| 1 | L1₹54.7 LAccepted-AOC KHALINI DISTT SHIMLA | SHIMLA | SHIMLA | HIMACHAL PRADESH | L1 | Accepted-AOC AOC | |
| 2 | L2₹55.7 L+₹98,633 (1.80%)Rejected-Finance | L2 | Rejected-Finance 2nd Lowest |
Tender Value
Refer Docs
EMD Value
₹1.1 L
Closing Date
22 Apr 2026, 11:00 amClosed
Executive Engineer kasumpti Division HPPWD Shimla3
Executive Engineer kasumpti Division HPPWD Shimla3
Pavement correction with cement grouted Bituminous Mix in Km 0/00 to 7/300
2026_PWD_134432_3
SD-I-CTR-Tender-1051-70 dated 16-04-2026
Open Tender
Civil Works
Percentage
90 days
Junga
As per SBD
13 documents required · 13 mandatory
₹2,000
₹1.1 L
5 May 2026
17 Apr 2026
22 Apr 2026
17 Apr 2026
22 Apr 2026
17 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved material. Hard Roack blasting prohibited and their intermediate classification of soils including, dewatering wherever required, setting of to the required lines, levels as shown on the drawing and directed by the Engineer -in-charge at site, according to the HP.PWD. specification of 1990 (one thousand nine hundred ninety) volume-I (one) and sorting out useful and unuseful material and transportation of the unuseful material for disposing at dumping site (To be arranged by the contractor) including payment of prescribed charges of dumping to the owner of dumping site as per satisfaction of Engineer-in-Charge through all modes of transportation including head load, animal load or mechanical means along with its leveling fine dressing and with all kinds of labour, machineries, tools equipments and safety measures and incidentals necessary to complete the work by mechanical means and labour (if required).All useful material such as stones, shingles aggregate and slates shall be properly stacked at site to the maximum possible extent in all leads and lifts through all modes of transportation the usefull stones as per the direction of the Engineer-in-Charge. Any loss to the public and private propriety during the course of execution and disposal of serviceable and unserviceable materials shall be the absolute responsibility of the contractor and shall have to be duly compensated by him in all respects including all incidental charges. The rate is including octroi, royality, Malkana, toll tax, and any other taxes imposed by the Government but excluding GST. | - | Per Cubic Metre | - | - |
| 2 | Providing and laying concrete for plain/reinforced concrete in open foundations complete as per drawing and technical specification clauses 802,803,1202 and 1203 including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge.(a) Cement Mortar 1:3:6(one cement:Three sand:Six graded stone aggregate 20mm(Twenty milimetre) nominal size). The rate is including octroi, royality, Malkana, toll tax, and any other taxes imposed by the Government but excluding GST. | - | Per Cubic Meter | - | - |
| 3 | Providing and laying concrete for plain/reinforced concrete in open foundations complete as per drawing and technical specification clauses 802,803,1202 and 1203 including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge.(a) M 25 Cement Mortar 1:1:5:3(One cement:One point Five sand:Three graded stone aggregate 20mm(Twenty milimetre) nominal size).The rate is including octroi, royality, Malkana, toll tax, and any other taxes imposed by the Government but excluding GST. | - | Per Cubic Metre | - | - |
| 4 | Scarifying the existing bituminous and surface to a depth of 150mm and disposal of scarified material with in all leads and lifts as per Technical Specification Clause 301.4 as per the including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge. The rate is including octroi, royality, Malkana, toll tax, and any other taxes imposed by the Government but excluding GST. | - | Per Square Metre | - | - |
| 5 | Loosening of the ground upto a level of 500mm below the subgrade level, watered, graded and compacted in layers to meet requirement of tables 300.2 for subgrade consturction as per entire satisfaction including carriage of materials in all leads and lifts as per the directions of the Engineer-in-Charge. The rate is including octroi, royality, Malkana, toll tax, and any other taxes imposed by the Government but excluding GST. | - | Per Cubic Meter | - | - |
| 6 | Providing and laying spreading and compacting stablised base layer as per MORTH specification including premixing the material with water of OMC in Mechancial mix plant mixing all aggregates and approved stabilizer developed by CRRI in correct proportion strictly as per job mix formula and carriage of mix material by tippers to site, laying in uniform layers with paver in sub base/base course on well prepared surface and compacting with viberatory roller to achieve the desired density under supervision of Engineer-in-Charge and technical team of CRRI. The rate is including octroi, royality, Malkana, toll tax, and any other taxes imposed by the Government but excluding GST. | - | Per Cubic Meter | - | - |
| 7 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405 including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge. (a) By Mechanical Means. The rate is including octroi, royality, Malkana, toll tax, and any other taxes imposed by the Government but excluding GST. | - | Per Cubic Metre | - | - |
| 8 | Providing laying of surface dressing course consisting of a layer of bitumonus binder, followed by a cover of crushed stone chipping, 9.50mm nominal size @ 0.008cum per square meter nominal size, with bitumen emulsion RS-I at the rate of bitumen Emulsion @ 1.40kg (at the rate one decimal four zero kilogram) per square meter of road surface to required line, grade and level to serve as wearing course on a previously prepared base and rolling complete with three wheel roller 80-100 Kn static roller finished to required level and grade as per MORD technical specification clasue 507 including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge. The rate is including octroi, royality, Malkana, toll tax, and any other taxes imposed by the Government but excluding GST. | - | Per Square Metre | - | - |
| 9 | Providing and applying primer coat with Bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.85 Kg/Sqm (Zero point Eighty five Kilogram) per Square meter. using mechanical means as per Techanical Specification Clause 502 including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge. The rate is including octroi, royality, Malkana, toll tax, and any other taxes imposed by the Government but excluding GST. | - | Per Square Metre | - | - |
| 10 | Providing applying tack coat with bitumen emulsion (RS-I) using emulsion distributor at the rate of 275 kg ./sqm ( Two hundred Seventy five kilogram/square metre) on prepared dry and hungry bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503 including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge. The rate is including octroi, royality, Malkana, toll tax, and any other taxes imposed by the Government but excluding GST. | - | Per Square Metre | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.48 MB
SBD5510236.pdf
Tender Documents • 10.79 MB
BOQ_198855.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .