| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 LAccepted-AOC | ₹1.6 L | L1 | Accepted-AOC L1 |
| 2 | L2₹1.7 L+₹2,467.48 (1.50%)Rejected-Finance | ₹1.7 L+₹2,467.48 (1.50%) | L2 | Rejected-Finance L2 |
| 3 | L3₹1.7 L+₹4,112.47 (2.50%)Rejected-Finance | ₹1.7 L+₹4,112.47 (2.50%) | L3 | Rejected-Finance L3 |
Tender Value
₹1.6 L
EMD Value
₹3,300
Closing Date
25 Mar 2026, 5:00 pmClosed
EE/WS/TW
5 SN BANERJEE ROAD KOLKATA-700013
REPAIRING OF 118 NOS. SMALL DIA TUBEWELLS AT DIFFERENT LOCATIONS IN BOROUGH-V AND VII
2026_KMC_1021500_1
KMC/TW/RP-118/BR-V_VII/16/25- 26
Open Tender
CIVIL WORKS
Percentage
120 days
DIFFERENT AREAS UNDER BOROUGH- V AND VII
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹3,300
16 Sept 2026
13 Mar 2026
27 Mar 2026
13 Mar 2026
25 Mar 2026
13 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | (C) III: Labour Rate for Sanitary and Plumbing 1.Plumbing Mistry NOTE:The above rates are exclusive of 10 % profit and 1% Labour welfare cess, which would be admissible to the Contractor, but contractual percentage will not be applicable on the above rates. | 118 | EA | 326 | ₹38,468 |
| 2 | (C) III: Labour Rate for Sanitary and Plumbing 5.Plumbing Helper NOTE:The above rates are exclusive of 10 % profit and 1% Labour welfare cess, which would be admissible to the Contractor, but contractual percentage will not be applicable on the above rates. Page 113 of 124 | 354 | EA | 270 | ₹95,580 |
| 3 | SECTION(A) PLUMBING WORKS (A)-(VI) TUBE WELL (b) Repair workes 2 Repairing chocked up tube well by cleaning and washing with chemical including pumping with powerful pump. (i) 40 mm to 50 mm dia. tube well upto 100 metre deep | 4 | EST | 2,347 | ₹9,388 |
| 4 | CARRYING ETC STORE MATERIALS VIZ PIPE, STRAINER, PUMP ETC FROM STORE TO WORK SITE. (II) FOR DEPTH UPTO 250 M (AS PER APPROVAL OF M.I.C. ITEM NO. M-46.4 DATED 23.6.2017.) | 4 | EA | 1,097.25 | ₹4,389 |
| 5 | CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC. 1.10 Hire and labour charges for coir rope fencing 25 mm dia rope single on 120 mm dia bamboo posts 1.40 m above G.L and 600 mm below G.L, 1.50 m apart including digging holes complete. | 885 | MTR | 17 | ₹15,045 |
| 6 | Sub Total | - | - | - | - |
| 7 | GST 18% | 1 | Nos | - | - |
| 8 | CESS 1% | 1 | Nos | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.12 MB
TECHBID_PRICEBID.pdf
Tender Documents • 2.31 MB
TENDER_FORM.pdf
Additional Documents • 0.68 MB
BOQ_2510726.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .