Tender Value
Refer Docs
Closing Date
12 Feb 2022, 4:30 pmClosed
Er V K Gupta
EXECUTIVE ENGINEER REW DIVISION RAMBAN
as per NIT
2022_RDPR_159387_8
e NIT 62 of REW Ramban
Open Limited
Civil Works
Item Rate
30 days
RAMBAN
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
EXECUTIVE ENGINEER REW DIVISION RAMBAN
Exempted
18 Feb 2022
5 Feb 2022
14 Feb 2022
5 Feb 2022
12 Feb 2022
5 Feb 2022
Amount
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. ( Not exceeding 1.5 mtr in width ) and for shafts , wells, cesspits and the like not exceeding 10sqm on plan, depth upto1.5 mtr including disposal of excavated earth up to 1 mtr from cutting edge, disposed earth to be levelled and neatly dressed in all kinds of soil
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering .All work up to plinth level . 1:5:10 ( 1 cement :5 fine sand :10 graded stone aggregate 40 mm nominal size ) Nallah.
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering all work up to plinth level 1:3:6 ( 1 cement :3coarse sand :6 graded stone aggregate 20 mm nominal size) Cr including all carriages
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering .All work up to plinth level . 1:2:4( 1 cement :2 fine sand :4graded stone aggregate 40 mm nominal size ) including all carriages
P LAYING DRY STONE BOUNDER FILLING IN HORIZANTAL SURFACE
Provinding and laying in position, specified grade of reinforced cement conc. excluding the cost of centering, shuttering, finishing and reiforcement. All work up to plinth level. 1:1.5:3 (1 cement:1.5 coarse sand :3graded stone agg. 20 mm nominal )
Reinforcement for RCC work including straightening,cutting bending, placing
Centring and shuttering including strutting propping etc. and removal of form for :-Foundations, footings, bases of columns etc for mass concrete
Random Rubble Masonry with hard stone from Nallah in foundation & plinth including levelling up with cement concrete 1:6:12 ( 1 cement :6 coarse sand :12 graded stone agg.20 mm nominal size ) at plinth level with Cement mortar 1:6( 1 cement : 6 coarse sa
M/s Abdul Hamid Naik
MOHD RAFIQ NAIK
BHAT CONSTRUCTIONS
MOHD RAFIQ NAIK
MOHD ISHAQ
Nazir Ahmed
Abdul Gaffar Chopan
SH. NAWAZ AHMED NAIK
NAZIR AHMED SHAN
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .