Loading…
Loading…
Tender Value
₹7.3 L
EMD Value
₹7,320
Closing Date
5 Oct 2026, 3:00 pm
Executive Engineer
Executive Engineer, PWD., Buildings (C and M) Division, Tirunelveli
Providing Garbage shed arrangements in PMJVK and Critical care Block Rear side in Tirunelveli Medical College Hospital at Tirunelveli District.
2026_PWD_705144_1
5(1) EE/2026-27 dated.15.09.2026
Open Tender
Civil Works - Buildings
Lump-sum
90 days
Tirunelveli medical college hospital
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹7,320
17 Sept 2026
17 Sept 2026
6 Oct 2026
17 Sept 2026
5 Oct 2026
17 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work Open excavation by Mechanical Means for Open Earthwork in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers. | 16.55 | M3 | 198.13 | ₹3,279.05 |
| 2 | Cement Concrete 1:5:10 (One cement, Five crushed stone sand and Ten hard broken stone) using 40 mm gauge hard broken jelly for foundation including laying, consolidating, finishing, rendering the top surface rough to receive the floor, curing, etc. complete complying with standard specification. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers | 1.85 | M3 | 5,422.95 | ₹10,032.46 |
| 3 | Plain Cement Concrete 1:2:4 (one cement, two crushed stone sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers. | 1.9 | M3 | 6,890.53 | ₹13,092.01 |
| 4 | Cement Concrete 1:5:10 (One cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken jelly for flooring including laying,nsolidating, finishing, rendering the top surface rough to receive the floor, curing, etc. complete multiplying with standard specification and as directed by the departmental officers. The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers | 0.4 | M3 | 5,422.95 | ₹2,169.18 |
| 5 | Refilling with excavated earth other than sand with an initial head load of 100 mts. and depositing the earth as shown by the departmental officers in layers of not more than 15cm thick well rammed with surface vibrator, watered and consolidated etc., complete complying with standard specification and as directed by the departmental officers. | 13.5 | M3 | 162.52 | ₹2,194.02 |
| 6 | Supplying and filling in foundation, basement, etc with conveyed earth in layers of not more than 150mm thick layers well watered, rammed with surface vibrator and consolidated including conveyance charges etc. complete complying with standard specification and as directed by the departmental officers. | 23.1 | M3 | 381.86 | ₹8,820.97 |
| 7 | Supplying and filling in foundation, basement, etc with filling stone dust in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 10.2 | M3 | 304.17 | ₹3,102.53 |
| 8 | Labour charges for Removing and Re-laying of Paver block of 83mm thick over the existing sand filling layer and making consolidation by compressor laying to true alignment for required designs as decided by the departmental authorities etc., complete as a | 64 | M2 | 525 | ₹33,600 |
| 9Brick work in Cement Mortar 1:5 using best quality Fly ash Brick of size 230x110x75mm with class designation of 7.5 conforming to IS 13757-1993 or IS 12894-2002 for foundation and basement including Cost of Mortar Plasticizer, curing, etc., complete complying with standard specification and as directed by the departmental officers. Brickwork shall be done as per IS 2212-1991 adopting English Bond generally.other type of bond shall be done as directed by the Executive Engineer in charge. | |||||
| 9.01 | In Foundation and basement | 12.3 | M3 | 7,410.09 | ₹91,144.11 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.11 MB
Tendercondition1.pdf
Tender Documents • 0.97 MB
BOQ_847595.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .