Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.9 LAccepted-AOC TOHANA ROAD BHUNA DISTRICT FATEHABAD | BHUNA | FATEHABAD | HARYANA | L1 | Accepted-AOC l1 | |
| 2 | L2₹4.1 L+₹22,091.76 (5.63%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹4.2 L+₹25,853.41 (6.59%)Rejected-Finance 3701 3701 NEAR SAINI HOSPITAL UKLANA ROAD BHUNA 125111 | FATEHABAD | HARYANA | 125111 | L3 | Rejected-Finance L3 | |
| 4 | Not Admitted-Fee/PreQual/Technical 575 TOHANA 125120 | TOHANA | FATEHABAD | HARYANA | 125120 | - | Not Admitted-Fee/PreQual/Technical Others-On the request of agency bid could not be admitted. |
Tender Value
₹4.2 L
EMD Value
₹8,463
Closing Date
17 Mar 2026, 5:00 pmClosed
Narinder Pawar
Municipal Committee Bhuna
Const. work at Guru Ravidas Samaj Sewa Samiti, Bhuna
2026_HRY_506878_1
2026514E0FAD 4CB3 4B39 A945 AFAB7E7AA073275ULB
Open Tender
Civil Works
Works
150 days
Bhuna
2 documents required · 2 mandatory
₹500
₹8,463
Yes
2 Apr 2026
7 Mar 2026
18 Mar 2026
7 Mar 2026
17 Mar 2026
7 Mar 2026
7 Mar 2026 - 9 Mar 2026
[10.7]Providing and laying of conglomerate floor 50mm thick cement concrete topping 1:2:4 [Through Rate]
[13.30.1]Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. 1. Hot finished welded type tubes [Through Rate]
[4.12.1]Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. 1. All kinds of soil [Through Rate]
[6.1.8]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 8. 1:5:10 (1 cement : 5 fine sand : 10 graded stone aggregate 40 mm nominal size) [Through Rate]
[6.14.1]Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) [Through Rate]
[6.30.3]Centering and shuttering including strutting, propping etc. and removal of form for 3. Suspended floors, roofs, landings, balconies and access platform [Through Rate]
[6.33.3]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 3. Cold twisted bars [Through Rate]
[7.20.2]Brick work with common burnt clay modular bricks of class designation 10.5 in foundation and plinth in: 2. Cement Mortar 1:6 (1 cement : 6 coarse sand) [Through Rate]
[9.22.2]Providing corrugated G.S. sheet roofing including vertical / curved surface fixed with polymer coated J or L hooks, bolts and nuts 8 mm diameter with bitumen and G.I. limpet washers or with G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete (up to any pitch in horizontal/ vertical or curved surfaces), excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required. 2. 0.80 mm thick with zinc coating not less than 275 gm/m² [Through Rate]
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.73 MB
BOQ_585630.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .