Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.5 LAccepted-Finance | ₹3.5 L | 1 | Accepted-Finance Price Bid is evaluated |
| 2 | 2₹3.7 LAccepted-Finance | ₹3.7 L | 2 | Accepted-Finance Price Bid is evaluated |
| Sl No | Description | Qty | Unit | SMILA AGENCIES L1 | R.K.V. ENTERPRISES L2 |
|---|---|---|---|---|---|
| 1.00 | Inspection, overhauling and commissioning of Butterfly valve actuators for manual operation in condenser system
This work involves Overhauling of Gear box assembly of B.F.V, including dismantling of actuator, gear box assembly, inspection, renewal of spares if necessary and re assembling including cost of consumables and charges for T&Ps etc. | 8 | Nos | 1,74,800 ₹2.1 L | 1,80,000 ₹2.1 L |
| 2.00 | Inspection, overhauling and commissioning of ROTORK / CHECKOSLOVAKIA/ AUMA make actuators in Main turbine system inclusive of consumables for T&P's a)Dismantling of ROTORK/IND-MODACT/ANTRIEB/ AUMA make actuators mechanical assembly and overhauling. | 8 | Nos | 70,800 ₹83,544 | 76,400 ₹90,152 |
| 3.00 | Dismantling of ROTORK / CHECKOSLOVAKIA/ AUMA make actuators Electrical portion and renewal of spare if any required | 8 | Nos | 52,400 ₹61,832 | 55,600 ₹65,608 |
| 4.00 | Testing and commissioning the ROTORK / CHECKOSLOVAKIA / AUMA make actuator in hp Valves | 8 | Nos | 54,800 ₹64,664 | 60,400 ₹71,272 |
Tender Value
Refer Docs
EMD Value
₹4,000
Closing Date
2 Mar 2026, 2:00 pmClosed
CE/ TTPS
Chief Engineer, Tuticorin Thermal Power Station, Tuticorin 628004.
TTPS Mech II TM I Unit I Inspection overhauling and commissioning of condenser butterfly valves and steam line valves actuators during the forthcoming overhaul
2026_EB_656502_1
CE/TTPS/SE/M-II/No.456/2025-26
Open Tender
Miscellaneous Works
40 days
TTPS
As per BQR conditions in NIT
8 documents required · 8 mandatory
₹0
₹4,000
Yes
5 Mar 2026
13 Feb 2026
3 Mar 2026
13 Feb 2026
2 Mar 2026
13 Feb 2026
Inspection, overhauling and commissioning of Butterfly valve actuators for manual operation in condenser system This work involves Overhauling of Gear box assembly of B.F.V, including dismantling of actuator, gear box assembly, inspection, renewal of spares if necessary and re assembling including cost of consumables and charges for T&Ps etc.
Inspection, overhauling and commissioning of ROTORK / CHECKOSLOVAKIA/ AUMA make actuators in Main turbine system inclusive of consumables for T&P's a)Dismantling of ROTORK/IND-MODACT/ANTRIEB/ AUMA make actuators mechanical assembly and overhauling.
Dismantling of ROTORK / CHECKOSLOVAKIA/ AUMA make actuators Electrical portion and renewal of spare if any required
Testing and commissioning the ROTORK / CHECKOSLOVAKIA / AUMA make actuator in hp Valves
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
BOQ_787276.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid