Tender Value
₹2.5 Cr
EMD Value
₹12.1 L
Closing Date
5 Oct 2026, 12:00 pm
Superintending Engineer
Office of the Superintending Engineer Gorakhpur Circle PWD Gorakhpur
Construction of 4 No- Type -4 Residential Building for Officer/ Employee in district Maharajganj Lot No - 3 of 3
2026_CEGKP_1189460_3
7254/33Com-Gkp Circle/2026 Dated 16-09-2026
Open Tender
Civil Works
Percentage
300 days
Mahrajganj
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹12.1 L
26 Sept 2026
26 Sept 2026
5 Oct 2026
26 Sept 2026
5 Oct 2026
26 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.50 meter and lead upto 30 meter and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and sides of foundation trenches or into the plinth and removal and disposal of sur-plus earth as directed by the Engineer incharge up to a distance of 30 meters from the foundation trenches. As per DSR No. 2.6.1 (Upto 1.50 Meter depth) (Including Labour Cess but GST will be paid extra as per applicable) | - | CUM | 121 | - |
| - | Excavating, supplying and filling of Cartage earth (including royalty) by mechanical transport upto a lead of also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. As per DSR No. 2.25,a (Including Labour Cess but GST will be paid extra as per applicable) | 450 | CUM | 348 | ₹1,56,600 |
| - | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. As per DSR No. 2.27 (Including Labour Cess but GST will be paid extra as per applicable) | - | CUM | 1,450 | - |
| - | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) ,including cost of form- work,in foundation and floors. as per DSR No. 4.1.8 (Including Labour Cess but GST will be paid extra as per applicable) | 192 | CUM | 4,670 | ₹8,96,640 |
| - | Treatment of soil under existing floors using chemical emulsion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1 :2 (1 cement : 2 Coarse sand) to match the existing floorWith Chlorpyriphos/Lindane E.C. 20% with 1% concentration. As per DSR No. 2.35.3.1 (Including Labour Cess but GST will be paid extra as per applicable) | - | SQM | 212 | - |
| - | Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. Footing. As per DSR No. 5.33.1 (Including Labour Cess but GST will be paid extra as per applicable) | 124 | CUM | 6,520 | ₹8,08,480 |
| - | Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge.Lintel, beam,slabAs per DSR No. 5.33.2.1 (Including Labour Cess but GST will be paid extra as per applicable) | - | CUM | 6,750 | - |
| - | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in .foundation and plinth in :Cement mortar 1:6 (1 cement : 6 coarse sand) As per DSR No. 6.1.2 (Including Labour Cess but GST will be paid extra as per applicable) | 187 | CUM | 4,900 | ₹9,16,300 |
| - | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in : Cement mortar 1:6 (1 cement : 6 coarse sand) As per DSR No. 6.4.2 (Including Labour Cess but GST will be paid extra as per applicable) | - | CUM | 6,250 | - |
| - | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in : Cement mortar 1:4 (1 cement : 4 coarse sand). As per DSR No. 6.4.1 (Including Labour Cess but GST will be paid extra as per applicable) | - | CUM | 6,400 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.39 MB
Tendernotice_2.pdf
PDF • 0.46 MB
T27254.pdf
Tender Documents • 0.66 MB
BOQ_2241035.xls
BOQ • 0.48 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .