| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.7 CrAccepted-Finance NOT AVAILABLE | ₹3.7 Cr | L1 | Accepted-Finance Accepted |
| 2 | L2₹3.7 CrAccepted-Finance | ₹3.7 Cr | L2 | Accepted-Finance Accepted |
| 3 | L3₹3.7 CrAccepted-Finance | ₹3.7 Cr | L3 | Accepted-Finance Accepted |
Tender Value
₹4.2 Cr
EMD Value
₹8.4 L
Closing Date
19 Aug 2026, 3:00 pmClosed
EE CD-XIX I and FC Deptt. Govt. of NCT of Delhi.
EE CD-XIX I and FC Deptt. Govt. of NCT of Delhi, Basaidarapur Office Complex, New Delhi-110027.
Reconstruction of (Ground Floor and First Floor) Chaupal at Village Sarangpur in Matiala Constituency AC-34
2026_IFC_296869_1
EE/CD-XIX/DB/2026-27/28
Open Tender
Civil Works
Works
365 days
Sarangpur village
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹8.4 L
19 Aug 2026
12 Aug 2026
19 Aug 2026
12 Aug 2026
19 Aug 2026
12 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth. 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed. All kinds of soil. | 25 | Cubic Metre | 177.5 | ₹4,437.5 |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50m. All Kinds of soil. | 874 | Cubic Metre | 260.3 | ₹2,27,502.2 |
| 3 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc, in layers not exceeding 20cm. in depth; consolidating each deposited layer by ramming and watering, lead up to 50m and lift upto 1.5m | 899 | Cubic Metre | 196 | ₹1,76,204 |
| 4 | Supplying and filling in plinth with Jamuna sand under floors including watering, ramming, consolidating and dressing complete | 128 | Cubic Metre | 2,123.75 | ₹2,71,840 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work upto plinth level 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 40 mm nominal size derived from natural sources) | 142 | Cubic Metre | 7,178.75 | ₹10,19,382.5 |
| 6 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing: 1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 1 | Cubic Metre | 9,895.2 | ₹9,895.2 |
| 7 | Providing and laying in position ready mixed or site batched design mix M-25 cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge, for the following grades of concrete.: Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. All works upto plinth level Concrete of M25 grade with minimum cement content of 330 kg /cum | 178 | Cubic Metre | 9,504.75 | ₹16,91,845.5 |
| 8 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge, for the following grades of concrete.: Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. All works above plinth level upto floor V level Concrete of M25 grade with minimum cement content of 330 kg /cum | 264 | Cubic Metre | 9,860.4 | ₹26,03,145.6 |
| 9.01 | Cantering and shuttering including strutting, propping etc. and removal of form for: (a) Foundations, footings, bases of columns etc. for mass concrete. | 434 | Square Metre | 392.15 | ₹1,70,193.1 |
| 9.02 | Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 61 | Square Metre | 842.5 | ₹51,392.5 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.63 MB
BOQ_395315.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].