Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹84,224.02Admitted-Finance | -16.00% | ₹84,224.02 | L1 | Admitted-Finance |
| 2 | L2₹94,250.69Admitted-Finance | -6.00% | ₹94,250.69 | L2 | Admitted-Finance |
Tender Value
₹1 L
EMD Value
₹2,000
Closing Date
17 Mar 2026, 6:00 pmClosed
Er. Fayaz Ahmed Sheikh
EXECUTIVE ENGINEER OFFICE REW RAMBAN
AS PER NIT
2026_RDPR_306008_9
NIT NO 105 OF REW RAMBAN 2025 26 UNDER HEAD CDF BLOCK RAMSOO
Open Tender
Civil Works
30 days
Ramban
AS PER NIT
2 documents required · 2 mandatory
₹600
Rural Development and Panchayati Raj
₹2,000
20 Mar 2026
12 Mar 2026
18 Mar 2026
12 Mar 2026
17 Mar 2026
12 Mar 2026
Earh work in excavation by manual means over areas ( exceeding 30 cm and up to 1.5 mtr in width and 1.5 mtr in depth as well as 10 sqm on plan ) incl. disposal of excavated earth up to 1 mtr from cutting edge, disposed earth to be levelled and neatly dressed in AKS
Dry boulder stone Pitching/soling on horizontal surfaces
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size).
Boulders
Brickwork with common Burnt clay FPS
Extra for Brickwork in superstructure above plinth level and upto floor level.
Providing and laying in position Reinforced cement concrete 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 40 mm nominal size) in suspended roofs, balconies, landings and stair cases, roofs having slope upto 15 upto floor V Level including curing but excluding the cost of centring and shuttering.
Steel Reinforcement for RCC work including cutting, bending, binding and placing in position all complete (TMT bars of Fe500 Grade)
Centering and shuttering including strutting, propping etc. and removal of form for:Foundations , plinth, footing bases of columns etc for mass concrete.
Centering and shuttering including strutting, propping etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platforms.
Centering and shuttering including strutting, propping etc. and removal of form for:Edges of slabs and breaks in floors and walls 20 cm wide
15 mm thick cement plaster of mix 1:4 (1 cement: 4 fine sand)
12 mm thick cement Plaster of mix 1:4 (1 cement :4 fine sand)
Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete.40mm thick with 20 mm nominal size stone aggregate.
Wall painting with plastic emulsion paint of approved brand and manufacture to give an even shade. Two or more coats on new work.
Providing and fixing of vertified floor tiles in different sizes (600x600)
Providing and fixing of ceramic wall tiles (300x450)
Provision for Door/Ventilator
Provision for water tank/WC Gi pipes etc
Carriage of Cement from source to site by mechanical transport or animal transport or by head load
Carriage of Sand from source to site by mechanical transport or animal transport or by head load
Carriage of Stone Aggregates from source to site by mechanical transport or animal transport or by head load
Carriage of stones from source to site by mechanical transport or animal transport or by head load
CIB( citizen information board of Granite Stone) ( complete job)
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.92 MB
BOQ_993761.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid