Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.3 LAdmitted-Finance 1008 A PREMIER ENGINEERING COMPANY PURVI RITHANI MEERUT DELHI ROAD MEERUT UTTAR PRADESH 250103 INDIA | MEERUT | UTTAR PRADESH | 250103 | L1 | Admitted-Finance | |
| 2 | L2₹4.5 L+₹20,779.80 (4.80%)Admitted-Finance PROP NO A 80 FIRST FLOOR FLAT NO 3 CHATTAR PUR ENCLAVE PHASE 2 NEW DELHI SOUTH WEST DELHI DELHI 110074 | SOUTH DELHI | DELHI | 110074 | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Premier Engineering Company L1 | M G Traders and Engineers L2 |
|---|---|---|---|---|---|
| 1.00 | Moving electrode contact | 6 | Nos. | 70,500 ₹83,190 Lowest | 76,800 ₹90,624 |
| 2.00 | Fixed electrode contact | 6 | Nos. | 65,700 ₹77,526 Lowest | 69,000 ₹81,420 |
| 3.00 | Bus Bar Set | 2 | Set | 56,400 ₹66,552 Lowest | 59,000 ₹69,620 |
| 4.00 | Limit Switch with roller action for start and run | 2 | Nos. | 3,240 ₹3,823.2 Lowest | 3,500 ₹4,130 |
| 5.00 | Power contactor for shorting | 1 | Nos. | 41,850 ₹49,383 Lowest | 42,900 ₹50,622 |
| 6.00 | Auxiliary contractor 2NO+2NC | 2 | Nos. | 4,680 ₹5,522.4 Lowest | 5,000 ₹5,900 |
| 7.00 | Support insulator with nut bolt & Washer | 12 | Nos. | 19,440 ₹22,939.2 Lowest | 21,720 ₹25,629.6 |
| 8.00 | Dismantling of existing LRS damaged parts, cleaning of the starter tank and paint with red oxide inside tank and overhauling the LR starter. Replacement of defective spare parts from starter taping of all i/c aluminum cable joint properly and replacement of thimble if required and greasing of all movable parts as required. Filling of water with chemical solutions. Restoration, rectification and matching of all control wiring for main motor with necessary connection and testing the same at site ON Load. | 3 | Jobs. | 1,05,000 ₹1,23,900 Lowest | 1,06,500 ₹1,25,670 |
Tender Value
Refer Docs
EMD Value
₹9,000
Closing Date
5 Feb 2026, 3:00 pmClosed
EXECUTIVE ENGINEER (EM) M-11
GREATER KAILASH, PART-I, NEW DELHI
Repairing / servicing of advance make LRS of Pump sets no.1, 2 and 3 at Dakshinpuri HT BPS in Ambedkar Nagar Constituency AC-48.
2026_DJB_285678_15
NIT No. 24/EE(EM)M-11/(25-26)
Open Tender
Electrical Work/ Equipment
Works
60 days
EXECUTIVE ENGINEER (E/M) M-11
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
Delhi Jal Board
₹9,000
Yes
13 Feb 2026
27 Jan 2026
5 Feb 2026
27 Jan 2026
5 Feb 2026
27 Jan 2026
Moving electrode contact
Fixed electrode contact
Bus Bar Set
Limit Switch with roller action for start and run
Power contactor for shorting
Auxiliary contractor 2NO+2NC
Support insulator with nut bolt & Washer
Dismantling of existing LRS damaged parts, cleaning of the starter tank and paint with red oxide inside tank and overhauling the LR starter. Replacement of defective spare parts from starter taping of all i/c aluminum cable joint properly and replacement of thimble if required and greasing of all movable parts as required. Filling of water with chemical solutions. Restoration, rectification and matching of all control wiring for main motor with necessary connection and testing the same at site ON Load.
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.59 MB
BOQ_378102.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .