| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.7 LAccepted-AOC W D BUILDING JP ROAD BHARALUMUKH GUWAHATI 781009 ASSAM | KAMRUP METRO | ASSAM | 781009 | ₹31.7 L Quoted ₹32.7 L | L1 | Accepted-AOC L1 bidder |
| 2 | L2₹33.7 L+₹99,767.50 (3.05%)Rejected-Finance VILL TOKOWBARI P O BUROIGHAT P S HELEM DIST BISWANATH ASSAM PIN 784179 | BISWANATH | ASSAM | 784179 | ₹33.7 L+₹99,767.50 (3.05%) | L2 | Rejected-Finance Other than lowest bidder |
| 3 | L3₹35.8 L+₹3.0 L (9.31%)Rejected-Finance HOUSE NO 8A OPPOSITE ST JOHN S SCHOOL AK AZAD ROAD REHABARI GUWAHATI ASSAM 781008 | KAMRUP METRO | ASSAM | 781008 | ₹35.8 L+₹3.0 L (9.31%) | L3 | Rejected-Finance Other than lowest bidder |
| 4 | L4₹36.3 L+₹3.6 L (10.9%)Rejected-Finance HOUSE NO 2 SATGAON MAIN ROAD NEAR BAILEY WATER FACTORY P O UDAYAN VIHAR DIST KAMRUP METRO GUWAHATI ASSAM 781171 | GUWAHATI | KAMRUP METRO | ASSAM | 781171 | ₹36.3 L+₹3.6 L (10.9%) | L4 | Rejected-Finance Other than lowest bidder |
| 5 | L5₹37.0 L+₹4.3 L (13.1%)Rejected-Finance | ₹37.0 L+₹4.3 L (13.1%) | L5 | Rejected-Finance Other than lowest bidder |
| Sl No | Description | Qty | Unit | KAKWANI BUILDERS L5 | PK ENGINEERING L1 | M/S Bharat Construction L8 | M/S M Ahmed and Co. L7 | Amit Sharma L2 | LAXMI CONSTRUCTION L4 | VENUS TRADING CORPORATION L3 | M/s Talukdar Construction L6 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Demolition of brick work, built in cement mortar, including all quoins, arches, pillars including coping etc. complete all as specified and as directed. | 12 | Cum | 470 ₹5,640 | 400 ₹4,800 Lowest | 700 ₹8,400 | 650 ₹7,800 | 400 ₹4,800 Lowest | 650 ₹7,800 | 600 ₹7,200 | 580 ₹6,960 |
| 2.00 | Material and labour for brick work with sub class "B" bricks, straight or curved on plan exc 6m mean radius built in CM 1:4 complete all as specifed and directed. | 12 | Cum | 8,750 ₹1,05,000 | 7,500 ₹90,000 | 8,800 ₹1,05,600 | 8,500 ₹1,02,000 | 6,000 ₹72,000 Lowest | 8,500 ₹1,02,000 | 8,600 ₹1,03,200 | 8,600 ₹1,03,200 |
| 3.00 | Taking down plaster of any description in cement mortar from brick/concrete surfaces including racking out joints, hacking for key, scrubbing down with water etc complete all as specified and directed. | 398 | Sqm | 18 ₹7,164 | 15 ₹5,970 Lowest | 25 ₹9,950 | 30 ₹11,940 | 700 ₹2,78,600 | 27 ₹10,746 | 24 ₹9,552 | 25 ₹9,950 |
| 4.00 | Material and labour for 10mm thick rendering on other than fair faces of brick wall in CM 1:6 finished even and smooth with out using extra cement complete all as specified and directed. | 195 | Sqm | 255 ₹49,725 | 220 ₹42,900 | 258 ₹50,310 | 270 ₹52,650 | 190 ₹37,050 Lowest | 268 ₹52,260 | 250 ₹48,750 | 260 ₹50,700 |
| 5.00 | Material and labour for rendering 15mm thick external in CM 1:4 on fair faces of brick/concrete surfaces finished even and smooth without using exta cement with using WPC @3% by the wt of cement complete all as specified and directed. | 243 | Sqm | 280 ₹68,040 | 240 ₹58,320 | 272 ₹66,096 | 270 ₹65,610 | 200 ₹48,600 Lowest | 205 ₹49,815 | 260 ₹63,180 | 265 ₹64,395 |
| 6.00 | Material and labour for 5mm thick rendering on fair faces of brick or concrete ceiling surface in CM 1:3 finished even and smooth with out using extra cement complete all as specified and directed. | 80 | Sqm | 195 ₹15,600 | 190 ₹15,200 | 200 ₹16,000 | 220 ₹17,600 | 210 ₹16,800 | 149 ₹11,920 Lowest | 190 ₹15,200 | 200 ₹16,000 |
| 7.00 | Material and labour for preparation of newly plastered surface of walls and applying two coat of acrylic exterior weather coat paint (Weather proof paint with quality of dust guard, anti algal and anti fungal paint with minimum 05 years performance warranty, over a coat of approved primer over 1.00 mm thick water proof putty of same manufacturer complete all as specified and directed. | 213 | Sqm | 145 ₹30,885 | 125 ₹26,625 | 160 ₹34,080 | 150 ₹31,950 | 135 ₹28,755 | 59 ₹12,567 Lowest | 150 ₹31,950 | 146 ₹31,098 |
| 8.00 | Material and labour for preparing of newly plastered wall surface and applying two coats of cement base paint over a coat of primer complete all as specified and directed. | 30 | Sqm | 60 ₹1,800 | 40 ₹1,200 Lowest | 62 ₹1,860 | 60 ₹1,800 | 50 ₹1,500 | 122 ₹3,660 | 42 ₹1,260 | 55 ₹1,650 |
| 9.00 | Material and labour for preparation of new plastered surfaces , applying white cement based wall care putty on the surfaces with minimum 1.00 mm uniform thickness making surface absolutely smooth by grinding with sand paper and applying two coats of acrylic distemper over a coat chalk whiting of approved shade on surface of wall complete all as specified and directed. | 195 | SQM | 108 ₹21,060 | 95 ₹18,525 | 124 ₹24,180 | 125 ₹24,375 | 140 ₹27,300 | 33 ₹6,435 Lowest | 115 ₹22,425 | 110 ₹21,450 |
| 10.00 | Material and labour for preparing of newly plastered ceiling surface and applying three coats of white wash complete all as specified and directed. | 80 | Sqm | 24 ₹1,920 | 15 ₹1,200 | 35 ₹2,800 | 30 ₹2,400 | 12 ₹960 Lowest | 27 ₹2,160 | 24 ₹1,920 | 30 ₹2,400 |
Tender Value
₹38 L
EMD Value
₹76,000
Closing Date
11 Jul 2025, 6:00 pmClosed
GE Narangi
GE Narangi C/o 99 APO
REPAIR REPLACEMENT OF FLOORING KOTA STONE TILING JOINERY SANITARY FTTINGS ROOF SHEET AND OTHER CONNECTED WORK AT DEPOT/ADM AREA OF 41 VEH COY IN THE AOR OF THE AGE BR I UNDER GE NARANGI
2025_MES_716124_1
8078/B/E8
Open Tender
Civil Works
Item Rate
180 days
Guwahati
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
GE Narangi
₹76,000
Yes
28 Aug 2025
21 Jun 2025
14 Jul 2025
21 Jun 2025
11 Jul 2025
5 Jul 2025
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .