 KV 63 KVA & 100 KVA Distribution Transformer at Various Site with LT PVC CABLE 1x120 Sqmm. as per RESPO standards. In which necessary Decentralized materials will be provide by the contractor / Firm. 40 Mtr. Per D.T. Transformer
Complete work of Replacing Damage Al. Lugs Established 11/0.4 KV 25 KVA, 63 KVA & 100 KVA Distribution Transformer, at Various Site, as per RESPO standards. In which necessary Decentralized materials will be provide by the contractor / Firm. 4 no. Lugs Per D.T. Transformer
Complete work of Replacing Damage / Jar-Jar Copper Fuse Wire HT/LT Both Side as per Requirnment as per Site at Established 11/0.4 KV 25 KVA, 63 KVA & 100 KVA Distribution Transformer installed Various Site, as per RESPO standards. In which necessary Decentralized materials will be provide by the contractor / Firm. Approximate 120 Gram Per D.T. Transformer Both Side
Complete work of Pole concreting on established Single Pole / Double Pole as per RESPO standards. In which cement, sand and other necessary decentralized material will be provide by the Contractor/Firm.
Supply of Alluminium Lugs all Sizes required as per site.
Supply of Fuse Wire (Copper) all SWG size Like(40 SWG, 37 SWG & 34 SWG) required as per site.
Supply of Sundries all Decentralized item required as per site. Like- Clamp with Nut & Bolts All Types, Breather, Silica Gel, ETC. Required as per Site.
Complete work of installing the electrical material received from the store center at the site.
LT Cable Old & Used / Damage
Substation Protection work The work of delivering following material from the Departmental store center to the site in which includes loading and unloading on both sides. (distance 0 to 50 km)
33 KV Line Isolator
33 KV Lightning Arrestor
33 KV CT 200/100/1A
Complete work of installing the electrical material received from the store center at the site.
Complete work of Removal of Old/Damage & installation and commissioning of 33 KV Line Isolator at 33/11 KV Substation Sandhawali 1no. & Nirmana 01no., as per RESPO standards. All Decentralized materials will be provide by the contractor / Firm.
Complete work of Removal of Old/Damage & installation and commissioning of 33 KV Lightning Arrestor at 33/11 KV Substation Sohjani Tagan 6no. & Sandhawali 6no., as per RESPO standards. All Decentralized materials will be provide by the contractor / Firm.
Complete work of Removal of Old/Damage & installation and commissioning of 33 KV CT 200/100/1A at 33/11 KV Nirmana, as per RESPO standards. All Decentralized materials will be provide by the contractor / Firm.
Complete work of Pipe Earthing (upto Water Level) Various Equipment installed at 33/11 KV Sub-station Sandhawali as per RESPO standards. All Decentralized materials will be provide by the contractor / Firm.
Complete work of installing the electrical material received from the store center at the site.
33 KV Line Isolator Damage/Scrap
33 KV Lightning Arrestor Damage/Scrap
33 KV CT Damage/Scrap
Providing & Fixing for various 33/11 KV Substation Protection work
Providing of W.T.I. (Winding Temperature Indicator) & Complete Installing and Commissioning established Power Transformer at Various 33/11 KV Substations with Replace Burnt Wire & Repair W.T.I. Box as per RESPO norms. In which all necessary Decentralized materials will be provide by the contractor / Firm.
Providing of O.T.I. (OIL Temperature Indicator) & Complete Installing and Commissioning established Power Transformer at Various 33/11 KV Substations with Replace Burnt Wire & Repair O.T.I. Box as per RESPO norms. In which all necessary Decentralized materials will be provide by the contractor / Firm.
Providing of 33 KV Master Relay & Complete Installing and Commissioning, 33 KV Feeder at Various 33/11 KV Substations as per RESPO norms. In which all necessary Decentralized materials will be provide by the contractor / Firm.
Providing of OC/EF Main Relay & Complete Installing and Commissioning, 11 KV Feeder at 33/11 KV Substations as per RESPO norms. In which all necessary Decentralized materials will be provide by the contractor / Firm.
Divakar Enterprises (BID ID -5549813)
Athrva Enterprises (BID ID -5535097)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .