Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹2.0 L
Closing Date
5 Sept 2026, 5:00 pm
E O NPP Hata
E O NPP Hata
Construction of 5 TDP Wet Waste Processing Pit Compost IN NPP Hata
2026_DOLBU_1179739_1
248
Open Tender
Civil Works
Percentage
180 days
NPP Hata
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,000
E O NPP Hata
₹2.0 L
25 Aug 2026
25 Aug 2026
7 Sept 2026
26 Aug 2026
5 Sept 2026
26 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | surface Dressing of groundincluding removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and iin up to 1.5 m. Atl kinds of soil. | - | sqm | 12 | - |
| 2 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in-Charge 2.1.1. All kinds of soil.(As per s.i. 251) | 1 | cum | 120 | ₹119.88 |
| 3 | Earth work in cutting or in embankement in ordinary soil+loading ,unloading cartage upto 3.00 km [As per S.i. No-253,231(a)235(a)] | - | cum | 311 | - |
| 4 | Providing & Laying of C.C. in 1:6:12 with c/s and 40 mm . in foundation of Floor i/c all labour ,materials and T&P etc.(As per s.i. 273) | - | cum | 3,170 | - |
| 5 | P/L of C.C in 1:2:4 (1 cement :2 f.sand:4 stone ballast) including supply of all materials T&P etc labour required for the proper completion of the work. (As per S.i. No-279) | - | cum | 6,460 | - |
| 6 | R.C.C. Work in column / slab /wall 1:2:4 with cement, coarse sand, 20mm gauge stone grit I/C all complete. (As per s.i. 289) | 1 | cum | 9,560 | ₹9,550.44 |
| 7 | M150 Brick Work in 1:4 cfs mortar in substructure i/c all labour & T&P etc. (As per s.i. 305) | - | cum | 4,555 | - |
| 8 | 12 mm thick Internal Plaster in1:4 with f/s mortar in wall i/c all materials, labour & T&P etc. S.I. 586 | 1 | sqm | 120 | ₹119.88 |
| 9 | Providing & laying steelbars including cutting binding, p/acing and complete in all respect | 1 | qtl | 6,000 | ₹5,994 |
| 10 | M.S. iron Door and window with ms angie and ms sheet l/c all complete as directed by engineer in charge as chapter 10 S.i no 503 | 1 | qtl | 5,700 | ₹5,694.3 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.81 MB
BOQ_2218354.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].